The Compute Observer weekly intelligence brief for July 6–12, 2026. All 34 re-scored jurisdictions held their JCI rating and outlook. 2 PRS ratings moved (largest: Meta Temple Data Center, -6.5 points). No new projects were added to the tracker this week. 2 high-relevance signals (relevance ≥ 0.7) were triaged, led by "Diamond Power Infrastructure shares jump 10% after Rs 435 crore order for Hyderabad data centre projects" (ET Home). No milestone events were recorded this week.

Events This Week

No published impact events occurred in this window.

Jurisdiction Competitiveness Index

Jurisdiction
JCI
Change
Outlook
What happened
Citations
Qatar 77.4/100 +0.0
Positive
Qatar's JCI holds at 77.4/100; outlook remains Positive.
US — Iowa (MISO) 76.5/100 +0.0
Stable
US — Iowa (MISO)'s JCI holds at 76.5/100; outlook remains Stable.
US — Indiana (MISO) 72.4/100 +0.0
Positive
US — Indiana (MISO)'s JCI holds at 72.4/100; outlook remains Positive.
US — Texas (ERCOT) 72.3/100 +0.0
Stable
US — Texas (ERCOT)'s JCI holds at 72.3/100; outlook remains Stable.
United Arab Emirates 69.7/100 +0.0
Positive
United Arab Emirates's JCI holds at 69.7/100; outlook remains Positive.
US — Wisconsin (MISO) 68.5/100 +0.0
Positive
US — Wisconsin (MISO)'s JCI holds at 68.5/100; outlook remains Positive.
US — Arizona (APS/SRP) 67.2/100 +0.0
Stable
US — Arizona (APS/SRP)'s JCI holds at 67.2/100; outlook remains Stable.
US — Georgia (Southern/Georgia Power) 67.2/100 +0.0
Stable
US — Georgia (Southern/Georgia Power)'s JCI holds at 67.2/100; outlook remains Stable.
Saudi Arabia 65.2/100 +0.0
Stable
Saudi Arabia's JCI holds at 65.2/100; outlook remains Stable.
US — North Carolina (Duke Energy) 63.4/100 +0.0
Positive
US — North Carolina (Duke Energy)'s JCI holds at 63.4/100; outlook remains Positive.
US — Rest of US (composite) 63.4/100 +0.0
Stable
US — Rest of US (composite)'s JCI holds at 63.4/100; outlook remains Stable.
Sweden 63.1/100 +0.0
Positive
Sweden's JCI holds at 63.1/100; outlook remains Positive.
Canada 62.3/100 +0.0
Stable
Canada's JCI holds at 62.3/100; outlook remains Stable.
France 62.3/100 +0.0
Stable
France's JCI holds at 62.3/100; outlook remains Stable.
Australia 61.9/100 +0.0
Negative
Australia's JCI holds at 61.9/100; outlook remains Negative.
US — Virginia (PJM/Dominion) 61.6/100 +0.0
Stable
US — Virginia (PJM/Dominion)'s JCI holds at 61.6/100; outlook remains Stable.
US — Ohio (AEP Ohio / PJM) 61.2/100 +0.0
Positive
US — Ohio (AEP Ohio / PJM)'s JCI holds at 61.2/100; outlook remains Positive.
US — Pennsylvania (PJM) 60.4/100 +0.0
Positive
US — Pennsylvania (PJM)'s JCI holds at 60.4/100; outlook remains Positive.
Denmark 60.2/100 +0.0
Negative
Denmark's JCI holds at 60.2/100; outlook remains Negative.
US — Minnesota (Xcel / MISO) 59.3/100 +0.0
Stable
US — Minnesota (Xcel / MISO)'s JCI holds at 59.3/100; outlook remains Stable.
Singapore 59/100 +0.0
Stable
Singapore's JCI holds at 59/100; outlook remains Stable.
