Compute Institute
Ratings for the physical buildout of AI

AI Data Center Projects

156 tracked projects representing 115,101 MW of announced or built capacity across 23 jurisdictions. 156 carry a current 0–100 delivery health score (higher is healthier), scored across schedule, regulatory, infrastructure, and capital risk — every factor cites its source.

Status Jurisdiction Health score

156 projects

Owners & operators
xAI Colossus 2 (Memphis) US — Rest of US (composite) xAI 1,000 facility total
Operating
82/100
Stargate Wisconsin - Vantage Lighthouse (Port Washington) US — Rest of US (composite) Vantage Data Centers, Oracle, OpenAI 902 it load
Construction
82/100
AWS Louisa County Campuses (Lake Anna Tech Campus) US — Virginia (PJM/Dominion) Amazon Web Services
Construction
80.3/100
Meta Hyperion (Richland Parish) US — Rest of US (composite) Meta 2,000 it load
Construction
80.3/100
Fermi America Project Matador HyperGrid US — Texas (ERCOT) Fermi America (Fermi Inc.) 11,000 unspecified
Construction
80/100
Sweetwater 1 and 2 (IREN) US — Texas (ERCOT) IREN Limited 2,000 grid connection
Energized
78.6/100
Google Haskell County Data Centers US — Texas (ERCOT) Google
Construction
77/100
AWS Project Rainier (New Carlisle) US — Rest of US (composite) Amazon Web Services 2,200 facility total
Operating
77/100
AWS Georgia Data Center Campuses (Butts & Douglas Counties) US — Georgia (Southern/Georgia Power) Amazon Web Services
Planned
76/100
Stargate Abilene (Crusoe campus) US — Texas (ERCOT) Crusoe 1,200 facility total
Operating
75.8/100
Khazna AUH8 Masdar City AI Data Center United Arab Emirates Khazna Data Centers 30 unspecified
Construction
75.3/100
Meta Stanton Springs / Newton Data Center US — Georgia (Southern/Georgia Power) Meta
Operating
74/100
Microsoft Fairwater (Mount Pleasant) US — Rest of US (composite) Microsoft
Energized
73.3/100
DC BLOX Henrico (Wilkinson Road) US — Virginia (PJM/Dominion) DC BLOX 10 it load
Construction
72.5/100
Stargate Milam County (OpenAI / SB Energy) US — Texas (ERCOT) OpenAI, SB Energy 1,200 unspecified
Construction
72/100
Homer City Energy Campus US — Rest of US (composite) Homer City Redevelopment, Kiewit Power Constructors 4,400 facility total
Construction
71.9/100
Google Chesterfield Data Center Campus (Project Peanut) US — Virginia (PJM/Dominion) Google
Permitting
71.5/100
Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) United Arab Emirates Khazna Data Centers, G42 200 unspecified
Planned
71.5/100
Vantage Data Centers Frontier (Shackelford County / Stargate) US — Texas (ERCOT) Vantage Data Centers 1,400 unspecified
Construction
69.5/100
Stargate Michigan - The Barn (Saline Township) US — Rest of US (composite) Related Digital, Oracle, OpenAI 1,000 it load
Construction
69.5/100
QTS Atlanta Metro DC1 US — Georgia (Southern/Georgia Power) QTS Data Centers
Operating
69.5/100
Stack Infrastructure NVA02 (Manassas) US — Virginia (PJM/Dominion) STACK Infrastructure 420 it load
Operating
69.5/100
QTS Ashburn 1 (ASH1) US — Virginia (PJM/Dominion) QTS Data Centers 55 it load
Operating
69.5/100
Iron Mountain VA-1 (Manassas) US — Virginia (PJM/Dominion) Iron Mountain
Operating
69.5/100
NEXTDC M3 (West Footscray, Melbourne) Australia NEXTDC
Operating
69.5/100
du-Microsoft Hyperscale Data Center (Dubai) United Arab Emirates du (Emirates Integrated Telecommunications Company)
Planned
69/100
ARSAT Benavidez Data Center Hall IV Expansion Argentina ARSAT (Empresa Argentina de Soluciones Satelitales) 1 it load
