xAI Colossus 2 (Memphis)
|
US — Rest of US (composite)
|
xAI
|
1,000
facility total
|
Operating
|
82/100
|
|
Stargate Wisconsin - Vantage Lighthouse (Port Washington)
|
US — Rest of US (composite)
|
Vantage Data Centers, Oracle, OpenAI
|
902
it load
|
Construction
|
82/100
|
|
AWS Louisa County Campuses (Lake Anna Tech Campus)
|
US — Virginia (PJM/Dominion)
|
Amazon Web Services
|
—
|
Construction
|
80.3/100
|
|
Meta Hyperion (Richland Parish)
|
US — Rest of US (composite)
|
Meta
|
2,000
it load
|
Construction
|
80.3/100
|
|
Fermi America Project Matador HyperGrid
|
US — Texas (ERCOT)
|
Fermi America (Fermi Inc.)
|
11,000
unspecified
|
Construction
|
80/100
|
|
Sweetwater 1 and 2 (IREN)
|
US — Texas (ERCOT)
|
IREN Limited
|
2,000
grid connection
|
Energized
|
78.6/100
|
|
Google Haskell County Data Centers
|
US — Texas (ERCOT)
|
Google
|
—
|
Construction
|
77/100
|
|
AWS Project Rainier (New Carlisle)
|
US — Rest of US (composite)
|
Amazon Web Services
|
2,200
facility total
|
Operating
|
77/100
|
|
AWS Georgia Data Center Campuses (Butts & Douglas Counties)
|
US — Georgia (Southern/Georgia Power)
|
Amazon Web Services
|
—
|
Planned
|
76/100
|
|
Stargate Abilene (Crusoe campus)
|
US — Texas (ERCOT)
|
Crusoe
|
1,200
facility total
|
Operating
|
75.8/100
|
|
Khazna AUH8 Masdar City AI Data Center
|
United Arab Emirates
|
Khazna Data Centers
|
30
unspecified
|
Construction
|
75.3/100
|
|
Meta Stanton Springs / Newton Data Center
|
US — Georgia (Southern/Georgia Power)
|
Meta
|
—
|
Operating
|
74/100
|
|
Microsoft Fairwater (Mount Pleasant)
|
US — Rest of US (composite)
|
Microsoft
|
—
|
Energized
|
73.3/100
|
|
DC BLOX Henrico (Wilkinson Road)
|
US — Virginia (PJM/Dominion)
|
DC BLOX
|
10
it load
|
Construction
|
72.5/100
|
|
Stargate Milam County (OpenAI / SB Energy)
|
US — Texas (ERCOT)
|
OpenAI, SB Energy
|
1,200
unspecified
|
Construction
|
72/100
|
|
Homer City Energy Campus
|
US — Rest of US (composite)
|
Homer City Redevelopment, Kiewit Power Constructors
|
4,400
facility total
|
Construction
|
71.9/100
|
|
Google Chesterfield Data Center Campus (Project Peanut)
|
US — Virginia (PJM/Dominion)
|
Google
|
—
|
Permitting
|
71.5/100
|
|
Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna)
|
United Arab Emirates
|
Khazna Data Centers, G42
|
200
unspecified
|
Planned
|
71.5/100
|
|
Vantage Data Centers Frontier (Shackelford County / Stargate)
|
US — Texas (ERCOT)
|
Vantage Data Centers
|
1,400
unspecified
|
Construction
|
69.5/100
|
|
Stargate Michigan - The Barn (Saline Township)
|
US — Rest of US (composite)
|
Related Digital, Oracle, OpenAI
|
1,000
it load
|
Construction
|
69.5/100
|
|
QTS Atlanta Metro DC1
|
US — Georgia (Southern/Georgia Power)
|
QTS Data Centers
|
—
|
Operating
|
69.5/100
|
|
Stack Infrastructure NVA02 (Manassas)
|
US — Virginia (PJM/Dominion)
|
STACK Infrastructure
|
420
it load
|
Operating
|
69.5/100
|
|
QTS Ashburn 1 (ASH1)
|
US — Virginia (PJM/Dominion)
|
QTS Data Centers
|
55
it load
|
Operating
|
69.5/100
|
|
Iron Mountain VA-1 (Manassas)
|
