The Compute Observer — Week of August 31, 2026

The Compute Observer — published by Compute Institute

Covering · Generated September 7, 2026 · Composed deterministically from stored, cited data — no generated prose · Methodology

The Compute Observer weekly intelligence brief for August 31–September 6, 2026. 5 jurisdictions were rated for the first time on the Jurisdiction Competitiveness Index; US — Tennessee (TVA federal power / MLGW & local distributors; non-RTO) leads at 66/100 (Tier 2 — Competitive, positive outlook). 2 PRS ratings moved (largest: Google Council Bluffs Data Center, -8.5 points). 38 new projects entered the tracker, representing 2,526 MW of tracked capacity. 10 high-relevance signals (relevance ≥ 0.7) were triaged, led by "Meta's $1.2bn data center in Kuna, Idaho, goes live" (Data Center Dynamics). No milestone events were recorded this week.

Events This Week

No published impact events occurred in this window.

Jurisdiction Competitiveness Index

Jurisdiction
JCI
Change
Outlook
What happened
Citations
Qatar 77.4/100 +0.0
Positive
Qatar's JCI holds at 77.4/100; outlook remains Positive.
US — Iowa (MISO) 76.5/100 +0.0
Stable
US — Iowa (MISO)'s JCI holds at 76.5/100; outlook remains Stable.
US — Indiana (MISO) 72.4/100 +0.0
Positive
US — Indiana (MISO)'s JCI holds at 72.4/100; outlook remains Positive.
US — Texas (ERCOT) 72.3/100 +0.0
Stable
US — Texas (ERCOT)'s JCI holds at 72.3/100; outlook remains Stable.
United Arab Emirates 69.7/100 +0.0
Positive
United Arab Emirates's JCI holds at 69.7/100; outlook remains Positive.
US — Wisconsin (MISO) 68.5/100 +0.0
Positive
US — Wisconsin (MISO)'s JCI holds at 68.5/100; outlook remains Positive.
US — Arizona (APS/SRP) 67.2/100 +0.0
Stable
US — Arizona (APS/SRP)'s JCI holds at 67.2/100; outlook remains Stable.
US — Georgia (Southern/Georgia Power) 67.2/100 +0.0
Stable
US — Georgia (Southern/Georgia Power)'s JCI holds at 67.2/100; outlook remains Stable.
US — Tennessee (TVA federal power / MLGW & local distributors; non-RTO) 66/100
New rating
Positive
US — Tennessee (TVA federal power / MLGW & local distributors; non-RTO) enters the Jurisdiction Index at JCI 66/100 (Tier 2 — Competitive) with a Positive outlook.
Saudi Arabia 65.2/100 +0.0
Stable
Saudi Arabia's JCI holds at 65.2/100; outlook remains Stable.
US — Louisiana (Entergy Louisiana / SWEPCO / Cleco — MISO South, LRZ 9; regulator: Louisiana Public Service Commission) 63.5/100
New rating
Positive
US — Louisiana (Entergy Louisiana / SWEPCO / Cleco — MISO South, LRZ 9; regulator: Louisiana Public Service Commission) enters the Jurisdiction Index at JCI 63.5/100 (Tier 2 — Competitive) with a Positive outlook.
US — Rest of US (composite) 63.4/100 +0.0
Stable
US — Rest of US (composite)'s JCI holds at 63.4/100; outlook remains Stable.
US — North Carolina (Duke Energy) 63.4/100 +0.0
Positive
US — North Carolina (Duke Energy)'s JCI holds at 63.4/100; outlook remains Positive.
Sweden 63.1/100 +0.0
Positive
Sweden's JCI holds at 63.1/100; outlook remains Positive.
France 62.3/100 +0.0
Stable
France's JCI holds at 62.3/100; outlook remains Stable.
Canada 62.3/100 +0.0
Stable
Canada's JCI holds at 62.3/100; outlook remains Stable.
Australia 61.9/100 +0.0
Negative
Australia's JCI holds at 61.9/100; outlook remains Negative.
US — Virginia (PJM/Dominion) 61.6/100 +0.0
Stable
US — Virginia (PJM/Dominion)'s JCI holds at 61.6/100; outlook remains Stable.
US — Ohio (AEP Ohio / PJM) 61.2/100 +0.0
Positive
US — Ohio (AEP Ohio / PJM)'s JCI holds at 61.2/100; outlook remains Positive.
US — Pennsylvania (PJM) 60.4/100 +0.0
Positive
US — Pennsylvania (PJM)'s JCI holds at 60.4/100; outlook remains Positive.
Denmark 60.2/100 +0.0
Negative
Denmark's JCI holds at 60.2/100; outlook remains Negative.
US — Minnesota (Xcel / MISO) 59.3/100 +0.0
Stable
US — Minnesota (Xcel / MISO)'s JCI holds at 59.3/100; outlook remains Stable.
Singapore 59/100 +0.0
Stable
Singapore's JCI holds at 59/100; outlook remains Stable.
Malaysia — Johor (Johor-Singapore SEZ) 58.9/100 +0.0
Positive
Malaysia — Johor (Johor-Singapore SEZ)'s JCI holds at 58.9/100; outlook remains Positive.
Japan 58.6/100 +0.0
Stable
Japan's JCI holds at 58.6/100; outlook remains Stable.
United Kingdom 57/100 +0.0
Stable
United Kingdom's JCI holds at 57/100; outlook remains Stable.
Germany 56.7/100 +0.0
Positive
Germany's JCI holds at 56.7/100; outlook remains Positive.
US — Nebraska (OPPD / NPPD / LES, 100% consumer-owned public power; SPP) 55.7/100
New rating
Stable
US — Nebraska (OPPD / NPPD / LES, 100% consumer-owned public power; SPP) enters the Jurisdiction Index at JCI 55.7/100 (Tier 3 — Contested) with a Stable outlook.
India 54.9/100 +0.0
Stable
India's JCI holds at 54.9/100; outlook remains Stable.
Ireland 54.1/100 +0.0
Positive
Ireland's JCI holds at 54.1/100; outlook remains Positive.
Indonesia 53.6/100 +0.0
Stable
Indonesia's JCI holds at 53.6/100; outlook remains Stable.
South Africa 52.3/100 +0.0
Negative
South Africa's JCI holds at 52.3/100; outlook remains Negative.
Brazil 50.9/100 +0.0
Positive
Brazil's JCI holds at 50.9/100; outlook remains Positive.
Argentina 50.7/100 +0.0
Positive
Argentina's JCI holds at 50.7/100; outlook remains Positive.
Poland 50.7/100 +0.0
Positive
Poland's JCI holds at 50.7/100; outlook remains Positive.
Netherlands 50.3/100 +0.0
Negative
Netherlands's JCI holds at 50.3/100; outlook remains Negative.
South Korea 49/100 +0.0
Stable
South Korea's JCI holds at 49/100; outlook remains Stable.
US — Utah (Rocky Mountain Power / PacifiCorp, WECC — non-RTO) 46.9/100
New rating
Negative
US — Utah (Rocky Mountain Power / PacifiCorp, WECC — non-RTO) enters the Jurisdiction Index at JCI 46.9/100 (Tier 3 — Contested) with a Negative outlook.
US — Maryland (BGE / Pepco / Delmarva Power / Potomac Edison — PJM) 35.3/100
New rating
Negative
US — Maryland (BGE / Pepco / Delmarva Power / Potomac Edison — PJM) enters the Jurisdiction Index at JCI 35.3/100 (Tier 4 — Constrained) with a Negative outlook.