Malaysia — Johor (Johor-Singapore SEZ) 58.9/100 +0.0
Positive
Malaysia — Johor (Johor-Singapore SEZ)'s JCI holds at 58.9/100; outlook remains Positive.
Japan 58.6/100 +0.0
Stable
Japan's JCI holds at 58.6/100; outlook remains Stable.
United Kingdom 57/100 +0.0
Stable
United Kingdom's JCI holds at 57/100; outlook remains Stable.
Germany 56.7/100 +0.0
Positive
Germany's JCI holds at 56.7/100; outlook remains Positive.
India 54.9/100 +0.0
Stable
India's JCI holds at 54.9/100; outlook remains Stable.
Ireland 54.1/100 +0.0
Positive
Ireland's JCI holds at 54.1/100; outlook remains Positive.
Indonesia 53.6/100 +0.0
Stable
Indonesia's JCI holds at 53.6/100; outlook remains Stable.
South Africa 52.3/100 +0.0
Negative
South Africa's JCI holds at 52.3/100; outlook remains Negative.
Brazil 50.9/100 +0.0
Positive
Brazil's JCI holds at 50.9/100; outlook remains Positive.
Argentina 50.7/100 +0.0
Positive
Argentina's JCI holds at 50.7/100; outlook remains Positive.
Poland 50.7/100 +0.0
Positive
Poland's JCI holds at 50.7/100; outlook remains Positive.
Netherlands 50.3/100 +0.0
Negative
Netherlands's JCI holds at 50.3/100; outlook remains Negative.
South Korea 49/100 +0.0
Stable
South Korea's JCI holds at 49/100; outlook remains Stable.

Project Risk Scores

Project
Jurisdiction
Health
Change
What happened
Meta Temple Data Center US — Texas (ERCOT) 55/100 -6.5 Meta Temple Data Center's overall health score moved from 61.5 to 55 (-6.5 points).
Meta Mesa Data Center US — Arizona (APS/SRP) 54.5/100 -5.5 Meta Mesa Data Center's overall health score moved from 60 to 54.5 (-5.5 points).
Project Aggie (College Station) US — Texas (ERCOT) 10/100 +0.0 Project Aggie (College Station)'s overall health score holds at 10/100.
Prince William Digital Gateway (QTS / Compass) US — Virginia (PJM/Dominion) 10/100 +0.0 Prince William Digital Gateway (QTS / Compass)'s overall health score holds at 10/100.
Google Project Skyway (Pine Island, MN) US — Minnesota (Xcel / MISO) 35/100 +0.0 Google Project Skyway (Pine Island, MN)'s overall health score holds at 35/100.
Poolside Project Horizon US — Texas (ERCOT) 35/100 +0.0 Poolside Project Horizon's overall health score holds at 35/100.
Project Gravity (Archbald / Gouldsboro Data Center Campus) US — Pennsylvania (PJM) 35/100 +0.0 Project Gravity (Archbald / Gouldsboro Data Center Campus)'s overall health score holds at 35/100.
AWS Indiana Data Centers (New Carlisle) US — Indiana (MISO) 47/100 +0.0 AWS Indiana Data Centers (New Carlisle)'s overall health score holds at 47/100.
CoreWeave Lancaster AI Data Center Campus US — Pennsylvania (PJM) 47.5/100 +0.0 CoreWeave Lancaster AI Data Center Campus's overall health score holds at 47.5/100.
Energy Capital Partners / Calpine York 2 Data Center US — Pennsylvania (PJM) 47.5/100 +0.0 Energy Capital Partners / Calpine York 2 Data Center's overall health score holds at 47.5/100.
Pennsylvania Digital I (PAX) - Carlisle Hyperscale Campus US — Pennsylvania (PJM) 47.5/100 +0.0 Pennsylvania Digital I (PAX) - Carlisle Hyperscale Campus's overall health score holds at 47.5/100.
Telecom Argentina Edge AI Data Center Conversion Program Argentina 48.4/100 +0.0 Telecom Argentina Edge AI Data Center Conversion Program's overall health score holds at 48.4/100.
