Stargate Argentina (Patagonia)

Stargate Argentina (Patagonia)

Announced
Confirmed

Jurisdiction: Argentina

First Stargate node in Latin America: OpenAI and Sur Energy signed a letter of intent (October 2025) to develop an AI data center in Argentine Patagonia of up to 500 MW with investment of up to $25bn, under the RIGI large-investment incentive regime. LOI stage — no committed capital evidenced and no publicly evidenced construction or energization timeline.

Capacity
500 MW basis: unspecified
GPUs (est.)
Capex
$25.0B
Announced
Oct 10, 2025
Target operational

Delivery health score

58.5 /100
58.5/100

Methodology prs-v0.1 · computed · trigger: manual

Schedule

60 /100
60/100

Regulatory

70 /100
70/100

Infrastructure

70 /100
70/100

Capital

40 /100
40/100

Why this score — factor breakdown

Each factor below contributed to the current score. Contributions are rubric weights from methodology prs-v0.1; every factor cites the record it is derived from.

Dimension
Factor
Contribution
Cites
Narrative
Capital baseline 40 Stargate Argentina (Patagonia) No committed capital evidenced on any entity role — announcement-only anchor region (§B.2.4).
Infrastructure baseline 70 Stargate Argentina (Patagonia) No-adverse-evidence infrastructure baseline (disclosed config, scoring.prs.baselines).
Regulatory baseline 70 Stargate Argentina (Patagonia) No-adverse-evidence regulatory baseline (disclosed config, scoring.prs.baselines).
Schedule baseline 80 Stargate Argentina (Patagonia) No-adverse-evidence schedule baseline (disclosed config, scoring.prs.baselines).
Schedule milestone achieved +5 Announcement Milestone "Announcement" achieved on/ahead of its first announced date (2025-10-31).
Schedule staleness decay -25 Stargate Argentina (Patagonia) Newest schedule evidence is 2025-10-31 (freshness window 6 months) — score drifts one rubric level toward the stage-default prior of 50 (§B.4: silence is information).

Milestones

  1. Announcement

    Achieved

    Announcement · Actual:

  2. Groundbreaking

    Expected
    1 revision

    Groundbreaking · Expected:

  3. Energization

    Expected
    1 revision

    Energization · Expected:

Constraint observations

No active constraint observations recorded against this project.

Entities & roles

Entity
Role
Ownership
Committed capital
OpenAI
Anchor Tenant
Sur Energy
Developer
Sur Energy
Investor
Sur Energy
Power Supplier
Government of Argentina (Consejo Nuclear Argentino)
Government Partner

Sources & citations

Every substantive field on this record is backed by a canonical claim from a cited source document, graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. DCD · Oct 1, 2025 · backs: actual date, capacity mw, expected date, status

    https://www.datacenterdynamics.com/en/news/openai-plans-500mw-data-center-in-argentina/

  2. Buenos Aires Times · Oct 1, 2025 · backs: announced date, capex usd

    https://www.batimes.com.ar/news/argentina/openai-plans-to-build-massive-data-centre-in-argentina-avoids-mentioning-financial-figures.phtml

Signals

Recent ingested source documents linked to this project via extracted claims or triage mentions, newest first.

  1. · W.Media · relevance 0.95

  2. · Buenos Aires Times · relevance 0.70

  3. · DCD · relevance 0.90

  4. · Buenos Aires Herald · relevance 0.90

  5. Buenos Aires Times · relevance 0.75

  6. openai.com · relevance 0.00