Project Risk Scores

Project
Jurisdiction
Health
Change
What happened
Google Council Bluffs Data Center US — Iowa (MISO) 55/100 -8.5 Google Council Bluffs Data Center's overall health score moved from 63.5 to 55 (-8.5 points).
Meta Rosemount Data Center US — Minnesota (Xcel / MISO) 51/100 -2.5 Meta Rosemount Data Center's overall health score moved from 53.5 to 51 (-2.5 points).
Project Aggie (College Station) US — Texas (ERCOT) 10/100 +0.0 Project Aggie (College Station)'s overall health score holds at 10/100.
Prince William Digital Gateway (QTS / Compass) US — Virginia (PJM/Dominion) 10/100 +0.0 Prince William Digital Gateway (QTS / Compass)'s overall health score holds at 10/100.
AWS Calvert Technology Center (Calvert Cliffs) US — Maryland (BGE / Pepco / Delmarva Power / Potomac Edison — PJM) 10/100 +0.0 AWS Calvert Technology Center (Calvert Cliffs)'s overall health score holds at 10/100.
Google Project Skyway (Pine Island, MN) US — Minnesota (Xcel / MISO) 35/100 +0.0 Google Project Skyway (Pine Island, MN)'s overall health score holds at 35/100.
Poolside Project Horizon US — Texas (ERCOT) 35/100 +0.0 Poolside Project Horizon's overall health score holds at 35/100.
Project Gravity (Archbald / Gouldsboro Data Center Campus) US — Pennsylvania (PJM) 35/100 +0.0 Project Gravity (Archbald / Gouldsboro Data Center Campus)'s overall health score holds at 35/100.
Amazon Becker Data Center (Sherco Site) US — Minnesota (Xcel / MISO) 35/100 +0.0 Amazon Becker Data Center (Sherco Site)'s overall health score holds at 35/100.
Google Grange Castle Phase 3 (planning refused) Ireland 35/100 +0.0 Google Grange Castle Phase 3 (planning refused)'s overall health score holds at 35/100.
AWS Desper Creek Technology Campus (Louisa County) US — Virginia (PJM/Dominion) 47/100 +0.0 AWS Desper Creek Technology Campus (Louisa County)'s overall health score holds at 47/100.
Amazon Devlin Technology Park (Bristow) US — Virginia (PJM/Dominion) 47/100 +0.0 Amazon Devlin Technology Park (Bristow)'s overall health score holds at 47/100.
Microsoft Southeast Asia 3 Region (Johor Bahru) Malaysia — Johor (Johor-Singapore SEZ) 47.5/100 +0.0 Microsoft Southeast Asia 3 Region (Johor Bahru)'s overall health score holds at 47.5/100.
NEXTDC S7 Eastern Creek (OpenAI Stargate Australia) Australia 47.5/100 +0.0 NEXTDC S7 Eastern Creek (OpenAI Stargate Australia)'s overall health score holds at 47.5/100.
Nscale AI Campus Loughton (Microsoft anchor / Stargate UK) United Kingdom 47.5/100 +0.0 Nscale AI Campus Loughton (Microsoft anchor / Stargate UK)'s overall health score holds at 47.5/100.
Stargate Argentina (Patagonia) Argentina 47.5/100 +0.0 Stargate Argentina (Patagonia)'s overall health score holds at 47.5/100.
Stargate UAE (Abu Dhabi) United Arab Emirates 47.5/100 +0.0 Stargate UAE (Abu Dhabi)'s overall health score holds at 47.5/100.
CDC Marsden Park Campus (Sydney) + 555MW US Hyperscaler Contract Australia 48/100 +0.0 CDC Marsden Park Campus (Sydney) + 555MW US Hyperscaler Contract's overall health score holds at 48/100.
AirTrunk SYD3 (Western Sydney) Australia 50.5/100 +0.0 AirTrunk SYD3 (Western Sydney)'s overall health score holds at 50.5/100.
DataBank Culpeper Campus (IAD5/IAD6) US — Virginia (PJM/Dominion) 50.5/100 +0.0 DataBank Culpeper Campus (IAD5/IAD6)'s overall health score holds at 50.5/100.
Talen Energy - AWS Susquehanna PPA US — Rest of US (composite) 50.5/100 +0.0 Talen Energy - AWS Susquehanna PPA's overall health score holds at 50.5/100.
AREP PowerHouse Grand Prairie US — Texas (ERCOT) 51/100 +0.0 AREP PowerHouse Grand Prairie's overall health score holds at 51/100.
CloudBurst Data Center (New Braunfels) US — Texas (ERCOT) 51/100 +0.0 CloudBurst Data Center (New Braunfels)'s overall health score holds at 51/100.
Cologix Johnstown AI-Ready Campus US — Ohio (AEP Ohio / PJM) 51/100 +0.0 Cologix Johnstown AI-Ready Campus's overall health score holds at 51/100.
CoreWeave Lancaster AI Data Center Campus US — Pennsylvania (PJM) 51/100 +0.0 CoreWeave Lancaster AI Data Center Campus's overall health score holds at 51/100.
Energy Capital Partners / Calpine York 2 Data Center US — Pennsylvania (PJM) 51/100 +0.0 Energy Capital Partners / Calpine York 2 Data Center's overall health score holds at 51/100.
EdgeCore Culpeper Campus US — Virginia (PJM/Dominion) 51/100 +0.0 EdgeCore Culpeper Campus's overall health score holds at 51/100.
Google New Albany Campus (Montauk Innovations) US — Ohio (AEP Ohio / PJM) 51/100 +0.0 Google New Albany Campus (Montauk Innovations)'s overall health score holds at 51/100.
Microsoft Granger Data Center (St. Joe Farms) US — Indiana (MISO) 51/100 +0.0 Microsoft Granger Data Center (St. Joe Farms)'s overall health score holds at 51/100.
Microsoft Middenmeer Deelgebied B1 (AMS-E expansion) Netherlands 51/100 +0.0 Microsoft Middenmeer Deelgebied B1 (AMS-E expansion)'s overall health score holds at 51/100.
Microsoft New Albany Data Centers US — Ohio (AEP Ohio / PJM) 51/100 +0.0 Microsoft New Albany Data Centers's overall health score holds at 51/100.
Novva Data Centers Mesa US — Arizona (APS/SRP) 51/100 +0.0 Novva Data Centers Mesa's overall health score holds at 51/100.
