Compute Institute
Ratings for the physical buildout of AI
CyrusOne New Albany COL-1

CyrusOne New Albany COL-1

Construction
Confirmed

Jurisdiction: US — Ohio (AEP Ohio / PJM)

12181 Jug St, New Albany / Johnstown (Licking County), Ohio; ~93.8-acre property. ~274,518 sq ft.

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

52.8 /100
52.8/100

Methodology prs-v0.1 · computed · trigger: manual

Schedule

65 /100
65/100

Regulatory

50 /100
50/100

Infrastructure

50 /100
50/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 CyrusOne New Albany COL-1 No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Infrastructure baseline 70 CyrusOne New Albany COL-1 No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure staleness decay -20 CyrusOne New Albany COL-1 Newest infrastructure evidence is 2025-09-18 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 CyrusOne New Albany COL-1 No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Regulatory staleness decay -20 CyrusOne New Albany COL-1 Newest regulatory evidence is 2025-09-18 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Schedule baseline 80 CyrusOne New Albany COL-1 No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2024-04-01).
Schedule milestone achieved +5 Groundbreaking Milestone "Groundbreaking" achieved on/ahead of its first announced date (2025-09-18).
Schedule staleness decay -25 CyrusOne New Albany COL-1 Newest schedule evidence is 2025-09-18 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Announcement

    Achieved

    Announcement · Actual:

  2. Groundbreaking

    Achieved

    Groundbreaking · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
CyrusOne
Owner
KKR
Investor
HITT Contracting
General Contractor
Ohio Tax Credit Authority
Government Partner

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Data Center Dynamics · Sep 18, 2025 · backs: actual date, status

    https://www.datacenterdynamics.com/en/news/cyrusone-breaks-ground-on-new-albany-ohio-data-center/

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Data Center Dynamics