Jurisdiction: US — Virginia (PJM/Dominion)
14210/14300 John Marshall Highway, Gainesville, Prince William County — NTT's largest planned North American campus: 4 buildings, 2M sq ft, 336MW target. VA10 (84MW critical IT) operational Nov 2023; VA11-13 building out. $257.4M land from Lerner Enterprises (2022).
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | staleness decay | +10 | NTT Grove at Gainesville Campus (VA10-VA13) | Newest capital evidence is 2022-06-15 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | staleness decay | -20 | NTT Grove at Gainesville Campus (VA10-VA13) | Newest regulatory evidence is 2022-06-15 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Capital | baseline | 40 | NTT Grove at Gainesville Campus (VA10-VA13) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Infrastructure | baseline | 70 | NTT Grove at Gainesville Campus (VA10-VA13) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | interconnection progress | +15 | Commissioning | Power/interconnection milestone "Commissioning" achieved on 2023-11-01 — largest single health event (§B.2.3). |
| Infrastructure | staleness decay | -25 | NTT Grove at Gainesville Campus (VA10-VA13) | Newest infrastructure evidence is 2023-11-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | NTT Grove at Gainesville Campus (VA10-VA13) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | NTT Grove at Gainesville Campus (VA10-VA13) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Commissioning | Milestone "Commissioning" achieved on/ahead of its first announced date (2023-11-01). |
| Schedule | staleness decay | -25 | NTT Grove at Gainesville Campus (VA10-VA13) | Newest schedule evidence is 2023-11-01 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Commissioning · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| NTT Global Data Centers | — | — | |
| Lerner Enterprises | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Lerner Enterprises · Jun 15, 2022 · backs: status
https://lerner.com/news/ntt-expanding-data-center-portfolio-with-257m-land-buy-in-prince-william-county-from-lerner/
Data Center Dynamics · Jun 15, 2022 · backs: actual date
https://www.datacenterdynamics.com/en/news/ntt-plans-336mw-campus-in-gainesville-virginia/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Lerner Enterprises · relevance 0.90
· NTT · relevance 0.90