The Compute Observer
The Compute Observer — Week of August 10, 2026
The Compute Observer — published by Compute Institute
Covering – · Generated August 20, 2026 · Composed deterministically from stored, cited data — no generated prose · Methodology
The Compute Observer weekly intelligence brief for August 10–16, 2026. All 34 re-scored jurisdictions held their JCI rating and outlook. All 156 re-scored projects held their PRS rating. No new projects were added to the tracker this week. 10 high-relevance signals (relevance ≥ 0.7) were triaged, led by "Amazon Discloses Ownership of GW Ranch, Giant Texas Data Center-Gas Power Complex" (ENR - Power and Industrial). No milestone events were recorded this week.
Events This Week
No published impact events occurred in this window.
Jurisdiction Competitiveness Index
|
Jurisdiction
|
JCI
|
Change
|
Outlook
|
What happened
|
Citations
|
|---|---|---|---|---|---|
| Qatar | 77.4/100 | +0.0 | Qatar's JCI holds at 77.4/100; outlook remains Positive. | ||
| US — Iowa (MISO) | 76.5/100 | +0.0 | US — Iowa (MISO)'s JCI holds at 76.5/100; outlook remains Stable. | ||
| US — Indiana (MISO) | 72.4/100 | +0.0 | US — Indiana (MISO)'s JCI holds at 72.4/100; outlook remains Positive. | ||
| US — Texas (ERCOT) | 72.3/100 | +0.0 | US — Texas (ERCOT)'s JCI holds at 72.3/100; outlook remains Stable. | ||
| United Arab Emirates | 69.7/100 | +0.0 | United Arab Emirates's JCI holds at 69.7/100; outlook remains Positive. | ||
| US — Wisconsin (MISO) | 68.5/100 | +0.0 | US — Wisconsin (MISO)'s JCI holds at 68.5/100; outlook remains Positive. | ||
| US — Arizona (APS/SRP) | 67.2/100 | +0.0 | US — Arizona (APS/SRP)'s JCI holds at 67.2/100; outlook remains Stable. | ||
| US — Georgia (Southern/Georgia Power) | 67.2/100 | +0.0 | US — Georgia (Southern/Georgia Power)'s JCI holds at 67.2/100; outlook remains Stable. | ||
| Saudi Arabia | 65.2/100 | +0.0 | Saudi Arabia's JCI holds at 65.2/100; outlook remains Stable. | ||
| US — North Carolina (Duke Energy) | 63.4/100 | +0.0 | US — North Carolina (Duke Energy)'s JCI holds at 63.4/100; outlook remains Positive. | ||
| US — Rest of US (composite) | 63.4/100 | +0.0 | US — Rest of US (composite)'s JCI holds at 63.4/100; outlook remains Stable. | ||
| Sweden | 63.1/100 | +0.0 | Sweden's JCI holds at 63.1/100; outlook remains Positive. | ||
| Canada | 62.3/100 | +0.0 | Canada's JCI holds at 62.3/100; outlook remains Stable. | ||
| France | 62.3/100 | +0.0 | France's JCI holds at 62.3/100; outlook remains Stable. | ||
| Australia | 61.9/100 | +0.0 | Australia's JCI holds at 61.9/100; outlook remains Negative. | ||
| US — Virginia (PJM/Dominion) | 61.6/100 | +0.0 | US — Virginia (PJM/Dominion)'s JCI holds at 61.6/100; outlook remains Stable. | ||
| US — Ohio (AEP Ohio / PJM) | 61.2/100 | +0.0 | US — Ohio (AEP Ohio / PJM)'s JCI holds at 61.2/100; outlook remains Positive. | ||
| US — Pennsylvania (PJM) | 60.4/100 | +0.0 | US — Pennsylvania (PJM)'s JCI holds at 60.4/100; outlook remains Positive. | ||
| Denmark | 60.2/100 | +0.0 | Denmark's JCI holds at 60.2/100; outlook remains Negative. | ||
| US — Minnesota (Xcel / MISO) | 59.3/100 | +0.0 | US — Minnesota (Xcel / MISO)'s JCI holds at 59.3/100; outlook remains Stable. | ||
| Singapore | 59/100 | +0.0 | Singapore's JCI holds at 59/100; outlook remains Stable. | ||
| Malaysia — Johor (Johor-Singapore SEZ) | 58.9/100 | +0.0 | Malaysia — Johor (Johor-Singapore SEZ)'s JCI holds at 58.9/100; outlook remains Positive. | ||
| Japan | 58.6/100 | +0.0 | Japan's JCI holds at 58.6/100; outlook remains Stable. | ||
| United Kingdom | 57/100 | +0.0 | United Kingdom's JCI holds at 57/100; outlook remains Stable. | ||
| Germany | 56.7/100 | +0.0 | Germany's JCI holds at 56.7/100; outlook remains Positive. | ||
| India | 54.9/100 | +0.0 | India's JCI holds at 54.9/100; outlook remains Stable. | ||
| Ireland | 54.1/100 | +0.0 | Ireland's JCI holds at 54.1/100; outlook remains Positive. | ||
| Indonesia | 53.6/100 | +0.0 | Indonesia's JCI holds at 53.6/100; outlook remains Stable. | ||
| South Africa | 52.3/100 | +0.0 | South Africa's JCI holds at 52.3/100; outlook remains Negative. | ||