US — Virginia (PJM/Dominion)
|
Iron Mountain
|
—
|
Operating
|
69.5/100
|
|
NEXTDC M3 (West Footscray, Melbourne)
|
Australia
|
NEXTDC
|
—
|
Operating
|
69.5/100
|
|
du-Microsoft Hyperscale Data Center (Dubai)
|
United Arab Emirates
|
du (Emirates Integrated Telecommunications Company)
|
—
|
Planned
|
69/100
|
|
ARSAT Benavidez Data Center Hall IV Expansion
|
Argentina
|
ARSAT (Empresa Argentina de Soluciones Satelitales)
|
1
it load
|
Planned
|
69/100
|
|
Shippingport / Bruce Mansfield Data Center (Project Phoenix)
|
US — Pennsylvania (PJM)
|
Aligned Data Centers, The Frontier Group of Companies
|
3,600
grid connection
|
Permitted
|
68.7/100
|
|
AWS Susquehanna Nuclear Data Center Campus
|
US — Rest of US (composite)
|
Amazon Web Services
|
1,920
facility total
|
Construction
|
68.3/100
|
|
SoftBank France AI Data Center Program (Hauts-de-France)
|
France
|
SoftBank Group, Schneider Electric, SB Energy
|
5,000
grid connection
|
Announced
|
68/100
|
|
Khazna QAJ1 Ajman AI Data Center
|
United Arab Emirates
|
Khazna Data Centers
|
100
unspecified
|
Construction
|
67.8/100
|
|
Meta Lebanon Data Center Campus (LEAP District)
|
US — Indiana (MISO)
|
Meta
|
1,000
facility total
|
Construction
|
67.8/100
|
|
Aligned Project Caprock (Hale County)
|
US — Texas (ERCOT)
|
Aligned Data Centers
|
540
unspecified
|
Construction
|
67.8/100
|
|
Google Project Pegasus (LaGrange)
|
US — Georgia (Southern/Georgia Power)
|
Google
|
—
|
Construction
|
67.8/100
|
|
Meta El Paso Data Center
|
US — Texas (ERCOT)
|
Meta
|
100
unspecified
|
Construction
|
66/100
|
|
SB Energy AI Campus (Pike County, Ohio)
|
US — Rest of US (composite)
|
—
|
10,000
unspecified
|
Construction
|
66/100
|
|
Vantage Data Centers AZ1 (Goodyear)
|
US — Arizona (APS/SRP)
|
Vantage Data Centers
|
176
it load
|
Construction
|
66/100
|
|
Compass Datacenters Goodyear
|
US — Arizona (APS/SRP)
|
Compass Datacenters
|
212
facility total
|
Construction
|
66/100
|
|
DataBank Red Oak Campus (South Dallas)
|
US — Texas (ERCOT)
|
DataBank
|
480
it load
|
Construction
|
66/100
|
|
Skybox / Prologis PowerCampus Austin (Hutto)
|
US — Texas (ERCOT)
|
Skybox Datacenters, Prologis
|
—
|
Construction
|
66/100
|
|
Project Comal
|
US — Texas (ERCOT)
|
KDC
|
360
unspecified
|
Permitted
|
65.9/100
|
|
Robena Mine Data Center (Project Hummingbird)
|
US — Pennsylvania (PJM)
|
International Electric Power (IEP), Project Hummingbird LLC
|
910
grid connection
|
Planned
|
64.9/100
|
|
Metrobloks IND-A1 (Indianapolis)
|
US — Indiana (MISO)
|
Metrobloks
|
72
it load
|
Permitted
|
64.9/100
|
|
Microsoft Fairwater Atlanta
|
US — Georgia (Southern/Georgia Power)
|
Microsoft
|
—
|
Operating
|
64/100
|
|
GW Ranch (Pacifico Energy)
|
US — Texas (ERCOT)
|
Pacifico Energy
|
5,000
facility total
|
Permitted
|
64/100
|
|
Google Council Bluffs Data Center
|
US — Iowa (MISO)
|
Google
|
—
|
Operating
|
63.5/100
|
|
Comanche Circle
|
US — Rest of US (composite)
|
—
|
5,000
unspecified
|
Permitted
|
63/100
|
|
Prologis Shelbyville Data Center Campus
|
US — Indiana (MISO)
|
Prologis Inc.
