Jurisdiction Index / Canada
Canada
JCI composite · as of · methodology v0
Canada scores 62.3/100 on the Compute Institute Jurisdiction Competitiveness Index (Tier 2, Competitive), ranking #10 of 30 rated jurisdictions with a stable outlook, as of June 15, 2026 under methodology v0. Its strongest dimension is Stability & Execution Risk at 8.5/10; its weakest is Power Availability & Deliverability at 5.2/10. 21 of 22 sub-factors are scored on E1–E2 evidence (data confidence A).
Dimension breakdown
Seven dimensions, each 0–10, weighted per methodology v0. JCI = Σ(dimension × weight) × 10.
Power Availability & Deliverability
Power Cost
Speed to Build
Regulatory & AI Policy Environment
Fiscal & Incentives
Capital & Ecosystem Depth
Stability & Execution Risk
Sub-factor scores and sources
Every base-scored input below carries E1–E2 evidence: a justification, an evidence-level grade, and a link to the underlying source document.
Power Availability & Deliverability — 5.2/10 (weight 20%)
|
Sub-factor
|
Score
|
Justification
|
Evidence
|
Source
|
|---|---|---|---|---|
| Grid headroom 40% of dimension | 5 /10 | AESO imposed an interim 1,200 MW Phase 1 cap on new large-load connections; Hydro-Québec rations allocations; BC limits data-center energy use — hydro-rich system but binding administrative caps. as of | AESO Large Load Projects / phased connection plan www.aeso.ca | |
| Time-to-power 35% of dimension | 4 /10 | Grid connections gated by allocation rounds (Quebec/AESO competitive calls limited to ~300-400 MW tranches); off-grid gas in Alberta is the practical fast path but adds generation build time. as of | AESO phased connection plan (analysis, McCarthy Tétrault) www.mccarthy.ca | |
| Energy mix & expandability 15% of dimension | 6.5 /10 | Abundant hydro baseload plus legal behind-the-fence gas generation in Alberta's deregulated market; new large hydro additions are decade-scale. as of | Osler — Powering AI: Canada's grid connection policies www.osler.com | |
| Water availability 10% of dimension | 8.5 /10 | Low baseline water stress in nearly all candidate siting regions per WRI Aqueduct; cold climate aids cooling. as of | WRI Aqueduct Water Risk Atlas www.wri.org |
Power Cost — 6.9/10 (weight 12.5%)
|
Sub-factor
|
Score
|
Justification
|
Evidence
|
Source
|
|---|---|---|---|---|
| Industrial electricity price 60% of dimension | 7.5 /10 | Hydro-Québec Rate L ~CAD 0.06/kWh (~USD 45/MWh) among lowest in cohort; Alberta pool prices higher but contractable. as of | Hydro-Québec Rate L (large-power industrial) www.hydroquebec.com | |
| Price trajectory & exposure 25% of dimension | 5 /10 | Hydro-Québec has proposed roughly doubling rates for large data centres from mid-2026 (approved direction, flagged E2); Alberta transmission tariff redesign in progress. as of | Hydro-Québec large-load rate proposal (reported, The Logic/DCD) www.datacenterdynamics.com | |
| Cost certainty / contractability 15% of dimension | 7.5 /10 | Long-tenor contracts available (HQ contracts, Alberta merchant PPAs in CAD); convertible currency, stable counterparties. as of | Osler — Powering AI: Canada's grid connection policies www.osler.com |
Speed to Build — 5.9/10 (weight 17.5%)
|
Sub-factor
|
Score
|
Justification
|
Evidence
|
Source
|
|---|---|---|---|---|
| Permitting regime 40% of dimension | 5.5 /10 | Alberta is streamlining (AUC process changes for DC development in force); provincial environmental assessment and municipal processes elsewhere add 1-2 yrs vs US Sun Belt. as of | Alberta regulatory changes for data centre development (Bennett Jones analysis of AUC rules) www.bennettjones.com | |
| Observed construction velocity 35% of dimension | — | Excluded — no E1–E2 evidence available; weaker evidence cannot enter a base score. | — | — |
| Labor & supply capacity 25% of dimension | 6.5 /10 | Solid construction labor and EPC depth in Alberta/Ontario from energy megaprojects; smaller specialized DC trades pool than US. as of | Statistics Canada construction labour data www.statcan.gc.ca |
Regulatory & AI Policy Environment — 6.1/10 (weight 12.5%)
|
Sub-factor
|
Score
|
Justification
|
Evidence
|
Source
|
|---|---|---|---|---|
