Compute Institute
Ratings for the physical buildout of AI
Meta El Paso Data Center

Meta El Paso Data Center

Construction
Confirmed

Jurisdiction: US — Texas (ERCOT)

El Paso, TX; coordinates approximate to city, campus in far-east El Paso

Capacity
100 MW basis: unspecified
GPUs (est.)
Capex
$10.0B
Announced
Dec 31, 2023
Target operational

Delivery health score

66 /100
66/100

Methodology prs-v0.1 · computed · trigger: manual

Schedule

85 /100
85/100

Regulatory

50 /100
50/100

Infrastructure

50 /100
50/100

Capital

65 /100
65/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital capital commitment +50 Meta (investor) investor role committed $10,000,000,000 (coverage 100% of $10,000,000,000 capex).
Capital baseline 40 Meta El Paso Data Center Capital base before committed-capital evidence (announcement-only anchor region, §B.2.4).
Capital staleness decay -25 Meta El Paso Data Center Newest capital evidence is 2023-12-31 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Infrastructure baseline 70 Meta El Paso Data Center No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure staleness decay -20 Meta El Paso Data Center Newest infrastructure evidence is 2023-12-31 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 Meta El Paso Data Center No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Regulatory staleness decay -20 Meta El Paso Data Center Newest regulatory evidence is 2023-12-31 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Schedule baseline 80 Meta El Paso Data Center No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Groundbreaking Milestone "Groundbreaking" achieved on/ahead of its first announced date (2025-10-15).

Milestones

  1. Groundbreaking

    Achieved

    Groundbreaking · Actual:

  2. Energization

    Expected
    1 revision

    Energization · Expected:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Meta
Investor
100% $10.0B
Meta
Operator
Meta
Owner
El Paso Electric
Power Supplier
El Paso Electric
Utility Provider

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Meta · Oct 15, 2025 · backs: actual date

    https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/

  2. KVIA · Oct 15, 2025 · backs: capacity mw

    https://kvia.com/news/2025/10/15/meta-to-build-1-5-billion-data-center-in-northeast-el-paso/

  3. El Paso Matters · Mar 29, 2026 · backs: capex usd

    https://elpasomatters.org/2026/03/29/meta-data-center-el-paso-10-billion-expansion-water-gas-electricity-usage/

  4. CNBC · Mar 26, 2026 · backs: expected date

    https://www.cnbc.com/2026/03/26/meta-to-spend-10-billion-on-ai-data-center-in-el-paso-1gw-by-2028.html

  5. DCD · backs: announced date, status

    https://www.datacenterdynamics.com/en/news/meta-to-deploy-366mw-of-modular-gas-units-to-power-1gw-data-center-in-el-paso-texas/

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · El Paso Matters · relevance 0.85

  2. · CNBC · relevance 0.95

  3. · Texas Tribune · relevance 0.75

  4. · KVIA · relevance 0.95

  5. · Meta · relevance 0.85

  6. DCD · relevance 0.95