Planned
69/100
Shippingport / Bruce Mansfield Data Center (Project Phoenix) US — Pennsylvania (PJM) Aligned Data Centers, The Frontier Group of Companies 3,600 grid connection
Permitted
68.7/100
AWS Susquehanna Nuclear Data Center Campus US — Rest of US (composite) Amazon Web Services 1,920 facility total
Construction
68.3/100
SoftBank France AI Data Center Program (Hauts-de-France) France SoftBank Group, Schneider Electric, SB Energy 5,000 grid connection
Announced
68/100
Khazna QAJ1 Ajman AI Data Center United Arab Emirates Khazna Data Centers 100 unspecified
Construction
67.8/100
Meta Lebanon Data Center Campus (LEAP District) US — Indiana (MISO) Meta 1,000 facility total
Construction
67.8/100
Aligned Project Caprock (Hale County) US — Texas (ERCOT) Aligned Data Centers 540 unspecified
Construction
67.8/100
Google Project Pegasus (LaGrange) US — Georgia (Southern/Georgia Power) Google
Construction
67.8/100
Meta El Paso Data Center US — Texas (ERCOT) Meta 100 unspecified
Construction
66/100
SB Energy AI Campus (Pike County, Ohio) US — Rest of US (composite) 10,000 unspecified
Construction
66/100
Vantage Data Centers AZ1 (Goodyear) US — Arizona (APS/SRP) Vantage Data Centers 176 it load
Construction
66/100
Compass Datacenters Goodyear US — Arizona (APS/SRP) Compass Datacenters 212 facility total
Construction
66/100
DataBank Red Oak Campus (South Dallas) US — Texas (ERCOT) DataBank 480 it load
Construction
66/100
Skybox / Prologis PowerCampus Austin (Hutto) US — Texas (ERCOT) Skybox Datacenters, Prologis
Construction
66/100
Project Comal US — Texas (ERCOT) KDC 360 unspecified
Permitted
65.9/100
Robena Mine Data Center (Project Hummingbird) US — Pennsylvania (PJM) International Electric Power (IEP), Project Hummingbird LLC 910 grid connection
Planned
64.9/100
Metrobloks IND-A1 (Indianapolis) US — Indiana (MISO) Metrobloks 72 it load
Permitted
64.9/100
Microsoft Fairwater Atlanta US — Georgia (Southern/Georgia Power) Microsoft
Operating
64/100
GW Ranch (Pacifico Energy) US — Texas (ERCOT) Pacifico Energy 5,000 facility total
Permitted
64/100
Google Council Bluffs Data Center US — Iowa (MISO) Google
Operating
63.5/100
Comanche Circle US — Rest of US (composite) 5,000 unspecified
Permitted
63/100
Prologis Shelbyville Data Center Campus US — Indiana (MISO) Prologis Inc.
Planned
63/100
CyrusOne Project Peach (Coweta County) US — Georgia (Southern/Georgia Power) CyrusOne
Permitted
63/100
Prologis Project Sail (Coweta County) US — Georgia (Southern/Georgia Power) Prologis, Atlas Development
Permitted
63/100
QTS White Oak Expansion (RIC4/RIC5, Henrico) US — Virginia (PJM/Dominion) QTS
Permitted
63/100
Cirion BUE1 Buenos Aires Expansion Argentina Cirion Technologies 9 unspecified
Operating
62.5/100
Stack Infrastructure Berry Hill Megasite (Pittsylvania) US — Virginia (PJM/Dominion) STACK Infrastructure
Planned
62.5/100
Google Tussenweg / Green Box Computing (Hollands Kroon) Netherlands Google
Announced
62.5/100
Meta Henrico Data Center (White Oak Technology Park) US — Virginia (PJM/Dominion) Meta Platforms (Facebook)
Operating
62/100
Vantage Data Centers Ashburn I (VA1) US — Virginia (PJM/Dominion) Vantage Data Centers 206 it load
Operating
61.5/100
Switch The Keep Campus (Douglas County) US — Georgia (Southern/Georgia Power) Switch
Operating
61.5/100
Crusoe / Blue Energy Data Center (Victoria, TX) US — Texas (ERCOT) Crusoe 1,500 grid connection
