Jurisdiction: Malaysia — Johor (Johor-Singapore SEZ)
38 acres, Sedenak (Kulai district), Johor — three-building 110MW hyperscale campus; ByteDance anchor tenant. Phase 1 opened Oct 2022 (~314 days from groundbreaking); later phases through 2024.
Methodology prs-v0.1 · computed · trigger: scheduled
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Capital | staleness decay | +10 | Bridge Data Centres MY06 (Sedenak) | Newest capital evidence is 2022-10-20 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | staleness decay | -20 | Bridge Data Centres MY06 (Sedenak) | Newest regulatory evidence is 2022-10-20 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Capital | baseline | 40 | Bridge Data Centres MY06 (Sedenak) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Infrastructure | baseline | 70 | Bridge Data Centres MY06 (Sedenak) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Infrastructure | interconnection progress | +15 | Commissioning | Power/interconnection milestone "Commissioning" achieved on 2022-10-20 — largest single health event (§B.2.3). |
| Infrastructure | staleness decay | -25 | Bridge Data Centres MY06 (Sedenak) | Newest infrastructure evidence is 2022-10-20 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | Bridge Data Centres MY06 (Sedenak) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Schedule | baseline | 80 | Bridge Data Centres MY06 (Sedenak) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Commissioning | Milestone "Commissioning" achieved on/ahead of its first announced date (2022-10-20). |
| Schedule | staleness decay | -25 | Bridge Data Centres MY06 (Sedenak) | Newest schedule evidence is 2022-10-20 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Commissioning · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Bridge Data Centres | — | — | |
| ByteDance | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
MIDA · Oct 20, 2022 · backs: actual date, capacity mw, status
https://www.mida.gov.my/media-release/bridge-data-centres-and-bytedance-celebrate-grand-opening-of-the-first-phase-hyperscale-data-centre-my06-in-johor-malaysia/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· MIDA · relevance 0.90