Locatie Tussenweg, Agriport A7, Middenmeer (Gemeente Hollands Kroon) — new ~50ha hyperscale campus (two buildings) immediately north of Google's existing ~20ha Middenmeer DC (Tussenweg 8, in use since 2020). Initiator: Green Box Computing B.V. (Google/Alphabet NL working company). Coords derived from the Tussenweg 8 anchor; new parcel sits just north.

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

60 /100
60/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

60 /100
60/100

Regulatory

76 /100
76/100

Infrastructure

70 /100
70/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Google Tussenweg / Green Box Computing (Hollands Kroon) No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Infrastructure baseline 70 Google Tussenweg / Green Box Computing (Hollands Kroon) No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Regulatory baseline 70 Google Tussenweg / Green Box Computing (Hollands Kroon) No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Regulatory permit granted +6 Eia Scoping Advice Permitting milestone "Eia Scoping Advice" achieved on 2026-02-19.
Schedule baseline 80 Google Tussenweg / Green Box Computing (Hollands Kroon) No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Eia Scoping Advice Milestone "Eia Scoping Advice" achieved on/ahead of its first announced date (2026-02-19).
Schedule staleness decay -25 Google Tussenweg / Green Box Computing (Hollands Kroon) Newest schedule evidence is 2026-02-19 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Eia Scoping Advice

    Achieved

    Eia scoping advice · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Google
Developer

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Commissie voor de milieueffectrapportage · Feb 19, 2026 · backs: actual date, status

    https://pas.commissiemer.nl/files/nl/4006/a4006rd.pdf

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Noordhollands Dagblad (full repost at stichting-jas.nl) · relevance 0.70

  2. · Commissie voor de milieueffectrapportage · relevance 0.75