| Brazil | 50.9/100 | +0.0 | Brazil's JCI holds at 50.9/100; outlook remains Positive. | ||
| Argentina | 50.7/100 | +0.0 | Argentina's JCI holds at 50.7/100; outlook remains Positive. | ||
| Poland | 50.7/100 | +0.0 | Poland's JCI holds at 50.7/100; outlook remains Positive. | ||
| Netherlands | 50.3/100 | +0.0 | Netherlands's JCI holds at 50.3/100; outlook remains Negative. | ||
| South Korea | 49/100 | +0.0 | South Korea's JCI holds at 49/100; outlook remains Stable. |
Project Risk Scores
|
Project
|
Jurisdiction
|
Health
|
Change
|
What happened
|
|---|---|---|---|---|
| Project Aggie (College Station) | US — Texas (ERCOT) | 10/100 | +0.0 | Project Aggie (College Station)'s overall health score holds at 10/100. |
| Prince William Digital Gateway (QTS / Compass) | US — Virginia (PJM/Dominion) | 10/100 | +0.0 | Prince William Digital Gateway (QTS / Compass)'s overall health score holds at 10/100. |
| Google Project Skyway (Pine Island, MN) | US — Minnesota (Xcel / MISO) | 35/100 | +0.0 | Google Project Skyway (Pine Island, MN)'s overall health score holds at 35/100. |
| Poolside Project Horizon | US — Texas (ERCOT) | 35/100 | +0.0 | Poolside Project Horizon's overall health score holds at 35/100. |
| Project Gravity (Archbald / Gouldsboro Data Center Campus) | US — Pennsylvania (PJM) | 35/100 | +0.0 | Project Gravity (Archbald / Gouldsboro Data Center Campus)'s overall health score holds at 35/100. |
| AWS Desper Creek Technology Campus (Louisa County) | US — Virginia (PJM/Dominion) | 47/100 | +0.0 | AWS Desper Creek Technology Campus (Louisa County)'s overall health score holds at 47/100. |
| Amazon Devlin Technology Park (Bristow) | US — Virginia (PJM/Dominion) | 47/100 | +0.0 | Amazon Devlin Technology Park (Bristow)'s overall health score holds at 47/100. |
| Microsoft Southeast Asia 3 Region (Johor Bahru) | Malaysia — Johor (Johor-Singapore SEZ) | 47.5/100 | +0.0 | Microsoft Southeast Asia 3 Region (Johor Bahru)'s overall health score holds at 47.5/100. |
| Nscale AI Campus Loughton (Microsoft anchor / Stargate UK) | United Kingdom | 47.5/100 | +0.0 | Nscale AI Campus Loughton (Microsoft anchor / Stargate UK)'s overall health score holds at 47.5/100. |
| Stargate Argentina (Patagonia) | Argentina | 47.5/100 | +0.0 | Stargate Argentina (Patagonia)'s overall health score holds at 47.5/100. |
| Stargate UAE (Abu Dhabi) | United Arab Emirates | 47.5/100 | +0.0 | Stargate UAE (Abu Dhabi)'s overall health score holds at 47.5/100. |
| Crane Clean Energy Center | US — Pennsylvania (PJM) | 48.4/100 | +0.0 | Crane Clean Energy Center's overall health score holds at 48.4/100. |
| Telecom Argentina Edge AI Data Center Conversion Program | Argentina | 48.4/100 | +0.0 | Telecom Argentina Edge AI Data Center Conversion Program's overall health score holds at 48.4/100. |
| AirTrunk SYD3 (Western Sydney) | Australia | 50.5/100 | +0.0 | AirTrunk SYD3 (Western Sydney)'s overall health score holds at 50.5/100. |
| DataBank Culpeper Campus (IAD5/IAD6) | US — Virginia (PJM/Dominion) | 50.5/100 | +0.0 | DataBank Culpeper Campus (IAD5/IAD6)'s overall health score holds at 50.5/100. |
| Talen Energy - AWS Susquehanna PPA | US — Rest of US (composite) | 50.5/100 | +0.0 | Talen Energy - AWS Susquehanna PPA's overall health score holds at 50.5/100. |
| AREP PowerHouse Grand Prairie | US — Texas (ERCOT) | 51/100 | +0.0 | AREP PowerHouse Grand Prairie's overall health score holds at 51/100. |
| Cologix Johnstown AI-Ready Campus | US — Ohio (AEP Ohio / PJM) | 51/100 | +0.0 | Cologix Johnstown AI-Ready Campus's overall health score holds at 51/100. |
| CoreWeave Lancaster AI Data Center Campus | US — Pennsylvania (PJM) | 51/100 | +0.0 | CoreWeave Lancaster AI Data Center Campus's overall health score holds at 51/100. |
| Energy Capital Partners / Calpine York 2 Data Center | US — Pennsylvania (PJM) | 51/100 | +0.0 | Energy Capital Partners / Calpine York 2 Data Center's overall health score holds at 51/100. |
| EdgeCore Culpeper Campus | US — Virginia (PJM/Dominion) | 51/100 | +0.0 | EdgeCore Culpeper Campus's overall health score holds at 51/100. |