Announced
61/100
T5 @ Charlotte II (Kings Mountain) US — North Carolina (Duke Energy) T5 Data Centers 60 it load
Planned
61/100
DC BLOX Atlanta East (Rockdale County) US — Georgia (Southern/Georgia Power) DC BLOX
Construction
60.8/100
Stratos Project US — Rest of US (composite) 9,000 unspecified
Announced
60.5/100
Wheatfield data center and gas plant US — Rest of US (composite) 2,000 unspecified
Announced
60.5/100
Microsoft Pecos data center campus US — Rest of US (composite) 2,000 unspecified
Announced
60.5/100
Crusoe Callaway County Missouri data center US — Rest of US (composite) 1,800 unspecified
Announced
60.5/100
Joliet data center campus US — Rest of US (composite) 1,800 unspecified
Announced
60.5/100
Yorkville data center campus US — Rest of US (composite) 1,800 unspecified
Announced
60.5/100
T5 @ Atlanta IV (Palmetto) US — Georgia (Southern/Georgia Power) T5 Data Centers 200 facility total
Planned
60.5/100
QTS Salem Township Campus US — Pennsylvania (PJM) QTS Data Centers
Planned
60.5/100
Meta (Facebook) Forest City Data Center US — North Carolina (Duke Energy) Meta (Facebook)
Operating
60/100
Google Goodnight Campus (Armstrong County, TX) US — Texas (ERCOT) Google, Crusoe Energy
Construction
59.6/100
Google Douglas County Data Center US — Georgia (Southern/Georgia Power) Google
Operating
59.5/100
Google Lenoir Data Center US — North Carolina (Duke Energy) Google
Operating
59.5/100
CloudBurst Data Center (New Braunfels) US — Texas (ERCOT) CloudBurst Data Centers 1,200 unspecified
Construction
59/100
Google Fort Wayne Data Center US — Indiana (MISO) Google
Construction
59/100
Rowan Project Temple (Bell County) US — Texas (ERCOT) Rowan Digital Infrastructure
Construction
59/100
Google / Intersect Meitner Energy Center (Texas Panhandle) US — Texas (ERCOT) Google, Intersect Power
Construction
59/100
Microsoft Palmetto Data Center US — Georgia (Southern/Georgia Power) Microsoft
Construction
59/100
Amazon / AWS Salem Township Data Center Campus (Susquehanna) US — Pennsylvania (PJM) Amazon Web Services, Amazon 960 facility total
Construction
59/100
Amazon / AWS Falls Township Data Center (Keystone Trade Center) US — Pennsylvania (PJM) Amazon, NorthPoint Development
Construction
59/100
Nexus Data Center (Hubbard) US — Texas (ERCOT) Nexus Data Centers 612 unspecified
Announced
58.5/100
NEXTDC S7 Eastern Creek (OpenAI Stargate Australia) Australia NEXTDC
Announced
58.5/100
EdgeCore Mesa (Greater Phoenix) US — Arizona (APS/SRP) EdgeCore Digital Infrastructure 496 it load
Construction
58.3/100
Microsoft West Des Moines Data Centers US — Iowa (MISO) Microsoft
Operating
58/100
Edged Atlanta ATL01 Campus (Tilford Yard) US — Georgia (Southern/Georgia Power) Edged 168 it load
Operating
58/100
Amazon Devlin Technology Park (Bristow) US — Virginia (PJM/Dominion) Amazon Data Services
Planned
58/100
NEXTDC S3 (Sydney) Australia NEXTDC 80 unspecified
Operating
58/100
CDC Marsden Park Campus (Sydney) + 555MW US Hyperscaler Contract Australia CDC Data Centres
Permitted
58/100
Digital Edge SEL2 (Incheon) South Korea Digital Edge, SK Ecoplant 36 unspecified
Operating
58/100
Empyrion KR1 Gangnam (Seoul) South Korea Empyrion Digital
Operating
58/100
Google Hanau Data Center Germany Google, GARBE.DC
Operating
57.5/100
Google Midlothian Campus - Building 5 (Sharka) US — Texas (ERCOT) Google
Construction
57.3/100
AirTrunk Osaka Campus (OSK1 + OSK2) Japan AirTrunk
Construction
57.3/100
