CoreWeave Lancaster AI Data Center Campus

CoreWeave Lancaster AI Data Center Campus

Planned
Probable

Jurisdiction: US — Pennsylvania (PJM)

Lancaster, Pennsylvania — former LSC Communications printing plant properties (216 Greenfield Road / 1375 Harrisburg Pike area). CoreWeave tenant; Chirisa Technology Parks + Machine Investment Group co-developers; Turner Construction + Wohlsen Construction JV builds.

Capacity
100 MW basis: it load
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

47.5 /100
47.5/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

60 /100
60/100

Regulatory

50 /100
50/100

Infrastructure

50 /100
50/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 CoreWeave Lancaster AI Data Center Campus No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Regulatory staleness decay -20 CoreWeave Lancaster AI Data Center Campus Newest regulatory evidence is 2025-07-15 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Infrastructure baseline 70 CoreWeave Lancaster AI Data Center Campus No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure staleness decay -20 CoreWeave Lancaster AI Data Center Campus Newest infrastructure evidence is 2025-07-15 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 CoreWeave Lancaster AI Data Center Campus No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 CoreWeave Lancaster AI Data Center Campus No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2025-07-15).
Schedule staleness decay -25 CoreWeave Lancaster AI Data Center Campus Newest schedule evidence is 2025-07-15 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Announcement

    Achieved

    Announcement · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Blue Owl Capital
Investor
Turner Construction
General Contractor
CoreWeave
Anchor Tenant
Chirisa Technology Parks
Developer
Machine Investment Group
Developer
Wohlsen Construction
General Contractor
PPL Electric Utilities
Utility Provider

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. CoreWeave Investor Relations · Jul 15, 2025 · backs: actual date, capacity mw, status

    https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · PRNewswire

  2. · Construction Dive

  3. · CoreWeave Investor Relations