Jurisdiction: US — Arizona (APS/SRP)
Mesa, Arizona (Greater Phoenix). 84-acre campus, 5 data centers, ~2.7M sq ft; 206MW operational since Apr 2023.
Methodology prs-v0.1 · computed · trigger: manual
Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Infrastructure | baseline | 70 | EdgeCore Mesa (Greater Phoenix) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Capital | baseline | 40 | EdgeCore Mesa (Greater Phoenix) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Capital | staleness decay | +10 | EdgeCore Mesa (Greater Phoenix) | Newest capital evidence is 2025-05-20 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | interconnection progress | +15 | Energization | Power/interconnection milestone "Energization" achieved on 2023-04-01 — largest single health event (§B.2.3). |
| Infrastructure | staleness decay | -25 | EdgeCore Mesa (Greater Phoenix) | Newest infrastructure evidence is 2023-04-01 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Regulatory | baseline | 70 | EdgeCore Mesa (Greater Phoenix) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | staleness decay | -20 | EdgeCore Mesa (Greater Phoenix) | Newest regulatory evidence is 2025-05-20 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Schedule | baseline | 80 | EdgeCore Mesa (Greater Phoenix) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2025-05-20). |
| Schedule | milestone achieved | +5 | Energization | Milestone "Energization" achieved on/ahead of its first announced date (2023-04-01). |
| Schedule | staleness decay | -25 | EdgeCore Mesa (Greater Phoenix) | Newest schedule evidence is 2025-05-20 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Energization · Actual:
Announcement · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| EdgeCore Digital Infrastructure | — | — | |
| Partners Group | — | — | |
| Salt River Project | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
EdgeCore · May 20, 2025 · backs: actual date, status
https://www.edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw
EdgeCore Digital Infrastructure · backs: capacity mw
https://www.edgecore.com/phoenix
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.
· EdgeCore
· EdgeCore
EdgeCore Digital Infrastructure