Jurisdiction: Argentina
Distributed program: 11 former telephone exchange sites across northern Argentina to be converted into edge data centers; complements 5 existing B2B data centers (Buenos Aires city, Buenos Aires province incl. Pacheco, 2x Cordoba, Corrientes)
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Regulatory | staleness decay | -20 | Telecom Argentina Edge AI Data Center Conversion Program | Newest regulatory evidence is 2025-09-02 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Capital | baseline | 40 | Telecom Argentina Edge AI Data Center Conversion Program | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Infrastructure | baseline | 70 | Telecom Argentina Edge AI Data Center Conversion Program | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | prior use interconnection | +8 | Telecom Argentina Edge AI Data Center Conversion Program | Brownfield site — Repurposed industrial / telecom site — inherits an existing energized grid interconnection, materially de-risking the scarcest deliverability bottleneck for a new AI/HPC load (§B.2.3). |
| Infrastructure | staleness decay | -25 | Telecom Argentina Edge AI Data Center Conversion Program | Newest infrastructure evidence is 2025-09-02 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | Telecom Argentina Edge AI Data Center Conversion Program | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | Telecom Argentina Edge AI Data Center Conversion Program | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2025-09-02). |
| Schedule | staleness decay | -25 | Telecom Argentina Edge AI Data Center Conversion Program | Newest schedule evidence is 2025-09-02 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Announcement · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Telecom Argentina | 100% | — | |
| Telecom Argentina | — | — | |
| Telecom Argentina | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
TeleSemana · Sep 2, 2025 · backs: actual date, status
https://www.telesemana.com/blog/2025/09/02/telecom-argentina-convierte-centrales-telefonicas-en-data-centers-para-impulsar-la-inteligencia-artificial-y-el-5g/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· RCR Wireless · relevance 0.35
· TeleSemana · relevance 0.65