Blackstone QTS Cambois Campus (Blyth) United Kingdom QTS
Construction
57.1/100
NTT Grove at Gainesville Campus (VA10-VA13) US — Virginia (PJM/Dominion) NTT Global Data Centers, Lerner Enterprises
Construction
56.5/100
Google Waltham Cross Data Centre United Kingdom Google
Operating
56.5/100
Microsoft Project Rita (Tyrone) US — Georgia (Southern/Georgia Power) Microsoft 96 unspecified
Permitted
56.2/100
QTS Fayetteville Campus (Project Excalibur) US — Georgia (Southern/Georgia Power) QTS
Construction
56/100
MSB Global Services Matrix Data Center Campus US — Texas (ERCOT) MSB Global Services, LLC 3,000 unspecified
Construction
55.3/100
Meta Jeffersonville Data Center US — Indiana (MISO) Meta
Construction
55.3/100
AWS Hilliard Third Campus (Scioto Darby Road) US — Ohio (AEP Ohio / PJM) Amazon Web Services
Permitted
55.1/100
Google Mesa Data Center US — Arizona (APS/SRP) Google
Construction
55/100
Meta Altoona Data Center US — Iowa (MISO) Meta
Construction
55/100
Meta Temple Data Center US — Texas (ERCOT) Meta 152 unspecified
Commissioned
55/100
AWS New Albany Data Center Campus US — Ohio (AEP Ohio / PJM) Amazon Web Services
Operating
54.5/100
Meta Mesa Data Center US — Arizona (APS/SRP) Meta
Announced
54.5/100
Eneus Energy Cameron County data center US — Texas (ERCOT) Eneus Energy, RGV Property Group 2,000 unspecified
Announced
54.3/100
Microsoft Boydton Campus US — Virginia (PJM/Dominion) Microsoft
Operating
54/100
Crusoe / Lancium Abilene AI Campus (Stargate) US — Texas (ERCOT) Crusoe
Construction
54/100
NTT VA6 (Ashburn) US — Virginia (PJM/Dominion) NTT Ltd. 24 it load
Operating
54/100
Meta Prometheus (New Albany) US — Rest of US (composite) Meta 1,000 it load
Construction
53.8/100
Bridge Data Centres MY07 (Ulu Tiram) Malaysia — Johor (Johor-Singapore SEZ) Bridge Data Centres
Construction
53.6/100
Vantage Data Centers OH1 (New Albany) US — Ohio (AEP Ohio / PJM) Vantage Data Centers 192 facility total
Construction
53.5/100
EdgeConneX New Albany Campus US — Ohio (AEP Ohio / PJM) EdgeConneX
Construction
53.5/100
Microsoft Mount Pleasant Data Center Campus US — Wisconsin (MISO) Microsoft
Construction
53.5/100
CyrusOne Whitney Campus (DFW10 series, Bosque County) US — Texas (ERCOT) CyrusOne
Construction
53.5/100
DataBank Lithia Springs Campus (ATL5/ATL6) US — Georgia (Southern/Georgia Power) DataBank 120 it load
Construction
53.5/100
PowerHouse 95 (Spotsylvania) US — Virginia (PJM/Dominion) PowerHouse Data Centers
Construction
53.5/100
Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico) US — Virginia (PJM/Dominion) Iron Mountain
Construction
53.5/100
Vantage Pittsboro Campus US — Indiana (MISO) Vantage Data Centers 400 facility total
Permitted
53.2/100
Stargate New Mexico - Project Jupiter (Dona Ana County) US — Rest of US (composite) BorderPlex Digital Assets, STACK Infrastructure 1,000 unspecified
Construction
52.8/100
CyrusOne New Albany COL-1 US — Ohio (AEP Ohio / PJM) CyrusOne
Construction
52.8/100
Apple Maiden Data Center US — North Carolina (Duke Energy) Apple
Operating
52/100
Aligned IAD-02 (Ashburn) US — Virginia (PJM/Dominion) Aligned Data Centers
Construction
51.8/100
Equinix SG6 (Singapore) Singapore Equinix 20 unspecified
Construction
51.8/100
Plan Nuclear Argentino - Nuclear-Powered AI Data Center Hub (Nuclear City) Argentina Government of Argentina (Consejo Nuclear Argentino), INVAP, Nucleoelectrica Argentina
Announced
51/100
Tract Caldwell County Technology Park US — Texas (ERCOT) Tract 2,000 facility total
