Jurisdiction: Netherlands
Cultuurweg 11, Middenmeer (Agriport Business Park), Hollands Kroon — 14.4-hectare site, two independent 36MW buildings (five data halls each). Hollands Kroon was explicitly EXEMPTED from the Dutch national hyperscale moratorium.
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | Microsoft AMS13/AMS14 (Middenmeer, Hollands Kroon) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | Microsoft AMS13/AMS14 (Middenmeer, Hollands Kroon) | Newest capital evidence is 2023-04-21 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | baseline | 70 | Microsoft AMS13/AMS14 (Middenmeer, Hollands Kroon) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | Microsoft AMS13/AMS14 (Middenmeer, Hollands Kroon) | Newest infrastructure evidence is 2023-04-21 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | Microsoft AMS13/AMS14 (Middenmeer, Hollands Kroon) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | staleness decay | -20 | Microsoft AMS13/AMS14 (Middenmeer, Hollands Kroon) | Newest regulatory evidence is 2023-04-21 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Schedule | baseline | 80 | Microsoft AMS13/AMS14 (Middenmeer, Hollands Kroon) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | staleness decay | -25 | Microsoft AMS13/AMS14 (Middenmeer, Hollands Kroon) | Newest schedule evidence is 2023-04-21 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
No milestones recorded for this project yet.
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Microsoft | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Data Center Dynamics · Apr 21, 2023 · backs: capacity mw, status
https://www.datacenterdynamics.com/en/news/microsoft-gains-construction-permission-for-data-center-in-hollands-kroon/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Data Center Dynamics · relevance 0.90
· Microsoft (local.microsoft.com) · relevance 0.70
Gemeente Hollands Kroon · relevance 0.30