| AI-specific law in force 35% of dimension | 5.5 /10 | No federal AI statute in force (AIDA/Bill C-27 died on the order paper in 2025); Quebec Law 25 privacy rules apply — permissive but unsettled. as of | Parliament of Canada — Bill C-27 status www.parl.ca | |
| DC-specific regulation 35% of dimension | 4.5 /10 | Binding allocation/limitation regimes in force: AESO interim cap, Hydro-Québec authorization requirement for large loads, BC restrictions and cryptomining ban. as of | Hydro-Québec large-load rate proposal (reported, The Logic/DCD) www.datacenterdynamics.com | |
| Regulatory predictability 30% of dimension | 8.5 /10 | WGI Regulatory Quality/Rule of Law ~93rd percentile; transparent regulatory process. as of | World Bank Worldwide Governance Indicators www.worldbank.org |
Fiscal & Incentives — 5.4/10 (weight 10%)
|
Sub-factor
|
Score
|
Justification
|
Evidence
|
Source
|
|---|---|---|---|---|
| Enacted incentives 40% of dimension | 5 /10 | Alberta AI Data Centre Strategy in force (process facilitation, not tax abatement); no national DC-specific tax exemption; federal Sovereign AI Compute Strategy funds compute, not private campuses. as of | Canadian Sovereign AI Compute Strategy (ISED) ised-isde.canada.ca | |
| Headline tax burden 40% of dimension | 5.5 /10 | Combined federal-provincial CIT ~26.5% (15% federal + ~11.5% provincial); accelerated investment incentive partially offsets. as of | OECD Corporate Tax Statistics — United States www.oecd.org | |
| Incentive durability 20% of dimension | 6 /10 | Few incentives to claw back; Quebec's reversal on crypto-era discounts is a documented precedent of regime tightening. as of | Hydro-Québec cryptocurrency moratorium record www.hydroquebec.com |
Capital & Ecosystem Depth — 5.9/10 (weight 12.5%)
|
Sub-factor
|
Score
|
Justification
|
Evidence
|
Source
|
|---|---|---|---|---|
| Committed capital 40% of dimension | 6 /10 | Signed/financed projects (TELUS Sovereign AI Factories, Bell AI Fabric, eStruxture expansions) total low single-digit GW; mega-announcements like Wonder Valley remain E4 and are excluded. as of | Bell Canada AI Fabric / TELUS sovereign AI disclosures www.bce.ca | |
| Ecosystem 30% of dimension | 6.5 /10 | Mature Toronto/Montreal DC markets (~1 GW combined), strong cross-border fiber, hyperscaler regions present, unrestricted GPU access as close US ally. as of | EIA/ERCOT load data; TeleGeography fiber maps www.submarinecablemap.com | |
| Sovereign/anchor capital availability 30% of dimension | 5 /10 | Funded federal $2B Sovereign AI Compute Strategy in force plus large pension funds (CPPIB, CDPQ) active in digital infra, though without AI-DC mandates. as of | Canadian Sovereign AI Compute Strategy (ISED) ised-isde.canada.ca |
Stability & Execution Risk — 8.5/10 (weight 15%)
|
Sub-factor
|
Score
|
Justification
|
Evidence
|
Source
|
|---|---|---|---|---|
| Political/policy continuity 40% of dimension | 8 /10 | WGI Political Stability/Government Effectiveness high; federal-provincial friction over energy is real but infrastructure regimes rarely reversed retroactively. as of | World Bank Worldwide Governance Indicators www.worldbank.org | |
| Currency, transfer & convertibility 35% of dimension | 9 /10 | Fully convertible CAD, no capital controls (IMF AREAER), AAA/AA+ sovereign. as of | IMF AREAER — United States www.elibrary-areaer.imf.org | |
| Physical & geopolitical risk 25% of dimension | 8.5 /10 | No conflict/sanctions exposure; wildfire smoke and extreme cold are manageable design considerations; US trade-policy dependency a mild flag. as of | ACLED / public risk data acleddata.com |
Signals
Recent ingested source documents linked to this jurisdiction via extracted claims or triage mentions, newest first.
-
· Government of Canada News · relevance 0.00
-
· BetaKit · relevance 0.00
-
· Government of Canada News · relevance 0.00
-
· Government of Canada News · relevance 0.00
-
· Renewable Energy World · relevance 0.00
-
· Government of Canada News · relevance 0.30
-
· Data Center Dynamics · relevance 0.75
-
· Government of Canada News · relevance 0.00
-
· Government of Canada News · relevance 0.00
-
· BetaKit · relevance 0.00
Scores are reproducible from the frozen inputs snapshot recorded at computation time (2026-06-15T23:52:36+00:00). See the full methodology for rubrics, weights, and the evidence ladder.