Jurisdiction: US — Virginia (PJM/Dominion)
85 acres at Germanna & James Madison Highways, Culpeper County (Culpeper Technology Zone, ~60mi from Ashburn) — up to three 2-story DCs, 1.4M sq ft, 192MW campus; 300MW Dominion substation on-site; first building (IAD5, 40MW) targeted Q1 2027.
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | DataBank Culpeper Campus (IAD5/IAD6) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | DataBank Culpeper Campus (IAD5/IAD6) | Newest capital evidence is 2023-11-14 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | baseline | 70 | DataBank Culpeper Campus (IAD5/IAD6) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | DataBank Culpeper Campus (IAD5/IAD6) | Newest infrastructure evidence is 2023-11-14 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | DataBank Culpeper Campus (IAD5/IAD6) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | staleness decay | -20 | DataBank Culpeper Campus (IAD5/IAD6) | Newest regulatory evidence is 2023-11-14 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Schedule | baseline | 80 | DataBank Culpeper Campus (IAD5/IAD6) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | staleness decay | -25 | DataBank Culpeper Campus (IAD5/IAD6) | Newest schedule evidence is 2023-11-14 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
No milestones recorded for this project yet.
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Dominion Virginia Power (Dominion Energy) | — | — | |
| DataBank | — | — | |
| AECOM Tishman | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Data Center Dynamics · Nov 14, 2023 · backs: capacity mw, status
https://www.datacenterdynamics.com/en/news/databank-acquires-85-acres-in-virginias-culpeper-for-192mw-data-center-campus/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Data Center Dynamics · relevance 0.95
Construction Dive · relevance 0.90