Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.
|
Dimension
|
Factor
|
Contribution
|
Cites
|
Narrative
|
|---|---|---|---|---|
| Infrastructure | baseline | 70 | AWS Hilliard Third Campus (Scioto Darby Road) | No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines). |
| Capital | staleness decay | +10 | AWS Hilliard Third Campus (Scioto Darby Road) | Newest capital evidence is 2022-07-29 (freshness window 12 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Infrastructure | staleness decay | -20 | AWS Hilliard Third Campus (Scioto Darby Road) | Newest infrastructure evidence is 2022-07-29 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Capital | baseline | 40 | AWS Hilliard Third Campus (Scioto Darby Road) | No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4). |
| Regulatory | baseline | 70 | AWS Hilliard Third Campus (Scioto Darby Road) | No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines). |
| Regulatory | permit granted | +6 | Utility Approval | Permitting milestone "Utility Approval" achieved on 2022-07-14. |
| Regulatory | permit granted | +6 | Utility Approval | Permitting milestone "Utility Approval" achieved on 2022-07-21. |
| Regulatory | staleness decay | -25 | AWS Hilliard Third Campus (Scioto Darby Road) | Newest regulatory evidence is 2022-07-21 (freshness window 9 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
| Schedule | baseline | 80 | AWS Hilliard Third Campus (Scioto Darby Road) | No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines). |
| Schedule | milestone achieved | +5 | Announcement | Milestone "Announcement" achieved on/ahead of its first announced date (2022-05-01). |
| Schedule | milestone achieved | +5 | Utility Approval | Milestone "Utility Approval" achieved on/ahead of its first announced date (2022-07-14). |
| Schedule | milestone achieved | +5 | Utility Approval | Milestone "Utility Approval" achieved on/ahead of its first announced date (2022-07-21). |
| Schedule | staleness decay | -25 | AWS Hilliard Third Campus (Scioto Darby Road) | Newest schedule evidence is 2022-07-21 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information). |
Announcement · Actual:
Utility approval · Actual:
Utility approval · Actual:
No active constraint observations recorded against this project.
|
Entity
|
Role
|
Ownership
|
Committed capital
|
|---|---|---|---|
| Amazon Web Services | — | — |
Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Data Center Dynamics · Jul 29, 2022 · backs: actual date, status
https://www.datacenterdynamics.com/en/news/amazon-granted-permission-for-third-hilliard-campus-in-ohio/
Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.