|
—
|
Planned
|
63/100
|
|
CyrusOne Project Peach (Coweta County)
|
US — Georgia (Southern/Georgia Power)
|
CyrusOne
|
—
|
Permitted
|
63/100
|
|
Prologis Project Sail (Coweta County)
|
US — Georgia (Southern/Georgia Power)
|
Prologis, Atlas Development
|
—
|
Permitted
|
63/100
|
|
QTS White Oak Expansion (RIC4/RIC5, Henrico)
|
US — Virginia (PJM/Dominion)
|
QTS
|
—
|
Permitted
|
63/100
|
|
Cirion BUE1 Buenos Aires Expansion
|
Argentina
|
Cirion Technologies
|
9
unspecified
|
Operating
|
62.5/100
|
|
Stack Infrastructure Berry Hill Megasite (Pittsylvania)
|
US — Virginia (PJM/Dominion)
|
STACK Infrastructure
|
—
|
Planned
|
62.5/100
|
|
Google Tussenweg / Green Box Computing (Hollands Kroon)
|
Netherlands
|
Google
|
—
|
Announced
|
62.5/100
|
|
Meta Henrico Data Center (White Oak Technology Park)
|
US — Virginia (PJM/Dominion)
|
Meta Platforms (Facebook)
|
—
|
Operating
|
62/100
|
|
Vantage Data Centers Ashburn I (VA1)
|
US — Virginia (PJM/Dominion)
|
Vantage Data Centers
|
206
it load
|
Operating
|
61.5/100
|
|
Switch The Keep Campus (Douglas County)
|
US — Georgia (Southern/Georgia Power)
|
Switch
|
—
|
Operating
|
61.5/100
|
|
Crusoe / Blue Energy Data Center (Victoria, TX)
|
US — Texas (ERCOT)
|
Crusoe
|
1,500
grid connection
|
Announced
|
61/100
|
|
T5 @ Charlotte II (Kings Mountain)
|
US — North Carolina (Duke Energy)
|
T5 Data Centers
|
60
it load
|
Planned
|
61/100
|
|
DC BLOX Atlanta East (Rockdale County)
|
US — Georgia (Southern/Georgia Power)
|
DC BLOX
|
—
|
Construction
|
60.8/100
|
|
Stratos Project
|
US — Rest of US (composite)
|
—
|
9,000
unspecified
|
Announced
|
60.5/100
|
|
Wheatfield data center and gas plant
|
US — Rest of US (composite)
|
—
|
2,000
unspecified
|
Announced
|
60.5/100
|
|
Microsoft Pecos data center campus
|
US — Rest of US (composite)
|
—
|
2,000
unspecified
|
Announced
|
60.5/100
|
|
Crusoe Callaway County Missouri data center
|
US — Rest of US (composite)
|
—
|
1,800
unspecified
|
Announced
|
60.5/100
|
|
Joliet data center campus
|
US — Rest of US (composite)
|
—
|
1,800
unspecified
|
Announced
|
60.5/100
|
|
Yorkville data center campus
|
US — Rest of US (composite)
|
—
|
1,800
unspecified
|
Announced
|
60.5/100
|
|
T5 @ Atlanta IV (Palmetto)
|
US — Georgia (Southern/Georgia Power)
|
T5 Data Centers
|
200
facility total
|
Planned
|
60.5/100
|
|
QTS Salem Township Campus