Talen Energy - AWS Susquehanna PPA US — Rest of US (composite) 50.5/100 +0.0 Talen Energy - AWS Susquehanna PPA's overall health score holds at 50.5/100.
AREP PowerHouse Grand Prairie US — Texas (ERCOT) 51/100 +0.0 AREP PowerHouse Grand Prairie's overall health score holds at 51/100.
Cologix Johnstown AI-Ready Campus US — Ohio (AEP Ohio / PJM) 51/100 +0.0 Cologix Johnstown AI-Ready Campus's overall health score holds at 51/100.
DC BLOX Atlanta West US — Georgia (Southern/Georgia Power) 51/100 +0.0 DC BLOX Atlanta West's overall health score holds at 51/100.
EdgeConneX New Albany Campus US — Ohio (AEP Ohio / PJM) 51/100 +0.0 EdgeConneX New Albany Campus's overall health score holds at 51/100.
Google New Albany Campus (Montauk Innovations) US — Ohio (AEP Ohio / PJM) 51/100 +0.0 Google New Albany Campus (Montauk Innovations)'s overall health score holds at 51/100.
Microsoft Granger Data Center (St. Joe Farms) US — Indiana (MISO) 51/100 +0.0 Microsoft Granger Data Center (St. Joe Farms)'s overall health score holds at 51/100.
Microsoft New Albany Data Centers US — Ohio (AEP Ohio / PJM) 51/100 +0.0 Microsoft New Albany Data Centers's overall health score holds at 51/100.
Novva Data Centers Mesa US — Arizona (APS/SRP) 51/100 +0.0 Novva Data Centers Mesa's overall health score holds at 51/100.
Plan Nuclear Argentino - Nuclear-Powered AI Data Center Hub (Nuclear City) Argentina 51/100 +0.0 Plan Nuclear Argentino - Nuclear-Powered AI Data Center Hub (Nuclear City)'s overall health score holds at 51/100.
TECfusions Keystone Connect (Upper Burrell) US — Pennsylvania (PJM) 51/100 +0.0 TECfusions Keystone Connect (Upper Burrell)'s overall health score holds at 51/100.
Tract Caldwell County Technology Park US — Texas (ERCOT) 51/100 +0.0 Tract Caldwell County Technology Park's overall health score holds at 51/100.
Crane Clean Energy Center US — Pennsylvania (PJM) 51.9/100 +0.0 Crane Clean Energy Center's overall health score holds at 51.9/100.
Apple Maiden Data Center US — North Carolina (Duke Energy) 52/100 +0.0 Apple Maiden Data Center's overall health score holds at 52/100.
CyrusOne New Albany COL-1 US — Ohio (AEP Ohio / PJM) 52.8/100 +0.0 CyrusOne New Albany COL-1's overall health score holds at 52.8/100.
Vantage Pittsboro Campus US — Indiana (MISO) 53.2/100 +0.0 Vantage Pittsboro Campus's overall health score holds at 53.2/100.
CyrusOne Whitney Campus (DFW10 series, Bosque County) US — Texas (ERCOT) 53.5/100 +0.0 CyrusOne Whitney Campus (DFW10 series, Bosque County)'s overall health score holds at 53.5/100.
DataBank Lithia Springs Campus (ATL5/ATL6) US — Georgia (Southern/Georgia Power) 53.5/100 +0.0 DataBank Lithia Springs Campus (ATL5/ATL6)'s overall health score holds at 53.5/100.
Microsoft Mount Pleasant Data Center Campus US — Wisconsin (MISO) 53.5/100 +0.0 Microsoft Mount Pleasant Data Center Campus's overall health score holds at 53.5/100.
Vantage Data Centers OH1 (New Albany) US — Ohio (AEP Ohio / PJM) 53.5/100 +0.0 Vantage Data Centers OH1 (New Albany)'s overall health score holds at 53.5/100.
