Jurisdiction: Japan
Sharp Sakai LCD plant site (~440,000 sqm, ~60% of the plant's land), Sakai City, Osaka — SoftBank's flagship AI DC: 150+MW initial power capacity, 400+MW future; ~¥100B site acquisition (Dec 2024); operations target slipped from 2025 to end-2026 per later reporting.
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | SoftBank Sakai AI Data Center (ex-Sharp LCD plant) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | SoftBank Sakai AI Data Center (ex-Sharp LCD plant) | Newest capital evidence is 2024-06-07 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | staleness decay | -20 | SoftBank Sakai AI Data Center (ex-Sharp LCD plant) | Newest regulatory evidence is 2024-06-07 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | baseline | 70 | SoftBank Sakai AI Data Center (ex-Sharp LCD plant) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | SoftBank Sakai AI Data Center (ex-Sharp LCD plant) | Newest infrastructure evidence is 2024-06-07 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | SoftBank Sakai AI Data Center (ex-Sharp LCD plant) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | SoftBank Sakai AI Data Center (ex-Sharp LCD plant) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2024-06-07). |
| Schedule | staleness decay | -25 | SoftBank Sakai AI Data Center (ex-Sharp LCD plant) | Newest schedule evidence is 2024-06-07 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Announcement · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| SoftBank | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
SoftBank Corp. · Jun 7, 2024 · backs: actual date, status
https://www.softbank.jp/en/corp/news/press/sbkk/2024/20240607_01/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· SoftBank Corp. · relevance 0.90