Jurisdiction: US — North Carolina (Duke Energy)
Maiden, Catawba County, North Carolina. Apple's iCloud data center; supported by ~244M kWh/yr renewable.
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | Apple Maiden Data Center | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | Apple Maiden Data Center | Newest capital evidence is 2018-04-09 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | baseline | 70 | Apple Maiden Data Center | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | Apple Maiden Data Center | Newest infrastructure evidence is 2018-04-09 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | Apple Maiden Data Center | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | staleness decay | -20 | Apple Maiden Data Center | Newest regulatory evidence is 2018-04-09 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Schedule | baseline | 80 | Apple Maiden Data Center | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | staleness decay | -25 | Apple Maiden Data Center | Newest schedule evidence is 2018-04-09 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
No milestones recorded for this project yet.
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Apple | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Apple Newsroom · Apr 9, 2018 · backs: status
https://www.apple.com/newsroom/2018/04/apple-now-globally-powered-by-100-percent-renewable-energy/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Apple Newsroom