Meta Prometheus (New Albany) US — Rest of US (composite) 53.8/100 +0.0 Meta Prometheus (New Albany)'s overall health score holds at 53.8/100.
Crusoe / Lancium Abilene AI Campus (Stargate) US — Texas (ERCOT) 54/100 +0.0 Crusoe / Lancium Abilene AI Campus (Stargate)'s overall health score holds at 54/100.
Microsoft Boydton Campus US — Virginia (PJM/Dominion) 54/100 +0.0 Microsoft Boydton Campus's overall health score holds at 54/100.
Eneus Energy Cameron County data center US — Texas (ERCOT) 54.3/100 +0.0 Eneus Energy Cameron County data center's overall health score holds at 54.3/100.
AWS New Albany Data Center Campus US — Ohio (AEP Ohio / PJM) 54.5/100 +0.0 AWS New Albany Data Center Campus's overall health score holds at 54.5/100.
Google Mesa Data Center US — Arizona (APS/SRP) 55/100 +0.0 Google Mesa Data Center's overall health score holds at 55/100.
Meta Altoona Data Center US — Iowa (MISO) 55/100 +0.0 Meta Altoona Data Center's overall health score holds at 55/100.
AWS Hilliard Third Campus (Scioto Darby Road) US — Ohio (AEP Ohio / PJM) 55.1/100 +0.0 AWS Hilliard Third Campus (Scioto Darby Road)'s overall health score holds at 55.1/100.
Meta Jeffersonville Data Center US — Indiana (MISO) 55.3/100 +0.0 Meta Jeffersonville Data Center's overall health score holds at 55.3/100.
MSB Global Services Matrix Data Center Campus US — Texas (ERCOT) 55.3/100 +0.0 MSB Global Services Matrix Data Center Campus's overall health score holds at 55.3/100.
QTS Fayetteville Campus (Project Excalibur) US — Georgia (Southern/Georgia Power) 56/100 +0.0 QTS Fayetteville Campus (Project Excalibur)'s overall health score holds at 56/100.
Microsoft Project Rita (Tyrone) US — Georgia (Southern/Georgia Power) 56.2/100 +0.0 Microsoft Project Rita (Tyrone)'s overall health score holds at 56.2/100.
Google Midlothian Campus - Building 5 (Sharka) US — Texas (ERCOT) 57.3/100 +0.0 Google Midlothian Campus - Building 5 (Sharka)'s overall health score holds at 57.3/100.
Edged Atlanta ATL01 Campus (Tilford Yard) US — Georgia (Southern/Georgia Power) 58/100 +0.0 Edged Atlanta ATL01 Campus (Tilford Yard)'s overall health score holds at 58/100.
Microsoft West Des Moines Data Centers US — Iowa (MISO) 58/100 +0.0 Microsoft West Des Moines Data Centers's overall health score holds at 58/100.
EdgeCore Mesa (Greater Phoenix) US — Arizona (APS/SRP) 58.3/100 +0.0 EdgeCore Mesa (Greater Phoenix)'s overall health score holds at 58.3/100.
Nexus Data Center (Hubbard) US — Texas (ERCOT) 58.5/100 +0.0 Nexus Data Center (Hubbard)'s overall health score holds at 58.5/100.
Stargate Argentina (Patagonia) Argentina 58.5/100 +0.0 Stargate Argentina (Patagonia)'s overall health score holds at 58.5/100.
Stargate UAE (Abu Dhabi) United Arab Emirates 58.5/100 +0.0 Stargate UAE (Abu Dhabi)'s overall health score holds at 58.5/100.
Amazon / AWS Falls Township Data Center (Keystone Trade Center) US — Pennsylvania (PJM) 59/100 +0.0 Amazon / AWS Falls Township Data Center (Keystone Trade Center)'s overall health score holds at 59/100.
Amazon / AWS Salem Township Data Center Campus (Susquehanna) US — Pennsylvania (PJM) 59/100 +0.0 Amazon / AWS Salem Township Data Center Campus (Susquehanna)'s overall health score holds at 59/100.