|
US — Pennsylvania (PJM)
|
QTS Data Centers
|
—
|
Planned
|
60.5/100
|
|
Meta (Facebook) Forest City Data Center
|
US — North Carolina (Duke Energy)
|
Meta (Facebook)
|
—
|
Operating
|
60/100
|
|
Google Goodnight Campus (Armstrong County, TX)
|
US — Texas (ERCOT)
|
Google, Crusoe Energy
|
—
|
Construction
|
59.6/100
|
|
Google Douglas County Data Center
|
US — Georgia (Southern/Georgia Power)
|
Google
|
—
|
Operating
|
59.5/100
|
|
Google Lenoir Data Center
|
US — North Carolina (Duke Energy)
|
Google
|
—
|
Operating
|
59.5/100
|
|
CloudBurst Data Center (New Braunfels)
|
US — Texas (ERCOT)
|
CloudBurst Data Centers
|
1,200
unspecified
|
Construction
|
59/100
|
|
Google Fort Wayne Data Center
|
US — Indiana (MISO)
|
Google
|
—
|
Construction
|
59/100
|
|
Rowan Project Temple (Bell County)
|
US — Texas (ERCOT)
|
Rowan Digital Infrastructure
|
—
|
Construction
|
59/100
|
|
Google / Intersect Meitner Energy Center (Texas Panhandle)
|
US — Texas (ERCOT)
|
Google, Intersect Power
|
—
|
Construction
|
59/100
|
|
Microsoft Palmetto Data Center
|
US — Georgia (Southern/Georgia Power)
|
Microsoft
|
—
|
Construction
|
59/100
|
|
Amazon / AWS Salem Township Data Center Campus (Susquehanna)
|
US — Pennsylvania (PJM)
|
Amazon Web Services, Amazon
|
960
facility total
|
Construction
|
59/100
|
|
Amazon / AWS Falls Township Data Center (Keystone Trade Center)
|
US — Pennsylvania (PJM)
|
Amazon, NorthPoint Development
|
—
|
Construction
|
59/100
|
|
Nexus Data Center (Hubbard)
|
US — Texas (ERCOT)
|
Nexus Data Centers
|
612
unspecified
|
Announced
|
58.5/100
|
|
NEXTDC S7 Eastern Creek (OpenAI Stargate Australia)
|
Australia
|
NEXTDC
|
—
|
Announced
|
58.5/100
|
|
EdgeCore Mesa (Greater Phoenix)
|
US — Arizona (APS/SRP)
|
EdgeCore Digital Infrastructure
|
496
it load
|
Construction
|
58.3/100
|
|
Microsoft West Des Moines Data Centers
|
US — Iowa (MISO)
|
Microsoft
|
—
|
Operating
|
58/100
|
|
Edged Atlanta ATL01 Campus (Tilford Yard)
|
US — Georgia (Southern/Georgia Power)
|
Edged
|
168
it load
|
Operating
|
58/100
|
|
Amazon Devlin Technology Park (Bristow)
|
US — Virginia (PJM/Dominion)
|
Amazon Data Services
|
—
|
Planned
|
58/100
|
|
NEXTDC S3 (Sydney)
|
Australia
|
NEXTDC
|
80
unspecified
|
Operating
|
58/100
|
|
CDC Marsden Park Campus (Sydney) + 555MW US Hyperscaler Contract
|
Australia
|
CDC Data Centres
|
—
