Cirion BUE1 Buenos Aires Expansion

Cirion BUE1 Buenos Aires Expansion

Operating
Confirmed

Jurisdiction: Argentina

Cirion BUE1 facility, Buenos Aires, Argentina; exact site coordinates not confirmed in cited sources. Described by PeeringDB as the most connected data center in the region

Capacity
9 MW basis: unspecified
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

62.5 /100
62.5/100

Methodology prs-v0.1 · computed · trigger: manual

Schedule

85 /100
85/100

Regulatory

50 /100
50/100

Infrastructure

50 /100
50/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Cirion BUE1 Buenos Aires Expansion No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Infrastructure baseline 70 Cirion BUE1 Buenos Aires Expansion No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Infrastructure staleness decay -20 Cirion BUE1 Buenos Aires Expansion Newest infrastructure evidence is 2025-08-21 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Regulatory baseline 70 Cirion BUE1 Buenos Aires Expansion No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Regulatory staleness decay -20 Cirion BUE1 Buenos Aires Expansion Newest regulatory evidence is 2025-08-21 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).
Schedule baseline 80 Cirion BUE1 Buenos Aires Expansion No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2025-08-21).

Milestones

  1. Announcement

    Achieved

    Announcement · Actual:

  2. Commissioning

    Expected
    1 revision

    Commissioning · Expected:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Cirion Technologies
Operator
Cirion Technologies
Owner
Stonepeak
Investor
100%

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Cirion press release · Aug 21, 2025 · backs: actual date, status

    https://press.ciriontechnologies.com/en/2025/08/21/data-center-buenos-aires-digital-transformation-argentina/

  2. Telecompaper · backs: capacity mw, expected date

    https://www.telecompaper.com/news/cirion-to-upgrade-buenos-aires-data-centre-to-meet-ai-demand--1545742

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Cirion press release · relevance 0.35

  2. · Stonepeak · relevance 0.20

  3. Telecompaper · relevance 0.70