Pennsylvania Digital I (PAX) - Carlisle Hyperscale Campus US — Pennsylvania (PJM) 51/100 +0.0 Pennsylvania Digital I (PAX) - Carlisle Hyperscale Campus's overall health score holds at 51/100.
Plan Nuclear Argentino - Nuclear-Powered AI Data Center Hub (Nuclear City) Argentina 51/100 +0.0 Plan Nuclear Argentino - Nuclear-Powered AI Data Center Hub (Nuclear City)'s overall health score holds at 51/100.
Rowan Cinco Data Center Campus (Medina County) US — Texas (ERCOT) 51/100 +0.0 Rowan Cinco Data Center Campus (Medina County)'s overall health score holds at 51/100.
TECfusions Keystone Connect (Upper Burrell) US — Pennsylvania (PJM) 51/100 +0.0 TECfusions Keystone Connect (Upper Burrell)'s overall health score holds at 51/100.
Tract Caldwell County Technology Park US — Texas (ERCOT) 51/100 +0.0 Tract Caldwell County Technology Park's overall health score holds at 51/100.
Microsoft AMS13/AMS14 (Middenmeer, Hollands Kroon) Netherlands 51/100 +0.0 Microsoft AMS13/AMS14 (Middenmeer, Hollands Kroon)'s overall health score holds at 51/100.
Microsoft Grange Castle Campus (DUB14/DUB15) Ireland 51/100 +0.0 Microsoft Grange Castle Campus (DUB14/DUB15)'s overall health score holds at 51/100.
SoftBank Sakai AI Data Center (ex-Sharp LCD plant) Japan 51/100 +0.0 SoftBank Sakai AI Data Center (ex-Sharp LCD plant)'s overall health score holds at 51/100.
Aligned IAD-02 (Ashburn) US — Virginia (PJM/Dominion) 51.8/100 +0.0 Aligned IAD-02 (Ashburn)'s overall health score holds at 51.8/100.
Equinix SG6 (Singapore) Singapore 51.8/100 +0.0 Equinix SG6 (Singapore)'s overall health score holds at 51.8/100.
Novva West Jordan Campus US — Utah (Rocky Mountain Power / PacifiCorp, WECC — non-RTO) 51.8/100 +0.0 Novva West Jordan Campus's overall health score holds at 51.8/100.
Rowan Bauxite II (Quantum Frederick) US — Maryland (BGE / Pepco / Delmarva Power / Potomac Edison — PJM) 51.8/100 +0.0 Rowan Bauxite II (Quantum Frederick)'s overall health score holds at 51.8/100.
Crane Clean Energy Center US — Pennsylvania (PJM) 51.9/100 +0.0 Crane Clean Energy Center's overall health score holds at 51.9/100.
Telecom Argentina Edge AI Data Center Conversion Program Argentina 51.9/100 +0.0 Telecom Argentina Edge AI Data Center Conversion Program's overall health score holds at 51.9/100.
Apple Maiden Data Center US — North Carolina (Duke Energy) 52/100 +0.0 Apple Maiden Data Center's overall health score holds at 52/100.
Meta Sarpy Data Center (Papillion/Springfield) US — Nebraska (OPPD / NPPD / LES, 100% consumer-owned public power; SPP) 52/100 +0.0 Meta Sarpy Data Center (Papillion/Springfield)'s overall health score holds at 52/100.
xAI Colossus 1 (Memphis) US — Tennessee (TVA federal power / MLGW & local distributors; non-RTO) 52/100 +0.0 xAI Colossus 1 (Memphis)'s overall health score holds at 52/100.
CyrusOne New Albany COL-1 US — Ohio (AEP Ohio / PJM) 52.8/100 +0.0 CyrusOne New Albany COL-1's overall health score holds at 52.8/100.
Stargate New Mexico - Project Jupiter (Dona Ana County) US — Rest of US (composite) 52.8/100 +0.0 Stargate New Mexico - Project Jupiter (Dona Ana County)'s overall health score holds at 52.8/100.
Vantage Pittsboro Campus US — Indiana (MISO) 53.2/100 +0.0 Vantage Pittsboro Campus's overall health score holds at 53.2/100.
CyrusOne Whitney Campus (DFW10 series, Bosque County) US — Texas (ERCOT) 53.5/100 +0.0 CyrusOne Whitney Campus (DFW10 series, Bosque County)'s overall health score holds at 53.5/100.
DataBank Lithia Springs Campus (ATL5/ATL6) US — Georgia (Southern/Georgia Power) 53.5/100 +0.0 DataBank Lithia Springs Campus (ATL5/ATL6)'s overall health score holds at 53.5/100.
DC BLOX Atlanta West US — Georgia (Southern/Georgia Power) 53.5/100 +0.0 DC BLOX Atlanta West's overall health score holds at 53.5/100.
EdgeConneX New Albany Campus US — Ohio (AEP Ohio / PJM) 53.5/100 +0.0 EdgeConneX New Albany Campus's overall health score holds at 53.5/100.
Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico) US — Virginia (PJM/Dominion) 53.5/100 +0.0 Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico)'s overall health score holds at 53.5/100.
Microsoft Mount Pleasant Data Center Campus US — Wisconsin (MISO) 53.5/100 +0.0 Microsoft Mount Pleasant Data Center Campus's overall health score holds at 53.5/100.
PowerHouse 95 (Spotsylvania) US — Virginia (PJM/Dominion) 53.5/100 +0.0 PowerHouse 95 (Spotsylvania)'s overall health score holds at 53.5/100.
SK Group + AWS Ulsan AI Data Center South Korea 53.5/100 +0.0 SK Group + AWS Ulsan AI Data Center's overall health score holds at 53.5/100.
Vantage Data Centers OH1 (New Albany) US — Ohio (AEP Ohio / PJM) 53.5/100 +0.0 Vantage Data Centers OH1 (New Albany)'s overall health score holds at 53.5/100.
Google Lincoln Data Center (Agate) US — Nebraska (OPPD / NPPD / LES, 100% consumer-owned public power; SPP) 53.5/100 +0.0 Google Lincoln Data Center (Agate)'s overall health score holds at 53.5/100.
Vantage Data Centers DUB1 (Profile Park, Dublin) Ireland 53.5/100 +0.0 Vantage Data Centers DUB1 (Profile Park, Dublin)'s overall health score holds at 53.5/100.
Bridge Data Centres MY07 (Ulu Tiram) Malaysia — Johor (Johor-Singapore SEZ) 53.6/100 +0.0 Bridge Data Centres MY07 (Ulu Tiram)'s overall health score holds at 53.6/100.