|
Permitted
|
58/100
|
|
Digital Edge SEL2 (Incheon)
|
South Korea
|
Digital Edge, SK Ecoplant
|
36
unspecified
|
Operating
|
58/100
|
|
Empyrion KR1 Gangnam (Seoul)
|
South Korea
|
Empyrion Digital
|
—
|
Operating
|
58/100
|
|
Google Hanau Data Center
|
Germany
|
Google, GARBE.DC
|
—
|
Operating
|
57.5/100
|
|
Google Midlothian Campus - Building 5 (Sharka)
|
US — Texas (ERCOT)
|
Google
|
—
|
Construction
|
57.3/100
|
|
AirTrunk Osaka Campus (OSK1 + OSK2)
|
Japan
|
AirTrunk
|
—
|
Construction
|
57.3/100
|
|
Blackstone QTS Cambois Campus (Blyth)
|
United Kingdom
|
QTS
|
—
|
Construction
|
57.1/100
|
|
NTT Grove at Gainesville Campus (VA10-VA13)
|
US — Virginia (PJM/Dominion)
|
NTT Global Data Centers, Lerner Enterprises
|
—
|
Construction
|
56.5/100
|
|
Google Waltham Cross Data Centre
|
United Kingdom
|
Google
|
—
|
Operating
|
56.5/100
|
|
Microsoft Project Rita (Tyrone)
|
US — Georgia (Southern/Georgia Power)
|
Microsoft
|
96
unspecified
|
Permitted
|
56.2/100
|
|
QTS Fayetteville Campus (Project Excalibur)
|
US — Georgia (Southern/Georgia Power)
|
QTS
|
—
|
Construction
|
56/100
|
|
MSB Global Services Matrix Data Center Campus
|
US — Texas (ERCOT)
|
MSB Global Services, LLC
|
3,000
unspecified
|
Construction
|
55.3/100
|
|
Meta Jeffersonville Data Center
|
US — Indiana (MISO)
|
Meta
|
—
|
Construction
|
55.3/100
|
|
AWS Hilliard Third Campus (Scioto Darby Road)
|
US — Ohio (AEP Ohio / PJM)
|
Amazon Web Services
|
—
|
Permitted
|
55.1/100
|
|
Google Mesa Data Center
|
US — Arizona (APS/SRP)
|
Google
|
—
|
Construction
|
55/100
|
|
Meta Altoona Data Center
|
US — Iowa (MISO)
|
Meta
|
—
|
Construction
|
55/100
|
|
Meta Temple Data Center
|
US — Texas (ERCOT)
|
Meta
|
152
unspecified
|
Commissioned
|
55/100
|
|
AWS New Albany Data Center Campus
|
US — Ohio (AEP Ohio / PJM)
|
Amazon Web Services
|
—
|
Operating
|
54.5/100
|
|
Meta Mesa Data Center
|
US — Arizona (APS/SRP)
|
Meta
|
—
|
Announced
|
54.5/100
|
|
Eneus Energy Cameron County data center
|
US — Texas (ERCOT)
|
Eneus Energy, RGV Property Group
|
2,000
unspecified
|
Announced
|
54.3/100
|
|
Microsoft Boydton Campus
|
US — Virginia (PJM/Dominion)
|
Microsoft
|
—
|
Operating
|
54/100
|
|
Crusoe / Lancium Abilene AI Campus (Stargate)
|
US — Texas (ERCOT)
|
Crusoe
|
—
|
Construction
|
54/100
|
|
NTT VA6 (Ashburn)
|
US — Virginia (PJM/Dominion)
|
NTT Ltd.
