Compute Institute
Ratings for the physical buildout of AI
Microsoft Boydton Campus

Microsoft Boydton Campus

Operating
Confirmed

Jurisdiction: US — Virginia (PJM/Dominion)

Boydton, Mecklenburg County, VA; coordinates approximate to town; Microsoft's largest East Coast Azure campus, repeatedly expanded since 2010

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

54 /100
54/100

Methodology prs-v0.1 · computed · trigger: manual

Schedule

60 /100
60/100

Regulatory

50 /100
50/100

Infrastructure

50 /100
50/100

Capital

50 /100
50/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Regulatory staleness decay -20 Microsoft Boydton Campus Newest regulatory evidence is 2010-08-27 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Capital baseline 40 Microsoft Boydton Campus Capital base before committed-capital evidence (announcement-only anchor region, §B.2.4).
Capital capital commitment +30 Microsoft (investor) investor role committed $2,000,000,000 (capex undisclosed — coverage unverifiable).
Capital staleness decay -20 Microsoft Boydton Campus Newest capital evidence is 2010-08-27 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Infrastructure baseline 70 Microsoft Boydton Campus No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure staleness decay -20 Microsoft Boydton Campus Newest infrastructure evidence is 2010-08-27 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 Microsoft Boydton Campus No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 Microsoft Boydton Campus No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2010-08-27).
Schedule staleness decay -25 Microsoft Boydton Campus Newest schedule evidence is 2010-08-27 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Announcement

    Achieved

    Announcement · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Microsoft
Investor
100% $2.0B
Microsoft
Operator
Microsoft
Owner
Dominion Virginia Power (Dominion Energy)
Power Supplier

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Data Center Knowledge · Aug 27, 2010 · backs: actual date, status

    https://www.datacenterknowledge.com/hyperscalers/microsoft-picks-virginia-for-major-data-center

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Virginia Economic Development Partnership · relevance 0.85

  2. · Data Center Knowledge · relevance 0.85

  3. YourGV · relevance 0.70

  4. DCD · relevance 0.90