Meta Prometheus (New Albany) US — Rest of US (composite) 53.8/100 +0.0 Meta Prometheus (New Albany)'s overall health score holds at 53.8/100.
Crusoe / Lancium Abilene AI Campus (Stargate) US — Texas (ERCOT) 54/100 +0.0 Crusoe / Lancium Abilene AI Campus (Stargate)'s overall health score holds at 54/100.
Microsoft Boydton Campus US — Virginia (PJM/Dominion) 54/100 +0.0 Microsoft Boydton Campus's overall health score holds at 54/100.
NTT VA6 (Ashburn) US — Virginia (PJM/Dominion) 54/100 +0.0 NTT VA6 (Ashburn)'s overall health score holds at 54/100.
Eneus Energy Cameron County data center US — Texas (ERCOT) 54.3/100 +0.0 Eneus Energy Cameron County data center's overall health score holds at 54.3/100.
Meta Mesa Data Center US — Arizona (APS/SRP) 54.5/100 +0.0 Meta Mesa Data Center's overall health score holds at 54.5/100.
Google Mesa Data Center US — Arizona (APS/SRP) 55/100 +0.0 Google Mesa Data Center's overall health score holds at 55/100.
Meta Altoona Data Center US — Iowa (MISO) 55/100 +0.0 Meta Altoona Data Center's overall health score holds at 55/100.
Meta Temple Data Center US — Texas (ERCOT) 55/100 +0.0 Meta Temple Data Center's overall health score holds at 55/100.
AWS Hilliard Third Campus (Scioto Darby Road) US — Ohio (AEP Ohio / PJM) 55.1/100 +0.0 AWS Hilliard Third Campus (Scioto Darby Road)'s overall health score holds at 55.1/100.
Meta Jeffersonville Data Center US — Indiana (MISO) 55.3/100 +0.0 Meta Jeffersonville Data Center's overall health score holds at 55.3/100.
MSB Global Services Matrix Data Center Campus US — Texas (ERCOT) 55.3/100 +0.0 MSB Global Services Matrix Data Center Campus's overall health score holds at 55.3/100.
AWS New Albany Data Center Campus US — Ohio (AEP Ohio / PJM) 56/100 +0.0 AWS New Albany Data Center Campus's overall health score holds at 56/100.
QTS Fayetteville Campus (Project Excalibur) US — Georgia (Southern/Georgia Power) 56/100 +0.0 QTS Fayetteville Campus (Project Excalibur)'s overall health score holds at 56/100.
Microsoft Project Rita (Tyrone) US — Georgia (Southern/Georgia Power) 56.2/100 +0.0 Microsoft Project Rita (Tyrone)'s overall health score holds at 56.2/100.
Google Waltham Cross Data Centre United Kingdom 56.5/100 +0.0 Google Waltham Cross Data Centre's overall health score holds at 56.5/100.
NTT Grove at Gainesville Campus (VA10-VA13) US — Virginia (PJM/Dominion) 56.5/100 +0.0 NTT Grove at Gainesville Campus (VA10-VA13)'s overall health score holds at 56.5/100.
Blackstone QTS Cambois Campus (Blyth) United Kingdom 57.1/100 +0.0 Blackstone QTS Cambois Campus (Blyth)'s overall health score holds at 57.1/100.
AirTrunk Osaka Campus (OSK1 + OSK2) Japan 57.3/100 +0.0 AirTrunk Osaka Campus (OSK1 + OSK2)'s overall health score holds at 57.3/100.
Google Midlothian Campus - Building 5 (Sharka) US — Texas (ERCOT) 57.3/100 +0.0 Google Midlothian Campus - Building 5 (Sharka)'s overall health score holds at 57.3/100.
Google Hanau Data Center Germany 57.5/100 +0.0 Google Hanau Data Center's overall health score holds at 57.5/100.
Google Clarksville Data Center US — Tennessee (TVA federal power / MLGW & local distributors; non-RTO) 57.5/100 +0.0 Google Clarksville Data Center's overall health score holds at 57.5/100.
Digital Edge SEL2 (Incheon) South Korea 58/100 +0.0 Digital Edge SEL2 (Incheon)'s overall health score holds at 58/100.
Edged Atlanta ATL01 Campus (Tilford Yard) US — Georgia (Southern/Georgia Power) 58/100 +0.0 Edged Atlanta ATL01 Campus (Tilford Yard)'s overall health score holds at 58/100.
Empyrion KR1 Gangnam (Seoul) South Korea 58/100 +0.0 Empyrion KR1 Gangnam (Seoul)'s overall health score holds at 58/100.
Microsoft West Des Moines Data Centers US — Iowa (MISO) 58/100 +0.0 Microsoft West Des Moines Data Centers's overall health score holds at 58/100.
NEXTDC S3 (Sydney) Australia 58/100 +0.0 NEXTDC S3 (Sydney)'s overall health score holds at 58/100.
AirTrunk TOK1 (Inzai, Tokyo East) Japan 58/100 +0.0 AirTrunk TOK1 (Inzai, Tokyo East)'s overall health score holds at 58/100.
AirTrunk TOK2 (Koto, Tokyo West) Japan 58/100 +0.0 AirTrunk TOK2 (Koto, Tokyo West)'s overall health score holds at 58/100.
Bridge Data Centres MY06 (Sedenak) Malaysia — Johor (Johor-Singapore SEZ) 58/100 +0.0 Bridge Data Centres MY06 (Sedenak)'s overall health score holds at 58/100.
GDS / DayOne Nusajaya Tech Park Campus Malaysia — Johor (Johor-Singapore SEZ) 58/100 +0.0 GDS / DayOne Nusajaya Tech Park Campus's overall health score holds at 58/100.
Meta Gallatin Data Center US — Tennessee (TVA federal power / MLGW & local distributors; non-RTO) 58/100 +0.0 Meta Gallatin Data Center's overall health score holds at 58/100.
Princeton Digital Group JH1 (Sedenak Tech Park) Malaysia — Johor (Johor-Singapore SEZ) 58/100 +0.0 Princeton Digital Group JH1 (Sedenak Tech Park)'s overall health score holds at 58/100.
Security Land and Development Woodlawn Data Center US — Maryland (BGE / Pepco / Delmarva Power / Potomac Edison — PJM) 58/100 +0.0 Security Land and Development Woodlawn Data Center's overall health score holds at 58/100.
EdgeCore Mesa (Greater Phoenix) US — Arizona (APS/SRP) 58.3/100 +0.0 EdgeCore Mesa (Greater Phoenix)'s overall health score holds at 58.3/100.