|
24
it load
|
Operating
|
54/100
|
|
Meta Prometheus (New Albany)
|
US — Rest of US (composite)
|
Meta
|
1,000
it load
|
Construction
|
53.8/100
|
|
Bridge Data Centres MY07 (Ulu Tiram)
|
Malaysia — Johor (Johor-Singapore SEZ)
|
Bridge Data Centres
|
—
|
Construction
|
53.6/100
|
|
Vantage Data Centers OH1 (New Albany)
|
US — Ohio (AEP Ohio / PJM)
|
Vantage Data Centers
|
192
facility total
|
Construction
|
53.5/100
|
|
EdgeConneX New Albany Campus
|
US — Ohio (AEP Ohio / PJM)
|
EdgeConneX
|
—
|
Construction
|
53.5/100
|
|
Microsoft Mount Pleasant Data Center Campus
|
US — Wisconsin (MISO)
|
Microsoft
|
—
|
Construction
|
53.5/100
|
|
CyrusOne Whitney Campus (DFW10 series, Bosque County)
|
US — Texas (ERCOT)
|
CyrusOne
|
—
|
Construction
|
53.5/100
|
|
DataBank Lithia Springs Campus (ATL5/ATL6)
|
US — Georgia (Southern/Georgia Power)
|
DataBank
|
120
it load
|
Construction
|
53.5/100
|
|
PowerHouse 95 (Spotsylvania)
|
US — Virginia (PJM/Dominion)
|
PowerHouse Data Centers
|
—
|
Construction
|
53.5/100
|
|
Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico)
|
US — Virginia (PJM/Dominion)
|
Iron Mountain
|
—
|
Construction
|
53.5/100
|
|
Vantage Pittsboro Campus
|
US — Indiana (MISO)
|
Vantage Data Centers
|
400
facility total
|
Permitted
|
53.2/100
|
|
Stargate New Mexico - Project Jupiter (Dona Ana County)
|
US — Rest of US (composite)
|
BorderPlex Digital Assets, STACK Infrastructure
|
1,000
unspecified
|
Construction
|
52.8/100
|
|
CyrusOne New Albany COL-1
|
US — Ohio (AEP Ohio / PJM)
|
CyrusOne
|
—
|
Construction
|
52.8/100
|
|
Apple Maiden Data Center
|
US — North Carolina (Duke Energy)
|
Apple
|
—
|
Operating
|
52/100
|
|
Aligned IAD-02 (Ashburn)
|
US — Virginia (PJM/Dominion)
|
Aligned Data Centers
|
—
|
Construction
|
51.8/100
|
|
Equinix SG6 (Singapore)
|
Singapore
|
Equinix
|
20
unspecified
|
Construction
|
51.8/100
|
|
Plan Nuclear Argentino - Nuclear-Powered AI Data Center Hub (Nuclear City)
|
Argentina
|
Government of Argentina (Consejo Nuclear Argentino), INVAP, Nucleoelectrica Argentina
|
—
|
Announced
|
51/100
|
|
Tract Caldwell County Technology Park
|
US — Texas (ERCOT)
|
Tract
|
2,000
facility total
|
Announced
|
51/100
|
|
AREP PowerHouse Grand Prairie
|
US — Texas (ERCOT)
|
PowerHouse Data Centers, American Real Estate Partners (AREP), Provident Data Centers
|
1,800
unspecified
|
Planned
|
51/100
|
|
Microsoft New Albany Data Centers
|
US — Ohio (AEP Ohio / PJM)
|
Microsoft
|
—
|
Planned
|
51/100
|
|
Cologix Johnstown AI-Ready Campus
|
US — Ohio (AEP Ohio / PJM)
|
Cologix
|
800
unspecified
|
Announced
|
51/100
|
|
Google New Albany Campus (Montauk Innovations)
|
US — Ohio (AEP Ohio / PJM)
|
Google, Montauk Innovations LLC
|
—
|
Announced
|
51/100
|
|
DC BLOX Atlanta West
|
US — Georgia (Southern/Georgia Power)
|
DC BLOX
|
120
it load
|
Construction
|
51/100
|
|
Novva Data Centers Mesa
|
US — Arizona (APS/SRP)
|
Novva Data Centers
|
300
facility total
|
Planned
|
51/100
|
|
Microsoft Granger Data Center (St. Joe Farms)
|
US — Indiana (MISO)
