Vantage JHB1 (ex-Yondr) Sedenak Campus

Vantage JHB1 (ex-Yondr) Sedenak Campus

Construction
Confirmed

Jurisdiction: Malaysia — Johor (Johor-Singapore SEZ)

72.5-acre site, Sedenak Tech Park, Johor (Johor-Singapore SEZ) — three facilities, 300MW critical IT at full build. Built by Yondr (substation energized Mar 2024; $900M Phase-1 financing); acquired by Vantage Nov 2025 (GIC/ADIA-backed), renamed JHB1. First facility operational.

Capacity
300 MW basis: it load
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

66 /100
66/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

80 /100
80/100

Regulatory

70 /100
70/100

Infrastructure

70 /100
70/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Vantage JHB1 (ex-Yondr) Sedenak Campus No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Regulatory baseline 70 Vantage JHB1 (ex-Yondr) Sedenak Campus No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Infrastructure baseline 70 Vantage JHB1 (ex-Yondr) Sedenak Campus No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 Vantage JHB1 (ex-Yondr) Sedenak Campus No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).

Milestones

No milestones recorded for this project yet.

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Yondr Group
Developer

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Yondr Group · Dec 1, 2024 · backs: capacity mw

    https://www.yondrgroup.com/newsroom/press-release/yondr-group-secures-over-us900m-in-project-financing-to-complete-98mw-johor-data-center/

  2. Vantage Data Centers · backs: status

    https://vantage-dc.com/data-center-locations/apac/johor-malaysia

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · Yondr Group · relevance 0.95

  2. Vantage Data Centers · relevance 0.70