Jurisdiction: South Korea
Bupyeong-gu, Incheon (Seoul metro) — first phase of Digital Edge's 100+MW campus; RFS Oct 16 2024; AI-ready (up to 130kW/rack liquid-cooled, design PUE 1.25); developed with SK Ecoplant.
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | staleness decay | +10 | Digital Edge SEL2 (Incheon) | Newest capital evidence is 2024-10-16 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | staleness decay | -20 | Digital Edge SEL2 (Incheon) | Newest regulatory evidence is 2024-10-16 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Capital | baseline | 40 | Digital Edge SEL2 (Incheon) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Infrastructure | baseline | 70 | Digital Edge SEL2 (Incheon) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | interconnection progress | +15 | Commissioning | Power/interconnection milestone "Commissioning" achieved on 2024-10-16 — largest single health event (§B.2.3). |
| Infrastructure | staleness decay | -25 | Digital Edge SEL2 (Incheon) | Newest infrastructure evidence is 2024-10-16 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | Digital Edge SEL2 (Incheon) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | Digital Edge SEL2 (Incheon) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Commissioning | Milestone "Commissioning" achieved on/ahead of its first announced date (2024-10-16). |
| Schedule | staleness decay | -25 | Digital Edge SEL2 (Incheon) | Newest schedule evidence is 2024-10-16 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Commissioning · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Digital Edge | — | — | |
| SK Ecoplant | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Digital Edge · Oct 16, 2024 · backs: actual date, capacity mw, status
https://www.digitaledgedc.com/news/digital-edge-announces-availability-of-36mw-data-center-in-south-korea/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· Digital Edge · relevance 0.90