Jurisdiction: US — Minnesota (Xcel / MISO)
UMore Park, Rosemount, Dakota County, Minnesota; 715,000 sq ft, >$800M, LEED Gold. Minnesota's first hyperscale DC. Built by Mortenson.
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Infrastructure | hard cap | 0 | Meta Rosemount Data Center | Hard cap "missing_interconnection" (health ≤ 55, §B.3): no power-category milestone on file 18+ months after announcement (2024-03-14). [triggered, not binding] |
| Capital | baseline | 40 | Meta Rosemount Data Center | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | Meta Rosemount Data Center | Newest capital evidence is 2024-03-16 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | staleness decay | -20 | Meta Rosemount Data Center | Newest regulatory evidence is 2024-03-16 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | baseline | 70 | Meta Rosemount Data Center | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | Meta Rosemount Data Center | Newest infrastructure evidence is 2024-03-16 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | Meta Rosemount Data Center | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | Meta Rosemount Data Center | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2024-03-14). |
| Schedule | staleness decay | -25 | Meta Rosemount Data Center | Newest schedule evidence is 2024-03-14 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Announcement · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Meta | — | — | |
| Xcel Energy | — | — | |
| Mortenson | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Meta Data Centers Blog · Mar 14, 2024 · backs: actual date
https://datacenters.atmeta.com/2024/03/hello-rosemount/
Minnesota Governor's Office · Mar 14, 2024 · backs: announced date, capex usd, status
https://mn.gov/governor/newsroom/press-releases/?id=1055-614120
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Data Center Dynamics · relevance 0.95
· Meta Data Centers Blog · relevance 0.70
· Minnesota Governor's Office · relevance 0.90
Xcel Energy Stories · relevance 0.85
mn.gov · relevance 0.90