| Google New Albany Campus (Montauk Innovations) | US — Ohio (AEP Ohio / PJM) | 51/100 | +0.0 | Google New Albany Campus (Montauk Innovations)'s overall health score holds at 51/100. |
| Microsoft Granger Data Center (St. Joe Farms) | US — Indiana (MISO) | 51/100 | +0.0 | Microsoft Granger Data Center (St. Joe Farms)'s overall health score holds at 51/100. |
| Microsoft Middenmeer Deelgebied B1 (AMS-E expansion) | Netherlands | 51/100 | +0.0 | Microsoft Middenmeer Deelgebied B1 (AMS-E expansion)'s overall health score holds at 51/100. |
| Microsoft New Albany Data Centers | US — Ohio (AEP Ohio / PJM) | 51/100 | +0.0 | Microsoft New Albany Data Centers's overall health score holds at 51/100. |
| Novva Data Centers Mesa | US — Arizona (APS/SRP) | 51/100 | +0.0 | Novva Data Centers Mesa's overall health score holds at 51/100. |
| Pennsylvania Digital I (PAX) - Carlisle Hyperscale Campus | US — Pennsylvania (PJM) | 51/100 | +0.0 | Pennsylvania Digital I (PAX) - Carlisle Hyperscale Campus's overall health score holds at 51/100. |
| Plan Nuclear Argentino - Nuclear-Powered AI Data Center Hub (Nuclear City) | Argentina | 51/100 | +0.0 | Plan Nuclear Argentino - Nuclear-Powered AI Data Center Hub (Nuclear City)'s overall health score holds at 51/100. |
| Rowan Cinco Data Center Campus (Medina County) | US — Texas (ERCOT) | 51/100 | +0.0 | Rowan Cinco Data Center Campus (Medina County)'s overall health score holds at 51/100. |
| SK Group + AWS Ulsan AI Data Center | South Korea | 51/100 | +0.0 | SK Group + AWS Ulsan AI Data Center's overall health score holds at 51/100. |
| TECfusions Keystone Connect (Upper Burrell) | US — Pennsylvania (PJM) | 51/100 | +0.0 | TECfusions Keystone Connect (Upper Burrell)'s overall health score holds at 51/100. |
| Tract Caldwell County Technology Park | US — Texas (ERCOT) | 51/100 | +0.0 | Tract Caldwell County Technology Park's overall health score holds at 51/100. |
| Aligned IAD-02 (Ashburn) | US — Virginia (PJM/Dominion) | 51.8/100 | +0.0 | Aligned IAD-02 (Ashburn)'s overall health score holds at 51.8/100. |
| Equinix SG6 (Singapore) | Singapore | 51.8/100 | +0.0 | Equinix SG6 (Singapore)'s overall health score holds at 51.8/100. |
| Apple Maiden Data Center | US — North Carolina (Duke Energy) | 52/100 | +0.0 | Apple Maiden Data Center's overall health score holds at 52/100. |
| CyrusOne New Albany COL-1 | US — Ohio (AEP Ohio / PJM) | 52.8/100 | +0.0 | CyrusOne New Albany COL-1's overall health score holds at 52.8/100. |
| Stargate New Mexico - Project Jupiter (Dona Ana County) | US — Rest of US (composite) | 52.8/100 | +0.0 | Stargate New Mexico - Project Jupiter (Dona Ana County)'s overall health score holds at 52.8/100. |
| Vantage Pittsboro Campus | US — Indiana (MISO) | 53.2/100 | +0.0 | Vantage Pittsboro Campus's overall health score holds at 53.2/100. |
| CyrusOne Whitney Campus (DFW10 series, Bosque County) | US — Texas (ERCOT) | 53.5/100 | +0.0 | CyrusOne Whitney Campus (DFW10 series, Bosque County)'s overall health score holds at 53.5/100. |
| DataBank Lithia Springs Campus (ATL5/ATL6) | US — Georgia (Southern/Georgia Power) | 53.5/100 | +0.0 | DataBank Lithia Springs Campus (ATL5/ATL6)'s overall health score holds at 53.5/100. |
| DC BLOX Atlanta West | US — Georgia (Southern/Georgia Power) | 53.5/100 | +0.0 | DC BLOX Atlanta West's overall health score holds at 53.5/100. |
| EdgeConneX New Albany Campus | US — Ohio (AEP Ohio / PJM) | 53.5/100 | +0.0 | EdgeConneX New Albany Campus's overall health score holds at 53.5/100. |
| Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico) | US — Virginia (PJM/Dominion) | 53.5/100 | +0.0 | Iron Mountain Richmond Campus (RCH-1–RCH-3, Henrico)'s overall health score holds at 53.5/100. |
| Microsoft Mount Pleasant Data Center Campus | US — Wisconsin (MISO) | 53.5/100 | +0.0 | Microsoft Mount Pleasant Data Center Campus's overall health score holds at 53.5/100. |
| PowerHouse 95 (Spotsylvania) | US — Virginia (PJM/Dominion) | 53.5/100 | +0.0 | PowerHouse 95 (Spotsylvania)'s overall health score holds at 53.5/100. |
