Vantage Data Centers Frontier (Shackelford County / Stargate)

Vantage Data Centers Frontier (Shackelford County / Stargate)

Construction
Confirmed

Jurisdiction: US — Texas (ERCOT)

1,200-acre campus in Shackelford County, TX (near Abilene); coordinates approximate to county centroid

Capacity
1,400 MW basis: unspecified
GPUs (est.)
—
Capex
$25.0B
Announced
—
Target operational
—

Delivery health score

69.5 /100
69.5/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

90 /100
90/100

Regulatory

70 /100
70/100

Infrastructure

70 /100
70/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Vantage Data Centers Frontier (Shackelford County / Stargate) No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Infrastructure baseline 70 Vantage Data Centers Frontier (Shackelford County / Stargate) No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Regulatory baseline 70 Vantage Data Centers Frontier (Shackelford County / Stargate) No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 Vantage Data Centers Frontier (Shackelford County / Stargate) No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2025-08-20).
Schedule milestone achieved +5 Groundbreaking Milestone "Groundbreaking" achieved on/ahead of its first announced date (2025-08-31).

Milestones

  1. Announcement

    Achieved

    Announcement · Actual:

  2. Groundbreaking

    Achieved

    Groundbreaking · Actual:

  3. Commissioning

    Expected
    1 revision

    Commissioning · Expected:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
OpenAI
Anchor Tenant
— —
Vantage Data Centers
Developer
— —
Vantage Data Centers
Investor
— —
Vantage Data Centers
Owner
— —
Silver Lake
Investor
— —
JPMorgan Chase
Lender
— —
DigitalBridge
Investor
— —
MUFG (Mitsubishi UFJ Financial Group)
Lender
— —
VoltaGrid
Power Supplier
— —
INNIO (Jenbacher)
Equipment Supplier
— —

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Vantage Data Centers · backs: capacity mw, capex usd, expected date

    https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/

  2. RCR Wireless · Aug 20, 2025 · backs: actual date

    https://www.rcrwireless.com/20250820/ai-infrastructure/vantage-ai-texas

  3. DCD · backs: actual date, status

    https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-texas-gigawatt-data-center-campus-for-openai/

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Construction Owners · relevance 0.90

  2. · POWER Magazine · relevance 0.80

  3. · OpenAI · relevance 0.85

  4. DCD · relevance 0.90

  5. Vantage Data Centers · relevance 0.90

  6. DCD · relevance 0.90