Nexus Data Center (Hubbard) US — Texas (ERCOT) 58.5/100 +0.0 Nexus Data Center (Hubbard)'s overall health score holds at 58.5/100.
Amazon / STACK Infrastructure Caddo-Bossier Data Center Campuses US — Louisiana (Entergy Louisiana / SWEPCO / Cleco — MISO South, LRZ 9; regulator: Louisiana Public Service Commission) 58.5/100 +0.0 Amazon / STACK Infrastructure Caddo-Bossier Data Center Campuses's overall health score holds at 58.5/100.
Google Winschoten Data Center (Groningen) Netherlands 58.5/100 +0.0 Google Winschoten Data Center (Groningen)'s overall health score holds at 58.5/100.
TeraWulf Chesapeake Data Campus (Morgantown) US — Maryland (BGE / Pepco / Delmarva Power / Potomac Edison — PJM) 58.5/100 +0.0 TeraWulf Chesapeake Data Campus (Morgantown)'s overall health score holds at 58.5/100.
YTL Green Data Center Park (Kulai) Malaysia — Johor (Johor-Singapore SEZ) 58.5/100 +0.0 YTL Green Data Center Park (Kulai)'s overall health score holds at 58.5/100.
Amazon / AWS Falls Township Data Center (Keystone Trade Center) US — Pennsylvania (PJM) 59/100 +0.0 Amazon / AWS Falls Township Data Center (Keystone Trade Center)'s overall health score holds at 59/100.
Amazon / AWS Salem Township Data Center Campus (Susquehanna) US — Pennsylvania (PJM) 59/100 +0.0 Amazon / AWS Salem Township Data Center Campus (Susquehanna)'s overall health score holds at 59/100.
Google Fort Wayne Data Center US — Indiana (MISO) 59/100 +0.0 Google Fort Wayne Data Center's overall health score holds at 59/100.
Google / Intersect Meitner Energy Center (Texas Panhandle) US — Texas (ERCOT) 59/100 +0.0 Google / Intersect Meitner Energy Center (Texas Panhandle)'s overall health score holds at 59/100.
Meta Lebanon Data Center Campus (LEAP District) US — Indiana (MISO) 59/100 +0.0 Meta Lebanon Data Center Campus (LEAP District)'s overall health score holds at 59/100.
Microsoft Palmetto Data Center US — Georgia (Southern/Georgia Power) 59/100 +0.0 Microsoft Palmetto Data Center's overall health score holds at 59/100.
Rowan Project Temple (Bell County) US — Texas (ERCOT) 59/100 +0.0 Rowan Project Temple (Bell County)'s overall health score holds at 59/100.
Aligned Data Centers IAD-06 (Quantum Frederick) US — Maryland (BGE / Pepco / Delmarva Power / Potomac Edison — PJM) 59/100 +0.0 Aligned Data Centers IAD-06 (Quantum Frederick)'s overall health score holds at 59/100.
Hut 8 River Bend Data Center Campus US — Louisiana (Entergy Louisiana / SWEPCO / Cleco — MISO South, LRZ 9; regulator: Louisiana Public Service Commission) 59/100 +0.0 Hut 8 River Bend Data Center Campus's overall health score holds at 59/100.
Quantum Frederick Park (master campus) US — Maryland (BGE / Pepco / Delmarva Power / Potomac Edison — PJM) 59/100 +0.0 Quantum Frederick Park (master campus)'s overall health score holds at 59/100.
Schwarz Digits Datacenter Lübbenau Germany 59/100 +0.0 Schwarz Digits Datacenter Lübbenau's overall health score holds at 59/100.
Google Douglas County Data Center US — Georgia (Southern/Georgia Power) 59.5/100 +0.0 Google Douglas County Data Center's overall health score holds at 59.5/100.
Google Lenoir Data Center US — North Carolina (Duke Energy) 59.5/100 +0.0 Google Lenoir Data Center's overall health score holds at 59.5/100.
Rowan Bauxite I (Quantum Frederick) US — Maryland (BGE / Pepco / Delmarva Power / Potomac Edison — PJM) 59.5/100 +0.0 Rowan Bauxite I (Quantum Frederick)'s overall health score holds at 59.5/100.
Google Goodnight Campus (Armstrong County, TX) US — Texas (ERCOT) 59.6/100 +0.0 Google Goodnight Campus (Armstrong County, TX)'s overall health score holds at 59.6/100.
Google Tussenweg / Green Box Computing (Hollands Kroon) Netherlands 60/100 +0.0 Google Tussenweg / Green Box Computing (Hollands Kroon)'s overall health score holds at 60/100.
Meta (Facebook) Forest City Data Center US — North Carolina (Duke Energy) 60/100 +0.0 Meta (Facebook) Forest City Data Center's overall health score holds at 60/100.
Crusoe Callaway County Missouri data center US — Rest of US (composite) 60.5/100 +0.0 Crusoe Callaway County Missouri data center's overall health score holds at 60.5/100.
Google Chesterfield Data Center Campus (Project Peanut) US — Virginia (PJM/Dominion) 60.5/100 +0.0 Google Chesterfield Data Center Campus (Project Peanut)'s overall health score holds at 60.5/100.
Joliet data center campus US — Rest of US (composite) 60.5/100 +0.0 Joliet data center campus's overall health score holds at 60.5/100.
Microsoft Pecos data center campus US — Rest of US (composite) 60.5/100 +0.0 Microsoft Pecos data center campus's overall health score holds at 60.5/100.
QTS Salem Township Campus US — Pennsylvania (PJM) 60.5/100 +0.0 QTS Salem Township Campus's overall health score holds at 60.5/100.
Stratos Project US — Rest of US (composite) 60.5/100 +0.0 Stratos Project's overall health score holds at 60.5/100.
T5 @ Atlanta IV (Palmetto) US — Georgia (Southern/Georgia Power) 60.5/100 +0.0 T5 @ Atlanta IV (Palmetto)'s overall health score holds at 60.5/100.
Wheatfield data center and gas plant US — Rest of US (composite) 60.5/100 +0.0 Wheatfield data center and gas plant's overall health score holds at 60.5/100.