CloudBurst Data Center (New Braunfels) US — Texas (ERCOT) 59/100 +0.0 CloudBurst Data Center (New Braunfels)'s overall health score holds at 59/100.
Google Fort Wayne Data Center US — Indiana (MISO) 59/100 +0.0 Google Fort Wayne Data Center's overall health score holds at 59/100.
Google / Intersect Meitner Energy Center (Texas Panhandle) US — Texas (ERCOT) 59/100 +0.0 Google / Intersect Meitner Energy Center (Texas Panhandle)'s overall health score holds at 59/100.
Microsoft Palmetto Data Center US — Georgia (Southern/Georgia Power) 59/100 +0.0 Microsoft Palmetto Data Center's overall health score holds at 59/100.
Rowan Cinco Data Center Campus (Medina County) US — Texas (ERCOT) 59/100 +0.0 Rowan Cinco Data Center Campus (Medina County)'s overall health score holds at 59/100.
Rowan Project Temple (Bell County) US — Texas (ERCOT) 59/100 +0.0 Rowan Project Temple (Bell County)'s overall health score holds at 59/100.
Google Douglas County Data Center US — Georgia (Southern/Georgia Power) 59.5/100 +0.0 Google Douglas County Data Center's overall health score holds at 59.5/100.
Google Lenoir Data Center US — North Carolina (Duke Energy) 59.5/100 +0.0 Google Lenoir Data Center's overall health score holds at 59.5/100.
Meta (Facebook) Forest City Data Center US — North Carolina (Duke Energy) 60/100 +0.0 Meta (Facebook) Forest City Data Center's overall health score holds at 60/100.
Crusoe Callaway County Missouri data center US — Rest of US (composite) 60.5/100 +0.0 Crusoe Callaway County Missouri data center's overall health score holds at 60.5/100.
Joliet data center campus US — Rest of US (composite) 60.5/100 +0.0 Joliet data center campus's overall health score holds at 60.5/100.
Microsoft Pecos data center campus US — Rest of US (composite) 60.5/100 +0.0 Microsoft Pecos data center campus's overall health score holds at 60.5/100.
QTS Salem Township Campus US — Pennsylvania (PJM) 60.5/100 +0.0 QTS Salem Township Campus's overall health score holds at 60.5/100.
Stratos Project US — Rest of US (composite) 60.5/100 +0.0 Stratos Project's overall health score holds at 60.5/100.
T5 @ Atlanta IV (Palmetto) US — Georgia (Southern/Georgia Power) 60.5/100 +0.0 T5 @ Atlanta IV (Palmetto)'s overall health score holds at 60.5/100.
Wheatfield data center and gas plant US — Rest of US (composite) 60.5/100 +0.0 Wheatfield data center and gas plant's overall health score holds at 60.5/100.
Yorkville data center campus US — Rest of US (composite) 60.5/100 +0.0 Yorkville data center campus's overall health score holds at 60.5/100.
DC BLOX Atlanta East (Rockdale County) US — Georgia (Southern/Georgia Power) 60.8/100 +0.0 DC BLOX Atlanta East (Rockdale County)'s overall health score holds at 60.8/100.
Crusoe / Blue Energy Data Center (Victoria, TX) US — Texas (ERCOT) 61/100 +0.0 Crusoe / Blue Energy Data Center (Victoria, TX)'s overall health score holds at 61/100.
T5 @ Charlotte II (Kings Mountain) US — North Carolina (Duke Energy) 61/100 +0.0 T5 @ Charlotte II (Kings Mountain)'s overall health score holds at 61/100.
Stargate New Mexico - Project Jupiter (Dona Ana County) US — Rest of US (composite) 61.5/100 +0.0 Stargate New Mexico - Project Jupiter (Dona Ana County)'s overall health score holds at 61.5/100.