|
Microsoft
|
—
|
Planned
|
51/100
|
|
Rowan Cinco Data Center Campus (Medina County)
|
US — Texas (ERCOT)
|
Rowan Digital Infrastructure
|
300
unspecified
|
Construction
|
51/100
|
|
CoreWeave Lancaster AI Data Center Campus
|
US — Pennsylvania (PJM)
|
Chirisa Technology Parks, Machine Investment Group
|
100
it load
|
Planned
|
51/100
|
|
TECfusions Keystone Connect (Upper Burrell)
|
US — Pennsylvania (PJM)
|
TECfusions
|
3,000
unspecified
|
Planned
|
51/100
|
|
Pennsylvania Digital I (PAX) - Carlisle Hyperscale Campus
|
US — Pennsylvania (PJM)
|
Pennsylvania Data Center Partners, PowerHouse Data Centers
|
1,350
unspecified
|
Announced
|
51/100
|
|
Energy Capital Partners / Calpine York 2 Data Center
|
US — Pennsylvania (PJM)
|
Energy Capital Partners, Calpine Corporation
|
—
|
Announced
|
51/100
|
|
EdgeCore Culpeper Campus
|
US — Virginia (PJM/Dominion)
|
EdgeCore Digital Infrastructure
|
—
|
Announced
|
51/100
|
|
SK Group + AWS Ulsan AI Data Center
|
South Korea
|
SK Telecom
|
—
|
Construction
|
51/100
|
|
Microsoft Middenmeer Deelgebied B1 (AMS-E expansion)
|
Netherlands
|
Microsoft
|
—
|
Announced
|
51/100
|
|
Talen Energy - AWS Susquehanna PPA
|
US — Rest of US (composite)
|
—
|
1,920
unspecified
|
Announced
|
50.5/100
|
|
DataBank Culpeper Campus (IAD5/IAD6)
|
US — Virginia (PJM/Dominion)
|
DataBank
|
192
it load
|
Planned
|
50.5/100
|
|
AirTrunk SYD3 (Western Sydney)
|
Australia
|
AirTrunk
|
—
|
Permitting
|
50.5/100
|
|
Telecom Argentina Edge AI Data Center Conversion Program
|
Argentina
|
Telecom Argentina
|
—
|
Announced
|
48.4/100
|
|
Crane Clean Energy Center
|
US — Pennsylvania (PJM)
|
Constellation Energy
|
1,000
grid connection
|
Announced
|
48.4/100
|
|
Stargate UAE (Abu Dhabi)
|
United Arab Emirates
|
G42, OpenAI, Oracle
|
1,000
unspecified
|
Announced
|
47.5/100
|
|
Stargate Argentina (Patagonia)
|
Argentina
|
Sur Energy
|
500
unspecified
|
Announced
|
47.5/100
|
|
Nscale AI Campus Loughton (Microsoft anchor / Stargate UK)
|
United Kingdom
|
Nscale
|
—
|
Announced
|
47.5/100
|
|
Microsoft Southeast Asia 3 Region (Johor Bahru)
|
Malaysia — Johor (Johor-Singapore SEZ)
|
Microsoft
|
—
|
Announced
|
47.5/100
|
|
AWS Desper Creek Technology Campus (Louisa County)
|
US — Virginia (PJM/Dominion)
|
Amazon Web Services
|
—
|
Permitting
|
47/100
|
|
Google Project Skyway (Pine Island, MN)
|
US — Minnesota (Xcel / MISO)
|
Google, Ryan Companies
|
2,700
grid connection
|
Stalled
|
35/100
|
|
Poolside Project Horizon
|
US — Texas (ERCOT)
|
Poolside, CoreWeave, Mitchell family (Longfellow Ranch)
|
2,000
unspecified
|
Stalled
|
35/100
|
|
Project Gravity (Archbald / Gouldsboro Data Center Campus)
|
US — Pennsylvania (PJM)
|
1778 Rich Pike LLC
|
—
|
Stalled
|
35/100
|
|
Prince William Digital Gateway (QTS / Compass)
|
US — Virginia (PJM/Dominion)
|
QTS, Compass Datacenters
|
—
|
Cancelled
|
10/100
|
|
Project Aggie (College Station)
|
US — Texas (ERCOT)
|
Priority Power Management, LLC, PPM Data LLC, Brandon Schwertner
|
600
unspecified
|
Cancelled
|
10/100
|