Compute Institute
Ratings for the physical buildout of AI

Compute Institute — Ratings for AI infrastructure

Compute Institute publishes evidence-backed ratings for AI infrastructure: 39 jurisdictions ranked on the 0–100 Jurisdiction Competitiveness Index (JCI), 194 data-center projects scored for execution risk, and 117,627 MW of tracked capacity across 54,320 monitored source documents — every claim graded on the E1–E5 evidence ladder, 2,675 of them resting on primary (E1–E2) sources. Qatar leads the Jurisdiction Index at 77.4.

Index as of · How these scores are built

Jurisdictions rated
39
Projects scored
194
Tracked capacity
117,627 MW
Primary-evidence claims
2,675
Sources monitored
54,320

The Jurisdiction Index

Full index with evidence coverage →
Rank
Jurisdiction
JCI score
Δ vs prior run
Tier
Outlook
#1 Qatar 77.4 /100 unchanged
Tier 1 · Advantaged
Positive
#2 US — Iowa (MISO) 76.5 /100 unchanged
Tier 1 · Advantaged
Stable
#3 US — Indiana (MISO) 72.4 /100 unchanged
Tier 2 · Competitive
Positive
#4 US — Texas (ERCOT) 72.3 /100 unchanged
Tier 2 · Competitive
Stable
#5 United Arab Emirates 69.7 /100 unchanged
Tier 2 · Competitive
Positive
#6 US — Wisconsin (MISO) 68.5 /100 unchanged
Tier 2 · Competitive
Positive
#7 US — Arizona (APS/SRP) 67.2 /100 unchanged
Tier 2 · Competitive
Stable
#8 US — Georgia (Southern/Georgia Power) 67.2 /100 unchanged
Tier 2 · Competitive
Stable
#9 US — Tennessee (TVA federal power / MLGW & local distributors; non-RTO) 66 /100 unchanged
Tier 2 · Competitive
Positive
#10 Saudi Arabia 65.2 /100 unchanged
Tier 2 · Competitive
Stable
#11 US — Louisiana (Entergy Louisiana / SWEPCO / Cleco — MISO South, LRZ 9; regulator: Louisiana Public Service Commission) 63.5 /100 unchanged
Tier 2 · Competitive
Positive
#12 US — North Carolina (Duke Energy) 63.4 /100 unchanged
Tier 2 · Competitive
Positive
#13 US — Rest of US (composite) 63.4 /100 unchanged
Tier 2 · Competitive
Stable
#14 Sweden 63.1 /100 unchanged
Tier 2 · Competitive
Positive
#15 Canada 62.3 /100 unchanged
Tier 2 · Competitive
Stable
#16 France 62.3 /100 unchanged
Tier 2 · Competitive
Stable
#17 Australia 61.9 /100 unchanged
Tier 2 · Competitive
Negative
#18 US — Virginia (PJM/Dominion) 61.6 /100 unchanged
Tier 2 · Competitive
Stable
#19 US — Ohio (AEP Ohio / PJM) 61.2 /100 unchanged
Tier 2 · Competitive
Positive
#20 US — Pennsylvania (PJM) 60.4 /100 unchanged
Tier 2 · Competitive
Positive
#21 Denmark 60.2 /100 unchanged
Tier 2 · Competitive
Negative
#22 US — Minnesota (Xcel / MISO) 59.3 /100 unchanged
Tier 3 · Contested
Stable
#23 Singapore 59 /100 unchanged
Tier 3 · Contested
Stable
#24 Malaysia — Johor (Johor-Singapore SEZ) 58.9 /100 unchanged
Tier 3 · Contested
Positive
#25 Japan 58.6 /100 unchanged
Tier 3 · Contested
Stable
#26 United Kingdom 57 /100 unchanged
Tier 3 · Contested
Stable
#27 Germany 56.7 /100 unchanged
Tier 3 · Contested
Positive
#28 US — Nebraska (OPPD / NPPD / LES, 100% consumer-owned public power; SPP) 55.7 /100 unchanged
Tier 3 · Contested
Stable
#29 India 54.9 /100 unchanged
Tier 3 · Contested
Stable
#30 Ireland 54.1 /100 unchanged
Tier 3 · Contested
Positive
#31 Indonesia 53.6 /100 unchanged
Tier 3 · Contested
Stable
#32 South Africa 52.3 /100 unchanged
Tier 3 · Contested
Negative
#33 Brazil 50.9 /100 unchanged
Tier 3 · Contested
Positive
#34 Argentina 50.7 /100 unchanged
Tier 3 · Contested
Positive
#35 Poland 50.7 /100 unchanged
Tier 3 · Contested
Positive
#36 Netherlands 50.3 /100 unchanged
Tier 3 · Contested
Negative
#37 South Korea 49 /100 unchanged
Tier 3 · Contested
Stable
#38 US — Utah (Rocky Mountain Power / PacifiCorp, WECC — non-RTO) 46.9 /100 unchanged
Tier 3 · Contested
Negative
#39 US — Maryland (BGE / Pepco / Delmarva Power / Potomac Edison — PJM) 35.3 /100 unchanged
Tier 4 · Constrained
Negative

Project risk movers

All projects →

Project Risk Score (PRS) change between each project's two latest scoring runs, 0–100 (higher is healthier).

Tracked capacity

Megawatts of tracked data-center capacity, from stored project records. 102 projects without a disclosed MW figure are excluded from the MW sums.

By status

Announced (17 projects)
36,082 MW
Planned (11 projects)
6,913 MW
Permitted (8 projects)
14,600 MW
Construction (35 projects)
46,091 MW
Energized (1 project)
2,000 MW
Commissioned (3 projects)
533 MW
Operating (14 projects)
6,108 MW
Stalled (2 projects)
4,700 MW
Cancelled (1 project)
600 MW