Switch The Keep Campus (Douglas County) US — Georgia (Southern/Georgia Power) 61.5/100 +0.0 Switch The Keep Campus (Douglas County)'s overall health score holds at 61.5/100.
Vantage Data Centers Ashburn I (VA1) US — Virginia (PJM/Dominion) 61.5/100 +0.0 Vantage Data Centers Ashburn I (VA1)'s overall health score holds at 61.5/100.
Meta Henrico Data Center (White Oak Technology Park) US — Virginia (PJM/Dominion) 62/100 +0.0 Meta Henrico Data Center (White Oak Technology Park)'s overall health score holds at 62/100.
Cirion BUE1 Buenos Aires Expansion Argentina 62.5/100 +0.0 Cirion BUE1 Buenos Aires Expansion's overall health score holds at 62.5/100.
Comanche Circle US — Rest of US (composite) 63/100 +0.0 Comanche Circle's overall health score holds at 63/100.
CyrusOne Project Peach (Coweta County) US — Georgia (Southern/Georgia Power) 63/100 +0.0 CyrusOne Project Peach (Coweta County)'s overall health score holds at 63/100.
Prologis Project Sail (Coweta County) US — Georgia (Southern/Georgia Power) 63/100 +0.0 Prologis Project Sail (Coweta County)'s overall health score holds at 63/100.
Prologis Shelbyville Data Center Campus US — Indiana (MISO) 63/100 +0.0 Prologis Shelbyville Data Center Campus's overall health score holds at 63/100.
Google Council Bluffs Data Center US — Iowa (MISO) 63.5/100 +0.0 Google Council Bluffs Data Center's overall health score holds at 63.5/100.
GW Ranch (Pacifico Energy) US — Texas (ERCOT) 64/100 +0.0 GW Ranch (Pacifico Energy)'s overall health score holds at 64/100.
Microsoft Fairwater Atlanta US — Georgia (Southern/Georgia Power) 64/100 +0.0 Microsoft Fairwater Atlanta's overall health score holds at 64/100.
Metrobloks IND-A1 (Indianapolis) US — Indiana (MISO) 64.9/100 +0.0 Metrobloks IND-A1 (Indianapolis)'s overall health score holds at 64.9/100.
Robena Mine Data Center (Project Hummingbird) US — Pennsylvania (PJM) 64.9/100 +0.0 Robena Mine Data Center (Project Hummingbird)'s overall health score holds at 64.9/100.
Project Comal US — Texas (ERCOT) 65.9/100 +0.0 Project Comal's overall health score holds at 65.9/100.
Compass Datacenters Goodyear US — Arizona (APS/SRP) 66/100 +0.0 Compass Datacenters Goodyear's overall health score holds at 66/100.
DataBank Red Oak Campus (South Dallas) US — Texas (ERCOT) 66/100 +0.0 DataBank Red Oak Campus (South Dallas)'s overall health score holds at 66/100.
Meta El Paso Data Center US — Texas (ERCOT) 66/100 +0.0 Meta El Paso Data Center's overall health score holds at 66/100.
SB Energy AI Campus (Pike County, Ohio) US — Rest of US (composite) 66/100 +0.0 SB Energy AI Campus (Pike County, Ohio)'s overall health score holds at 66/100.
Skybox / Prologis PowerCampus Austin (Hutto) US — Texas (ERCOT) 66/100 +0.0 Skybox / Prologis PowerCampus Austin (Hutto)'s overall health score holds at 66/100.
Vantage Data Centers AZ1 (Goodyear) US — Arizona (APS/SRP) 66/100 +0.0 Vantage Data Centers AZ1 (Goodyear)'s overall health score holds at 66/100.
Aligned Project Caprock (Hale County) US — Texas (ERCOT) 67.8/100 +0.0 Aligned Project Caprock (Hale County)'s overall health score holds at 67.8/100.
Google Project Pegasus (LaGrange) US — Georgia (Southern/Georgia Power) 67.8/100 +0.0 Google Project Pegasus (LaGrange)'s overall health score holds at 67.8/100.