| Vantage Data Centers OH1 (New Albany) | US — Ohio (AEP Ohio / PJM) | 53.5/100 | +0.0 | Vantage Data Centers OH1 (New Albany)'s overall health score holds at 53.5/100. |
| Bridge Data Centres MY07 (Ulu Tiram) | Malaysia — Johor (Johor-Singapore SEZ) | 53.6/100 | +0.0 | Bridge Data Centres MY07 (Ulu Tiram)'s overall health score holds at 53.6/100. |
| Meta Prometheus (New Albany) | US — Rest of US (composite) | 53.8/100 | +0.0 | Meta Prometheus (New Albany)'s overall health score holds at 53.8/100. |
| Crusoe / Lancium Abilene AI Campus (Stargate) | US — Texas (ERCOT) | 54/100 | +0.0 | Crusoe / Lancium Abilene AI Campus (Stargate)'s overall health score holds at 54/100. |
| Microsoft Boydton Campus | US — Virginia (PJM/Dominion) | 54/100 | +0.0 | Microsoft Boydton Campus's overall health score holds at 54/100. |
| NTT VA6 (Ashburn) | US — Virginia (PJM/Dominion) | 54/100 | +0.0 | NTT VA6 (Ashburn)'s overall health score holds at 54/100. |
| Eneus Energy Cameron County data center | US — Texas (ERCOT) | 54.3/100 | +0.0 | Eneus Energy Cameron County data center's overall health score holds at 54.3/100. |
| Meta Mesa Data Center | US — Arizona (APS/SRP) | 54.5/100 | +0.0 | Meta Mesa Data Center's overall health score holds at 54.5/100. |
| Google Mesa Data Center | US — Arizona (APS/SRP) | 55/100 | +0.0 | Google Mesa Data Center's overall health score holds at 55/100. |
| Meta Altoona Data Center | US — Iowa (MISO) | 55/100 | +0.0 | Meta Altoona Data Center's overall health score holds at 55/100. |
| Meta Temple Data Center | US — Texas (ERCOT) | 55/100 | +0.0 | Meta Temple Data Center's overall health score holds at 55/100. |
| AWS Hilliard Third Campus (Scioto Darby Road) | US — Ohio (AEP Ohio / PJM) | 55.1/100 | +0.0 | AWS Hilliard Third Campus (Scioto Darby Road)'s overall health score holds at 55.1/100. |
| Meta Jeffersonville Data Center | US — Indiana (MISO) | 55.3/100 | +0.0 | Meta Jeffersonville Data Center's overall health score holds at 55.3/100. |
| MSB Global Services Matrix Data Center Campus | US — Texas (ERCOT) | 55.3/100 | +0.0 | MSB Global Services Matrix Data Center Campus's overall health score holds at 55.3/100. |
| AWS New Albany Data Center Campus | US — Ohio (AEP Ohio / PJM) | 56/100 | +0.0 | AWS New Albany Data Center Campus's overall health score holds at 56/100. |
| QTS Fayetteville Campus (Project Excalibur) | US — Georgia (Southern/Georgia Power) | 56/100 | +0.0 | QTS Fayetteville Campus (Project Excalibur)'s overall health score holds at 56/100. |
| Microsoft Project Rita (Tyrone) | US — Georgia (Southern/Georgia Power) | 56.2/100 | +0.0 | Microsoft Project Rita (Tyrone)'s overall health score holds at 56.2/100. |
| Google Waltham Cross Data Centre | United Kingdom | 56.5/100 | +0.0 | Google Waltham Cross Data Centre's overall health score holds at 56.5/100. |
| NTT Grove at Gainesville Campus (VA10-VA13) | US — Virginia (PJM/Dominion) | 56.5/100 | +0.0 | NTT Grove at Gainesville Campus (VA10-VA13)'s overall health score holds at 56.5/100. |
| Blackstone QTS Cambois Campus (Blyth) | United Kingdom | 57.1/100 | +0.0 | Blackstone QTS Cambois Campus (Blyth)'s overall health score holds at 57.1/100. |
| AirTrunk Osaka Campus (OSK1 + OSK2) | Japan | 57.3/100 | +0.0 | AirTrunk Osaka Campus (OSK1 + OSK2)'s overall health score holds at 57.3/100. |
| Google Midlothian Campus - Building 5 (Sharka) | US — Texas (ERCOT) | 57.3/100 | +0.0 | Google Midlothian Campus - Building 5 (Sharka)'s overall health score holds at 57.3/100. |
| Google Hanau Data Center | Germany | 57.5/100 | +0.0 | Google Hanau Data Center's overall health score holds at 57.5/100. |
| CDC Marsden Park Campus (Sydney) + 555MW US Hyperscaler Contract | Australia | 58/100 | +0.0 | CDC Marsden Park Campus (Sydney) + 555MW US Hyperscaler Contract's overall health score holds at 58/100. |
| Digital Edge SEL2 (Incheon) | South Korea | 58/100 | +0.0 | Digital Edge SEL2 (Incheon)'s overall health score holds at 58/100. |
| Edged Atlanta ATL01 Campus (Tilford Yard) | US — Georgia (Southern/Georgia Power) | 58/100 | +0.0 | Edged Atlanta ATL01 Campus (Tilford Yard)'s overall health score holds at 58/100. |
