Aligned Salt Lake Metro Campus (SLC-01 to SLC-04)

Aligned Salt Lake Metro Campus (SLC-01 to SLC-04)

Operating
Confirmed

Jurisdiction: US — Utah (Rocky Mountain Power / PacifiCorp, WECC — non-RTO)

West Jordan (Salt Lake County), adjacent to Novva's campus — SLC-01/02 operating (SLC-02: 240,000 sq ft shell, 24MW MEP prep/12MW installed, completed 2021, Turner-built); SLC-03 (100+MW, announced 2022, phase 1 ~Oct 2025); SLC-04 (100MW) announced May 2026. Delta³ waterless cooling.

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

69.5 /100
69.5/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

80 /100
80/100

Regulatory

70 /100
70/100

Infrastructure

70 /100
70/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Aligned Salt Lake Metro Campus (SLC-01 to SLC-04) No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Regulatory baseline 70 Aligned Salt Lake Metro Campus (SLC-01 to SLC-04) No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Infrastructure baseline 70 Aligned Salt Lake Metro Campus (SLC-01 to SLC-04) No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 Aligned Salt Lake Metro Campus (SLC-01 to SLC-04) No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).

Milestones

No milestones recorded for this project yet.

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Turner Construction
General Contractor
Aligned Data Centers
Developer

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Turner Construction · backs: status

    https://www.turnerconstruction.com/projects/aligned-salt-lake-city-data-center-slc-02

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Aligned Data Centers · relevance 0.90

  2. Turner Construction · relevance 0.90