Jurisdiction: US — Rest of US (composite)
Methodology prs-v0.1 · computed · trigger: event driven
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | Joliet data center campus | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Regulatory | baseline | 70 | Joliet data center campus | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | baseline | 70 | Joliet data center campus | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | Joliet data center campus | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
No milestones recorded for this project yet.
No active constraint observations recorded against this project.
No entity roles recorded for this project.
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Circle of Blue (Water) · Jun 5, 2026 · backs: capacity mw
https://www.circleofblue.org/2026/water-policy-politics/illinois-fails-to-pass-landmark-act-requiring-responsible-data-center-energy-and-water-use/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Circle of Blue (Water) · relevance 0.70