| Empyrion KR1 Gangnam (Seoul) | South Korea | 58/100 | +0.0 | Empyrion KR1 Gangnam (Seoul)'s overall health score holds at 58/100. |
| Microsoft West Des Moines Data Centers | US — Iowa (MISO) | 58/100 | +0.0 | Microsoft West Des Moines Data Centers's overall health score holds at 58/100. |
| NEXTDC S3 (Sydney) | Australia | 58/100 | +0.0 | NEXTDC S3 (Sydney)'s overall health score holds at 58/100. |
| EdgeCore Mesa (Greater Phoenix) | US — Arizona (APS/SRP) | 58.3/100 | +0.0 | EdgeCore Mesa (Greater Phoenix)'s overall health score holds at 58.3/100. |
| NEXTDC S7 Eastern Creek (OpenAI Stargate Australia) | Australia | 58.5/100 | +0.0 | NEXTDC S7 Eastern Creek (OpenAI Stargate Australia)'s overall health score holds at 58.5/100. |
| Nexus Data Center (Hubbard) | US — Texas (ERCOT) | 58.5/100 | +0.0 | Nexus Data Center (Hubbard)'s overall health score holds at 58.5/100. |
| Amazon / AWS Falls Township Data Center (Keystone Trade Center) | US — Pennsylvania (PJM) | 59/100 | +0.0 | Amazon / AWS Falls Township Data Center (Keystone Trade Center)'s overall health score holds at 59/100. |
| Amazon / AWS Salem Township Data Center Campus (Susquehanna) | US — Pennsylvania (PJM) | 59/100 | +0.0 | Amazon / AWS Salem Township Data Center Campus (Susquehanna)'s overall health score holds at 59/100. |
| CloudBurst Data Center (New Braunfels) | US — Texas (ERCOT) | 59/100 | +0.0 | CloudBurst Data Center (New Braunfels)'s overall health score holds at 59/100. |
| Google Fort Wayne Data Center | US — Indiana (MISO) | 59/100 | +0.0 | Google Fort Wayne Data Center's overall health score holds at 59/100. |
| Google / Intersect Meitner Energy Center (Texas Panhandle) | US — Texas (ERCOT) | 59/100 | +0.0 | Google / Intersect Meitner Energy Center (Texas Panhandle)'s overall health score holds at 59/100. |
| Meta Lebanon Data Center Campus (LEAP District) | US — Indiana (MISO) | 59/100 | +0.0 | Meta Lebanon Data Center Campus (LEAP District)'s overall health score holds at 59/100. |
| Microsoft Palmetto Data Center | US — Georgia (Southern/Georgia Power) | 59/100 | +0.0 | Microsoft Palmetto Data Center's overall health score holds at 59/100. |
| Rowan Project Temple (Bell County) | US — Texas (ERCOT) | 59/100 | +0.0 | Rowan Project Temple (Bell County)'s overall health score holds at 59/100. |
| Google Douglas County Data Center | US — Georgia (Southern/Georgia Power) | 59.5/100 | +0.0 | Google Douglas County Data Center's overall health score holds at 59.5/100. |
| Google Lenoir Data Center | US — North Carolina (Duke Energy) | 59.5/100 | +0.0 | Google Lenoir Data Center's overall health score holds at 59.5/100. |
| Google Goodnight Campus (Armstrong County, TX) | US — Texas (ERCOT) | 59.6/100 | +0.0 | Google Goodnight Campus (Armstrong County, TX)'s overall health score holds at 59.6/100. |
| Meta (Facebook) Forest City Data Center | US — North Carolina (Duke Energy) | 60/100 | +0.0 | Meta (Facebook) Forest City Data Center's overall health score holds at 60/100. |
| Crusoe Callaway County Missouri data center | US — Rest of US (composite) | 60.5/100 | +0.0 | Crusoe Callaway County Missouri data center's overall health score holds at 60.5/100. |
| Google Chesterfield Data Center Campus (Project Peanut) | US — Virginia (PJM/Dominion) | 60.5/100 | +0.0 | Google Chesterfield Data Center Campus (Project Peanut)'s overall health score holds at 60.5/100. |
| Joliet data center campus | US — Rest of US (composite) | 60.5/100 | +0.0 | Joliet data center campus's overall health score holds at 60.5/100. |
| Microsoft Pecos data center campus | US — Rest of US (composite) | 60.5/100 | +0.0 | Microsoft Pecos data center campus's overall health score holds at 60.5/100. |
| QTS Salem Township Campus | US — Pennsylvania (PJM) | 60.5/100 | +0.0 | QTS Salem Township Campus's overall health score holds at 60.5/100. |
| Stratos Project | US — Rest of US (composite) | 60.5/100 | +0.0 | Stratos Project's overall health score holds at 60.5/100. |