Yorkville data center campus US — Rest of US (composite) 60.5/100 +0.0 Yorkville data center campus's overall health score holds at 60.5/100.
Atmosphere Data Centers Dickerson Campus US — Maryland (BGE / Pepco / Delmarva Power / Potomac Edison — PJM) 60.5/100 +0.0 Atmosphere Data Centers Dickerson Campus's overall health score holds at 60.5/100.
DC BLOX Atlanta East (Rockdale County) US — Georgia (Southern/Georgia Power) 60.8/100 +0.0 DC BLOX Atlanta East (Rockdale County)'s overall health score holds at 60.8/100.
Crusoe / Blue Energy Data Center (Victoria, TX) US — Texas (ERCOT) 61/100 +0.0 Crusoe / Blue Energy Data Center (Victoria, TX)'s overall health score holds at 61/100.
T5 @ Charlotte II (Kings Mountain) US — North Carolina (Duke Energy) 61/100 +0.0 T5 @ Charlotte II (Kings Mountain)'s overall health score holds at 61/100.
Tract Farmington Technology Park US — Minnesota (Xcel / MISO) 61.2/100 +0.0 Tract Farmington Technology Park's overall health score holds at 61.2/100.
Switch The Keep Campus (Douglas County) US — Georgia (Southern/Georgia Power) 61.5/100 +0.0 Switch The Keep Campus (Douglas County)'s overall health score holds at 61.5/100.
Vantage Data Centers Ashburn I (VA1) US — Virginia (PJM/Dominion) 61.5/100 +0.0 Vantage Data Centers Ashburn I (VA1)'s overall health score holds at 61.5/100.
Meta Eagle Mountain Campus US — Utah (Rocky Mountain Power / PacifiCorp, WECC — non-RTO) 61.5/100 +0.0 Meta Eagle Mountain Campus's overall health score holds at 61.5/100.
Meta Henrico Data Center (White Oak Technology Park) US — Virginia (PJM/Dominion) 62/100 +0.0 Meta Henrico Data Center (White Oak Technology Park)'s overall health score holds at 62/100.
Stack Infrastructure Berry Hill Megasite (Pittsylvania) US — Virginia (PJM/Dominion) 62.5/100 +0.0 Stack Infrastructure Berry Hill Megasite (Pittsylvania)'s overall health score holds at 62.5/100.
Comanche Circle US — Rest of US (composite) 63/100 +0.0 Comanche Circle's overall health score holds at 63/100.
CyrusOne Project Peach (Coweta County) US — Georgia (Southern/Georgia Power) 63/100 +0.0 CyrusOne Project Peach (Coweta County)'s overall health score holds at 63/100.
Microsoft Fairwater Atlanta US — Georgia (Southern/Georgia Power) 63/100 +0.0 Microsoft Fairwater Atlanta's overall health score holds at 63/100.
Prologis Project Sail (Coweta County) US — Georgia (Southern/Georgia Power) 63/100 +0.0 Prologis Project Sail (Coweta County)'s overall health score holds at 63/100.
Prologis Shelbyville Data Center Campus US — Indiana (MISO) 63/100 +0.0 Prologis Shelbyville Data Center Campus's overall health score holds at 63/100.
QTS White Oak Expansion (RIC4/RIC5, Henrico) US — Virginia (PJM/Dominion) 63/100 +0.0 QTS White Oak Expansion (RIC4/RIC5, Henrico)'s overall health score holds at 63/100.
Shippingport / Bruce Mansfield Data Center (Project Phoenix) US — Pennsylvania (PJM) 63.7/100 +0.0 Shippingport / Bruce Mansfield Data Center (Project Phoenix)'s overall health score holds at 63.7/100.
Cirion BUE1 Buenos Aires Expansion Argentina 64/100 +0.0 Cirion BUE1 Buenos Aires Expansion's overall health score holds at 64/100.
GW Ranch (Pacifico Energy) US — Texas (ERCOT) 64/100 +0.0 GW Ranch (Pacifico Energy)'s overall health score holds at 64/100.
Metrobloks IND-A1 (Indianapolis) US — Indiana (MISO) 64.9/100 +0.0 Metrobloks IND-A1 (Indianapolis)'s overall health score holds at 64.9/100.
Robena Mine Data Center (Project Hummingbird) US — Pennsylvania (PJM) 64.9/100 +0.0 Robena Mine Data Center (Project Hummingbird)'s overall health score holds at 64.9/100.
Project Comal US — Texas (ERCOT) 65.9/100 +0.0 Project Comal's overall health score holds at 65.9/100.
Compass Datacenters Goodyear US — Arizona (APS/SRP) 66/100 +0.0 Compass Datacenters Goodyear's overall health score holds at 66/100.
DataBank Red Oak Campus (South Dallas) US — Texas (ERCOT) 66/100 +0.0 DataBank Red Oak Campus (South Dallas)'s overall health score holds at 66/100.
SB Energy AI Campus (Pike County, Ohio) US — Rest of US (composite) 66/100 +0.0 SB Energy AI Campus (Pike County, Ohio)'s overall health score holds at 66/100.
Skybox / Prologis PowerCampus Austin (Hutto) US — Texas (ERCOT) 66/100 +0.0 Skybox / Prologis PowerCampus Austin (Hutto)'s overall health score holds at 66/100.
Vantage Data Centers AZ1 (Goodyear) US — Arizona (APS/SRP) 66/100 +0.0 Vantage Data Centers AZ1 (Goodyear)'s overall health score holds at 66/100.
Vantage JHB1 (ex-Yondr) Sedenak Campus Malaysia — Johor (Johor-Singapore SEZ) 66/100 +0.0 Vantage JHB1 (ex-Yondr) Sedenak Campus's overall health score holds at 66/100.
Meta El Paso Data Center US — Texas (ERCOT) 66.3/100 +0.0 Meta El Paso Data Center's overall health score holds at 66.3/100.
Aligned Project Caprock (Hale County) US — Texas (ERCOT) 67.8/100 +0.0 Aligned Project Caprock (Hale County)'s overall health score holds at 67.8/100.
Google Project Pegasus (LaGrange) US — Georgia (Southern/Georgia Power) 67.8/100 +0.0 Google Project Pegasus (LaGrange)'s overall health score holds at 67.8/100.
Khazna QAJ1 Ajman AI Data Center United Arab Emirates 67.8/100 +0.0 Khazna QAJ1 Ajman AI Data Center's overall health score holds at 67.8/100.
