Compute Institute
Ratings for the physical buildout of AI
Microsoft Palmetto Data Center

Microsoft Palmetto Data Center

Construction
Confirmed

Jurisdiction: US — Georgia (Southern/Georgia Power)

City of Palmetto, Fulton County (south metro Atlanta) — part of Microsoft's Fulton/Douglas Azure region buildout. Construction from April 2024, first-phase completion target early October 2025. DISTINCT from Microsoft Fairwater (Fayetteville/QTS) and Project Rita (Tyrone).

Capacity
GPUs (est.)
Capex
Announced
Target operational

Delivery health score

59 /100
59/100

Methodology prs-v0.1 · computed · trigger: scheduled

Schedule

60 /100
60/100

Regulatory

70 /100
70/100

Infrastructure

70 /100
70/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Microsoft Palmetto Data Center No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Infrastructure baseline 70 Microsoft Palmetto Data Center No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Regulatory baseline 70 Microsoft Palmetto Data Center No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 Microsoft Palmetto Data Center No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Groundbreaking Milestone "Groundbreaking" achieved on/ahead of its first announced date (2024-04-01).
Schedule staleness decay -25 Microsoft Palmetto Data Center Newest schedule evidence is 2024-04-01 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Groundbreaking

    Achieved

    Groundbreaking · Actual:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
Microsoft
Owner
Turner Construction
General Contractor

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Microsoft Local · backs: actual date, status

    https://local.microsoft.com/blog/palmetto-datacenter-construction-update/

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. Microsoft Local