| T5 @ Atlanta IV (Palmetto) | US — Georgia (Southern/Georgia Power) | 60.5/100 | +0.0 | T5 @ Atlanta IV (Palmetto)'s overall health score holds at 60.5/100. |
| Wheatfield data center and gas plant | US — Rest of US (composite) | 60.5/100 | +0.0 | Wheatfield data center and gas plant's overall health score holds at 60.5/100. |
| Yorkville data center campus | US — Rest of US (composite) | 60.5/100 | +0.0 | Yorkville data center campus's overall health score holds at 60.5/100. |
| DC BLOX Atlanta East (Rockdale County) | US — Georgia (Southern/Georgia Power) | 60.8/100 | +0.0 | DC BLOX Atlanta East (Rockdale County)'s overall health score holds at 60.8/100. |
| Crusoe / Blue Energy Data Center (Victoria, TX) | US — Texas (ERCOT) | 61/100 | +0.0 | Crusoe / Blue Energy Data Center (Victoria, TX)'s overall health score holds at 61/100. |
| T5 @ Charlotte II (Kings Mountain) | US — North Carolina (Duke Energy) | 61/100 | +0.0 | T5 @ Charlotte II (Kings Mountain)'s overall health score holds at 61/100. |
| Switch The Keep Campus (Douglas County) | US — Georgia (Southern/Georgia Power) | 61.5/100 | +0.0 | Switch The Keep Campus (Douglas County)'s overall health score holds at 61.5/100. |
| Vantage Data Centers Ashburn I (VA1) | US — Virginia (PJM/Dominion) | 61.5/100 | +0.0 | Vantage Data Centers Ashburn I (VA1)'s overall health score holds at 61.5/100. |
| Meta Henrico Data Center (White Oak Technology Park) | US — Virginia (PJM/Dominion) | 62/100 | +0.0 | Meta Henrico Data Center (White Oak Technology Park)'s overall health score holds at 62/100. |
| Cirion BUE1 Buenos Aires Expansion | Argentina | 62.5/100 | +0.0 | Cirion BUE1 Buenos Aires Expansion's overall health score holds at 62.5/100. |
| Google Tussenweg / Green Box Computing (Hollands Kroon) | Netherlands | 62.5/100 | +0.0 | Google Tussenweg / Green Box Computing (Hollands Kroon)'s overall health score holds at 62.5/100. |
| Stack Infrastructure Berry Hill Megasite (Pittsylvania) | US — Virginia (PJM/Dominion) | 62.5/100 | +0.0 | Stack Infrastructure Berry Hill Megasite (Pittsylvania)'s overall health score holds at 62.5/100. |
| Comanche Circle | US — Rest of US (composite) | 63/100 | +0.0 | Comanche Circle's overall health score holds at 63/100. |
| CyrusOne Project Peach (Coweta County) | US — Georgia (Southern/Georgia Power) | 63/100 | +0.0 | CyrusOne Project Peach (Coweta County)'s overall health score holds at 63/100. |
| Microsoft Fairwater Atlanta | US — Georgia (Southern/Georgia Power) | 63/100 | +0.0 | Microsoft Fairwater Atlanta's overall health score holds at 63/100. |
| Prologis Project Sail (Coweta County) | US — Georgia (Southern/Georgia Power) | 63/100 | +0.0 | Prologis Project Sail (Coweta County)'s overall health score holds at 63/100. |
| Prologis Shelbyville Data Center Campus | US — Indiana (MISO) | 63/100 | +0.0 | Prologis Shelbyville Data Center Campus's overall health score holds at 63/100. |
| QTS White Oak Expansion (RIC4/RIC5, Henrico) | US — Virginia (PJM/Dominion) | 63/100 | +0.0 | QTS White Oak Expansion (RIC4/RIC5, Henrico)'s overall health score holds at 63/100. |
| Google Council Bluffs Data Center | US — Iowa (MISO) | 63.5/100 | +0.0 | Google Council Bluffs Data Center's overall health score holds at 63.5/100. |
| Shippingport / Bruce Mansfield Data Center (Project Phoenix) | US — Pennsylvania (PJM) | 63.7/100 | +0.0 | Shippingport / Bruce Mansfield Data Center (Project Phoenix)'s overall health score holds at 63.7/100. |
| GW Ranch (Pacifico Energy) | US — Texas (ERCOT) | 64/100 | +0.0 | GW Ranch (Pacifico Energy)'s overall health score holds at 64/100. |
| Metrobloks IND-A1 (Indianapolis) | US — Indiana (MISO) | 64.9/100 | +0.0 | Metrobloks IND-A1 (Indianapolis)'s overall health score holds at 64.9/100. |
| Robena Mine Data Center (Project Hummingbird) | US — Pennsylvania (PJM) | 64.9/100 | +0.0 | Robena Mine Data Center (Project Hummingbird)'s overall health score holds at 64.9/100. |
| Project Comal | US — Texas (ERCOT) | 65.9/100 | +0.0 | Project Comal's overall health score holds at 65.9/100. |