Announced
51/100
AREP PowerHouse Grand Prairie US — Texas (ERCOT) PowerHouse Data Centers, American Real Estate Partners (AREP), Provident Data Centers 1,800 unspecified
Planned
51/100
Microsoft New Albany Data Centers US — Ohio (AEP Ohio / PJM) Microsoft
Planned
51/100
Cologix Johnstown AI-Ready Campus US — Ohio (AEP Ohio / PJM) Cologix 800 unspecified
Announced
51/100
Google New Albany Campus (Montauk Innovations) US — Ohio (AEP Ohio / PJM) Google, Montauk Innovations LLC
Announced
51/100
DC BLOX Atlanta West US — Georgia (Southern/Georgia Power) DC BLOX 120 it load
Construction
51/100
Novva Data Centers Mesa US — Arizona (APS/SRP) Novva Data Centers 300 facility total
Planned
51/100
Microsoft Granger Data Center (St. Joe Farms) US — Indiana (MISO) Microsoft
Planned
51/100
Rowan Cinco Data Center Campus (Medina County) US — Texas (ERCOT) Rowan Digital Infrastructure 300 unspecified
Construction
51/100
CoreWeave Lancaster AI Data Center Campus US — Pennsylvania (PJM) Chirisa Technology Parks, Machine Investment Group 100 it load
Planned
51/100
TECfusions Keystone Connect (Upper Burrell) US — Pennsylvania (PJM) TECfusions 3,000 unspecified
Planned
51/100
Pennsylvania Digital I (PAX) - Carlisle Hyperscale Campus US — Pennsylvania (PJM) Pennsylvania Data Center Partners, PowerHouse Data Centers 1,350 unspecified
Announced
51/100
Energy Capital Partners / Calpine York 2 Data Center US — Pennsylvania (PJM) Energy Capital Partners, Calpine Corporation
Announced
51/100
EdgeCore Culpeper Campus US — Virginia (PJM/Dominion) EdgeCore Digital Infrastructure
Announced
51/100
SK Group + AWS Ulsan AI Data Center South Korea SK Telecom
Construction
51/100
Microsoft Middenmeer Deelgebied B1 (AMS-E expansion) Netherlands Microsoft
Announced
51/100
Talen Energy - AWS Susquehanna PPA US — Rest of US (composite) 1,920 unspecified
Announced
50.5/100
DataBank Culpeper Campus (IAD5/IAD6) US — Virginia (PJM/Dominion) DataBank 192 it load
Planned
50.5/100
AirTrunk SYD3 (Western Sydney) Australia AirTrunk
Permitting
50.5/100
Telecom Argentina Edge AI Data Center Conversion Program Argentina Telecom Argentina
Announced
48.4/100
Crane Clean Energy Center US — Pennsylvania (PJM) Constellation Energy 1,000 grid connection
Announced
48.4/100
Stargate UAE (Abu Dhabi) United Arab Emirates G42, OpenAI, Oracle 1,000 unspecified
Announced
47.5/100
Stargate Argentina (Patagonia) Argentina Sur Energy 500 unspecified
Announced
47.5/100
Nscale AI Campus Loughton (Microsoft anchor / Stargate UK) United Kingdom Nscale
Announced
47.5/100
Microsoft Southeast Asia 3 Region (Johor Bahru) Malaysia — Johor (Johor-Singapore SEZ) Microsoft
Announced
47.5/100
AWS Desper Creek Technology Campus (Louisa County) US — Virginia (PJM/Dominion) Amazon Web Services
Permitting
47/100
Google Project Skyway (Pine Island, MN) US — Minnesota (Xcel / MISO) Google, Ryan Companies 2,700 grid connection
Stalled
35/100
Poolside Project Horizon US — Texas (ERCOT) Poolside, CoreWeave, Mitchell family (Longfellow Ranch) 2,000 unspecified
Stalled
35/100
Project Gravity (Archbald / Gouldsboro Data Center Campus) US — Pennsylvania (PJM) 1778 Rich Pike LLC
Stalled
35/100
Prince William Digital Gateway (QTS / Compass) US — Virginia (PJM/Dominion) QTS, Compass Datacenters
Cancelled
10/100
Project Aggie (College Station) US — Texas (ERCOT) Priority Power Management, LLC, PPM Data LLC, Brandon Schwertner 600 unspecified
Cancelled
10/100