Applied Digital Delta Forge 1 (Rapides Parish) US — Louisiana (Entergy Louisiana / SWEPCO / Cleco — MISO South, LRZ 9; regulator: Louisiana Public Service Commission) 67.8/100 +0.0 Applied Digital Delta Forge 1 (Rapides Parish)'s overall health score holds at 67.8/100.
Microsoft NRW Cluster (Bergheim / Bedburg) Germany 67.8/100 +0.0 Microsoft NRW Cluster (Bergheim / Bedburg)'s overall health score holds at 67.8/100.
SoftBank France AI Data Center Program (Hauts-de-France) France 68/100 +0.0 SoftBank France AI Data Center Program (Hauts-de-France)'s overall health score holds at 68/100.
AWS Susquehanna Nuclear Data Center Campus US — Rest of US (composite) 68.3/100 +0.0 AWS Susquehanna Nuclear Data Center Campus's overall health score holds at 68.3/100.
ARSAT Benavidez Data Center Hall IV Expansion Argentina 69/100 +0.0 ARSAT Benavidez Data Center Hall IV Expansion's overall health score holds at 69/100.
du-Microsoft Hyperscale Data Center (Dubai) United Arab Emirates 69/100 +0.0 du-Microsoft Hyperscale Data Center (Dubai)'s overall health score holds at 69/100.
Google Haskell County Data Centers US — Texas (ERCOT) 69/100 +0.0 Google Haskell County Data Centers's overall health score holds at 69/100.
Iron Mountain VA-1 (Manassas) US — Virginia (PJM/Dominion) 69.5/100 +0.0 Iron Mountain VA-1 (Manassas)'s overall health score holds at 69.5/100.
NEXTDC M3 (West Footscray, Melbourne) Australia 69.5/100 +0.0 NEXTDC M3 (West Footscray, Melbourne)'s overall health score holds at 69.5/100.
QTS Ashburn 1 (ASH1) US — Virginia (PJM/Dominion) 69.5/100 +0.0 QTS Ashburn 1 (ASH1)'s overall health score holds at 69.5/100.
QTS Atlanta Metro DC1 US — Georgia (Southern/Georgia Power) 69.5/100 +0.0 QTS Atlanta Metro DC1's overall health score holds at 69.5/100.
Stack Infrastructure NVA02 (Manassas) US — Virginia (PJM/Dominion) 69.5/100 +0.0 Stack Infrastructure NVA02 (Manassas)'s overall health score holds at 69.5/100.
Stargate Michigan - The Barn (Saline Township) US — Rest of US (composite) 69.5/100 +0.0 Stargate Michigan - The Barn (Saline Township)'s overall health score holds at 69.5/100.
Vantage Data Centers Frontier (Shackelford County / Stargate) US — Texas (ERCOT) 69.5/100 +0.0 Vantage Data Centers Frontier (Shackelford County / Stargate)'s overall health score holds at 69.5/100.
Aligned Salt Lake Metro Campus (SLC-01 to SLC-04) US — Utah (Rocky Mountain Power / PacifiCorp, WECC — non-RTO) 69.5/100 +0.0 Aligned Salt Lake Metro Campus (SLC-01 to SLC-04)'s overall health score holds at 69.5/100.
Google Papillion Data Center (Sarpy County) US — Nebraska (OPPD / NPPD / LES, 100% consumer-owned public power; SPP) 69.5/100 +0.0 Google Papillion Data Center (Sarpy County)'s overall health score holds at 69.5/100.
Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) United Arab Emirates 71.5/100 +0.0 Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna)'s overall health score holds at 71.5/100.
Homer City Energy Campus US — Rest of US (composite) 71.9/100 +0.0 Homer City Energy Campus's overall health score holds at 71.9/100.
Stargate Milam County (OpenAI / SB Energy) US — Texas (ERCOT) 72/100 +0.0 Stargate Milam County (OpenAI / SB Energy)'s overall health score holds at 72/100.
Meta Hyperion (Richland Parish) US — Rest of US (composite) 72.3/100 +0.0 Meta Hyperion (Richland Parish)'s overall health score holds at 72.3/100.
DC BLOX Henrico (Wilkinson Road) US — Virginia (PJM/Dominion) 72.5/100 +0.0 DC BLOX Henrico (Wilkinson Road)'s overall health score holds at 72.5/100.
Microsoft Fairwater (Mount Pleasant) US — Rest of US (composite) 73.3/100 +0.0 Microsoft Fairwater (Mount Pleasant)'s overall health score holds at 73.3/100.
Meta Stanton Springs / Newton Data Center US — Georgia (Southern/Georgia Power) 74/100 +0.0 Meta Stanton Springs / Newton Data Center's overall health score holds at 74/100.
Khazna AUH8 Masdar City AI Data Center United Arab Emirates 75.3/100 +0.0 Khazna AUH8 Masdar City AI Data Center's overall health score holds at 75.3/100.
Stargate Abilene (Crusoe campus) US — Texas (ERCOT) 75.8/100 +0.0 Stargate Abilene (Crusoe campus)'s overall health score holds at 75.8/100.
AWS Georgia Data Center Campuses (Butts & Douglas Counties) US — Georgia (Southern/Georgia Power) 76/100 +0.0 AWS Georgia Data Center Campuses (Butts & Douglas Counties)'s overall health score holds at 76/100.
AWS Project Rainier (New Carlisle) US — Rest of US (composite) 77/100 +0.0 AWS Project Rainier (New Carlisle)'s overall health score holds at 77/100.
Sweetwater 1 and 2 (IREN) US — Texas (ERCOT) 78.6/100 +0.0 Sweetwater 1 and 2 (IREN)'s overall health score holds at 78.6/100.
Fermi America Project Matador HyperGrid US — Texas (ERCOT) 80/100 +0.0 Fermi America Project Matador HyperGrid's overall health score holds at 80/100.
AWS Louisa County Campuses (Lake Anna Tech Campus) US — Virginia (PJM/Dominion) 80.3/100 +0.0 AWS Louisa County Campuses (Lake Anna Tech Campus)'s overall health score holds at 80.3/100.
Stargate Wisconsin - Vantage Lighthouse (Port Washington) US — Rest of US (composite) 82/100 +0.0 Stargate Wisconsin - Vantage Lighthouse (Port Washington)'s overall health score holds at 82/100.
xAI Colossus 2 (Memphis) US — Rest of US (composite) 82/100 +0.0 xAI Colossus 2 (Memphis)'s overall health score holds at 82/100.