| Compass Datacenters Goodyear | US — Arizona (APS/SRP) | 66/100 | +0.0 | Compass Datacenters Goodyear's overall health score holds at 66/100. |
| DataBank Red Oak Campus (South Dallas) | US — Texas (ERCOT) | 66/100 | +0.0 | DataBank Red Oak Campus (South Dallas)'s overall health score holds at 66/100. |
| Meta El Paso Data Center | US — Texas (ERCOT) | 66/100 | +0.0 | Meta El Paso Data Center's overall health score holds at 66/100. |
| SB Energy AI Campus (Pike County, Ohio) | US — Rest of US (composite) | 66/100 | +0.0 | SB Energy AI Campus (Pike County, Ohio)'s overall health score holds at 66/100. |
| Skybox / Prologis PowerCampus Austin (Hutto) | US — Texas (ERCOT) | 66/100 | +0.0 | Skybox / Prologis PowerCampus Austin (Hutto)'s overall health score holds at 66/100. |
| Vantage Data Centers AZ1 (Goodyear) | US — Arizona (APS/SRP) | 66/100 | +0.0 | Vantage Data Centers AZ1 (Goodyear)'s overall health score holds at 66/100. |
| Aligned Project Caprock (Hale County) | US — Texas (ERCOT) | 67.8/100 | +0.0 | Aligned Project Caprock (Hale County)'s overall health score holds at 67.8/100. |
| Google Project Pegasus (LaGrange) | US — Georgia (Southern/Georgia Power) | 67.8/100 | +0.0 | Google Project Pegasus (LaGrange)'s overall health score holds at 67.8/100. |
| Khazna QAJ1 Ajman AI Data Center | United Arab Emirates | 67.8/100 | +0.0 | Khazna QAJ1 Ajman AI Data Center's overall health score holds at 67.8/100. |
| SoftBank France AI Data Center Program (Hauts-de-France) | France | 68/100 | +0.0 | SoftBank France AI Data Center Program (Hauts-de-France)'s overall health score holds at 68/100. |
| AWS Susquehanna Nuclear Data Center Campus | US — Rest of US (composite) | 68.3/100 | +0.0 | AWS Susquehanna Nuclear Data Center Campus's overall health score holds at 68.3/100. |
| ARSAT Benavidez Data Center Hall IV Expansion | Argentina | 69/100 | +0.0 | ARSAT Benavidez Data Center Hall IV Expansion's overall health score holds at 69/100. |
| du-Microsoft Hyperscale Data Center (Dubai) | United Arab Emirates | 69/100 | +0.0 | du-Microsoft Hyperscale Data Center (Dubai)'s overall health score holds at 69/100. |
| Google Haskell County Data Centers | US — Texas (ERCOT) | 69/100 | +0.0 | Google Haskell County Data Centers's overall health score holds at 69/100. |
| Iron Mountain VA-1 (Manassas) | US — Virginia (PJM/Dominion) | 69.5/100 | +0.0 | Iron Mountain VA-1 (Manassas)'s overall health score holds at 69.5/100. |
| NEXTDC M3 (West Footscray, Melbourne) | Australia | 69.5/100 | +0.0 | NEXTDC M3 (West Footscray, Melbourne)'s overall health score holds at 69.5/100. |
| QTS Ashburn 1 (ASH1) | US — Virginia (PJM/Dominion) | 69.5/100 | +0.0 | QTS Ashburn 1 (ASH1)'s overall health score holds at 69.5/100. |
| QTS Atlanta Metro DC1 | US — Georgia (Southern/Georgia Power) | 69.5/100 | +0.0 | QTS Atlanta Metro DC1's overall health score holds at 69.5/100. |
| Stack Infrastructure NVA02 (Manassas) | US — Virginia (PJM/Dominion) | 69.5/100 | +0.0 | Stack Infrastructure NVA02 (Manassas)'s overall health score holds at 69.5/100. |
| Stargate Michigan - The Barn (Saline Township) | US — Rest of US (composite) | 69.5/100 | +0.0 | Stargate Michigan - The Barn (Saline Township)'s overall health score holds at 69.5/100. |
| Vantage Data Centers Frontier (Shackelford County / Stargate) | US — Texas (ERCOT) | 69.5/100 | +0.0 | Vantage Data Centers Frontier (Shackelford County / Stargate)'s overall health score holds at 69.5/100. |
| Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) | United Arab Emirates | 71.5/100 | +0.0 | Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna)'s overall health score holds at 71.5/100. |
| Homer City Energy Campus | US — Rest of US (composite) | 71.9/100 | +0.0 | Homer City Energy Campus's overall health score holds at 71.9/100. |
| Stargate Milam County (OpenAI / SB Energy) | US — Texas (ERCOT) | 72/100 | +0.0 | Stargate Milam County (OpenAI / SB Energy)'s overall health score holds at 72/100. |
| DC BLOX Henrico (Wilkinson Road) | US — Virginia (PJM/Dominion) | 72.5/100 | +0.0 | DC BLOX Henrico (Wilkinson Road)'s overall health score holds at 72.5/100. |
