Jurisdiction: US — Rest of US (composite)
Methodology prs-v0.1 · computed · trigger: event driven
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | baseline | 40 | Talen Energy - AWS Susquehanna PPA | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | Talen Energy - AWS Susquehanna PPA | Newest capital evidence is 2025-06-11 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | baseline | 70 | Talen Energy - AWS Susquehanna PPA | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | staleness decay | -20 | Talen Energy - AWS Susquehanna PPA | Newest infrastructure evidence is 2025-06-11 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | Talen Energy - AWS Susquehanna PPA | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | staleness decay | -20 | Talen Energy - AWS Susquehanna PPA | Newest regulatory evidence is 2025-06-11 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Schedule | baseline | 80 | Talen Energy - AWS Susquehanna PPA | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | staleness decay | -25 | Talen Energy - AWS Susquehanna PPA | Newest schedule evidence is 2025-06-11 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
No milestones recorded for this project yet.
No active constraint observations recorded against this project.
No entity roles recorded for this project.
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
POWER Magazine · Jun 1, 2025 · backs: announced date, capacity mw, capex usd, status
https://www.powermag.com/talen-amazon-launch-18b-nuclear-ppa-a-grid-connected-ipp-model-for-the-data-center-era/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· POWER Magazine · relevance 0.90