New Projects Tracked

38 project(s) added, 2,526 MW of tracked capacity in total.

Notable Signals

Triaged source documents with relevance ≥ 0.7, dated in the window.

  • Meta's $1.2bn data center in Kuna, Idaho, goes live (Data Center Dynamics, Sep 4; relevance 0.95, E4 evidence).

    E4
    Relevance 0.95
    project_news
    capital
    Source: Data Center Dynamics

  • Fervo Energy and Google ink largest-ever geothermal PPA to power data centers (Power Engineering, Sep 2; relevance 0.95, E4 evidence).

    E4
    Relevance 0.95
    power
    capital
    project_news
    Source: Power Engineering

  • Google is buying nearly 400 megawatts of geothermal power from Fervo Energy for a Utah data center (Quartz, Sep 1; relevance 0.95, E4 evidence).

    E4
    Relevance 0.95
    power
    capital
    project_news
    Source: Quartz

  • TCS commits $7.4B to a one-gigawatt AI campus in Hyderabad (thenextweb.com, Sep 5; relevance 0.90, E4 evidence).

    E4
    Relevance 0.90
    project_news
    capital
    power
    Source: thenextweb.com

  • TCS Plans One-Gigawatt Capacity Data Center in Southern India (Bloomberg Technology, Sep 5; relevance 0.90, E4 evidence).

    E4
    Relevance 0.90
    project_news
    power
    Source: Bloomberg Technology

  • India's TCS unit to invest up to $7.4 billion in AI data center campus reut.rs/3UwPrtn (Reuters, Sep 5; relevance 0.90, E4 evidence).

    E4
    Relevance 0.90
    project_news
    capital
    Source: Reuters

  • Data center proposal approved by local council in suburb of Frankfurt, Germany (Data Center Dynamics, Sep 4; relevance 0.90, E4 evidence).

    E4
    Relevance 0.90
    project_news
    regulatory
    Source: Data Center Dynamics

  • Telxius to build Edge data center in Cancún, Mexico (Data Center Dynamics, Sep 4; relevance 0.90, E4 evidence).

    E4
    Relevance 0.90
    project_news
    Source: Data Center Dynamics

  • Evolution DC signs pre-lease for first phase of Bangkok data center to unnamed hyperscaler (Data Center Dynamics, Sep 4; relevance 0.90, E4 evidence).

    E4
    Relevance 0.90
    project_news
    Source: Data Center Dynamics

  • Ada Infrastructure breaks ground on latest Tokyo data center (Data Center Dynamics, Sep 3; relevance 0.90, E4 evidence).

    E4
    Relevance 0.90
    project_news
    Source: Data Center Dynamics

Milestone Events

No milestone events were recorded in this window.

Every figure in this brief is composed deterministically from append-only stored records (jurisdiction scores, project risk scores, milestones, triaged source documents) and carries its citation. Sources synced from the common.vision archive are named but not hyperlinked when no public URL is stored.