| Microsoft Fairwater (Mount Pleasant) | US — Rest of US (composite) | 73.3/100 | +0.0 | Microsoft Fairwater (Mount Pleasant)'s overall health score holds at 73.3/100. |
| Meta Stanton Springs / Newton Data Center | US — Georgia (Southern/Georgia Power) | 74/100 | +0.0 | Meta Stanton Springs / Newton Data Center's overall health score holds at 74/100. |
| Khazna AUH8 Masdar City AI Data Center | United Arab Emirates | 75.3/100 | +0.0 | Khazna AUH8 Masdar City AI Data Center's overall health score holds at 75.3/100. |
| Stargate Abilene (Crusoe campus) | US — Texas (ERCOT) | 75.8/100 | +0.0 | Stargate Abilene (Crusoe campus)'s overall health score holds at 75.8/100. |
| AWS Georgia Data Center Campuses (Butts & Douglas Counties) | US — Georgia (Southern/Georgia Power) | 76/100 | +0.0 | AWS Georgia Data Center Campuses (Butts & Douglas Counties)'s overall health score holds at 76/100. |
| AWS Project Rainier (New Carlisle) | US — Rest of US (composite) | 77/100 | +0.0 | AWS Project Rainier (New Carlisle)'s overall health score holds at 77/100. |
| Sweetwater 1 and 2 (IREN) | US — Texas (ERCOT) | 78.6/100 | +0.0 | Sweetwater 1 and 2 (IREN)'s overall health score holds at 78.6/100. |
| Fermi America Project Matador HyperGrid | US — Texas (ERCOT) | 80/100 | +0.0 | Fermi America Project Matador HyperGrid's overall health score holds at 80/100. |
| AWS Louisa County Campuses (Lake Anna Tech Campus) | US — Virginia (PJM/Dominion) | 80.3/100 | +0.0 | AWS Louisa County Campuses (Lake Anna Tech Campus)'s overall health score holds at 80.3/100. |
| Meta Hyperion (Richland Parish) | US — Rest of US (composite) | 80.3/100 | +0.0 | Meta Hyperion (Richland Parish)'s overall health score holds at 80.3/100. |
| Stargate Wisconsin - Vantage Lighthouse (Port Washington) | US — Rest of US (composite) | 82/100 | +0.0 | Stargate Wisconsin - Vantage Lighthouse (Port Washington)'s overall health score holds at 82/100. |
| xAI Colossus 2 (Memphis) | US — Rest of US (composite) | 82/100 | +0.0 | xAI Colossus 2 (Memphis)'s overall health score holds at 82/100. |
New Projects Tracked
No new projects were added to the tracker in this window.
Notable Signals
Triaged source documents with relevance ≥ 0.7, dated in the window.
-
Amazon Discloses Ownership of GW Ranch, Giant Texas Data Center-Gas Power Complex (ENR - Power and Industrial, Aug 11; relevance 0.95, E4 evidence).
Relevance 0.95 Source: ENR - Power and Industrial -
Amazon Discloses Ownership of GW Ranch, Giant Texas Data Center-Power Complex (ENR - Power and Industrial, Aug 11; relevance 0.95, E4 evidence).
Relevance 0.95 Source: ENR - Power and Industrial -
Data center spanning up to 50,000 sqm gets approval for construction in west London, the UK (Data Center Dynamics, Aug 14; relevance 0.90, E4 evidence).
Relevance 0.90 Source: Data Center Dynamics -
New Mexico Gas Pipeline for Oracle Data Center Delayed to 2027 (Bloomberg Technology, Aug 14; relevance 0.90, E4 evidence).
Relevance 0.90 Source: Bloomberg Technology -
Pipeline for $165 Billion Oracle Data Center Delayed to Next Year (thenextweb.com, Aug 14; relevance 0.90, E4 evidence).
Relevance 0.90 Source: thenextweb.com -
Amazon plans 18-building campus outside Cincinnati, Ohio (Data Center Dynamics, Aug 13; relevance 0.90, E4 evidence).
Relevance 0.90 Source: Data Center Dynamics -
Nebius expands European presence, announces deployment in Estonia and second data center in Mäntsälä, Finland (Data Center Dynamics, Aug 13; relevance 0.90, E4 evidence).
Relevance 0.90 Source: Data Center Dynamics -
Nebius to lease data center capacity from Vantage in Newport, Wales (Data Center Dynamics, Aug 13; relevance 0.90, E4 evidence).
Relevance 0.90 Source: Data Center Dynamics -
L&T bags mega ₹10,000-15,000 crore order to build India’s largest NVIDIA B300 AI factory (ET News, Aug 13; relevance 0.90, E4 evidence).
Relevance 0.90 Source: ET News -
L&T secures mega order to build India’s largest NVIDIA B300 AI Factory (ET News, Aug 13; relevance 0.90, E4 evidence).
Relevance 0.90 Source: ET News
Milestone Events
No milestone events were recorded in this window.