Khazna QAJ1 Ajman AI Data Center United Arab Emirates 67.8/100 +0.0 Khazna QAJ1 Ajman AI Data Center's overall health score holds at 67.8/100.
Meta Lebanon Data Center Campus (LEAP District) US — Indiana (MISO) 67.8/100 +0.0 Meta Lebanon Data Center Campus (LEAP District)'s overall health score holds at 67.8/100.
Vantage Lighthouse Campus (Port Washington) US — Wisconsin (MISO) 67.8/100 +0.0 Vantage Lighthouse Campus (Port Washington)'s overall health score holds at 67.8/100.
SoftBank France AI Data Center Program (Hauts-de-France) France 68/100 +0.0 SoftBank France AI Data Center Program (Hauts-de-France)'s overall health score holds at 68/100.
AWS Susquehanna Nuclear Data Center Campus US — Rest of US (composite) 68.3/100 +0.0 AWS Susquehanna Nuclear Data Center Campus's overall health score holds at 68.3/100.
Shippingport / Bruce Mansfield Data Center (Project Phoenix) US — Pennsylvania (PJM) 68.7/100 +0.0 Shippingport / Bruce Mansfield Data Center (Project Phoenix)'s overall health score holds at 68.7/100.
ARSAT Benavidez Data Center Hall IV Expansion Argentina 69/100 +0.0 ARSAT Benavidez Data Center Hall IV Expansion's overall health score holds at 69/100.
du-Microsoft Hyperscale Data Center (Dubai) United Arab Emirates 69/100 +0.0 du-Microsoft Hyperscale Data Center (Dubai)'s overall health score holds at 69/100.
Iron Mountain VA-1 (Manassas) US — Virginia (PJM/Dominion) 69.5/100 +0.0 Iron Mountain VA-1 (Manassas)'s overall health score holds at 69.5/100.
QTS Ashburn 1 (ASH1) US — Virginia (PJM/Dominion) 69.5/100 +0.0 QTS Ashburn 1 (ASH1)'s overall health score holds at 69.5/100.
QTS Atlanta Metro DC1 US — Georgia (Southern/Georgia Power) 69.5/100 +0.0 QTS Atlanta Metro DC1's overall health score holds at 69.5/100.
Stack Infrastructure NVA02 (Manassas) US — Virginia (PJM/Dominion) 69.5/100 +0.0 Stack Infrastructure NVA02 (Manassas)'s overall health score holds at 69.5/100.
Stargate Michigan - The Barn (Saline Township) US — Rest of US (composite) 69.5/100 +0.0 Stargate Michigan - The Barn (Saline Township)'s overall health score holds at 69.5/100.
Vantage Data Centers Frontier (Shackelford County / Stargate) US — Texas (ERCOT) 69.5/100 +0.0 Vantage Data Centers Frontier (Shackelford County / Stargate)'s overall health score holds at 69.5/100.
Google Chesterfield Data Center Campus (Project Peanut) US — Virginia (PJM/Dominion) 71.5/100 +0.0 Google Chesterfield Data Center Campus (Project Peanut)'s overall health score holds at 71.5/100.
Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna) United Arab Emirates 71.5/100 +0.0 Microsoft-G42 UAE 200MW Capacity Expansion (via Khazna)'s overall health score holds at 71.5/100.
Homer City Energy Campus US — Rest of US (composite) 71.9/100 +0.0 Homer City Energy Campus's overall health score holds at 71.9/100.
Stargate Milam County (OpenAI / SB Energy) US — Texas (ERCOT) 72/100 +0.0 Stargate Milam County (OpenAI / SB Energy)'s overall health score holds at 72/100.
Microsoft Fairwater (Mount Pleasant) US — Rest of US (composite) 73.3/100 +0.0 Microsoft Fairwater (Mount Pleasant)'s overall health score holds at 73.3/100.
Meta Stanton Springs / Newton Data Center US — Georgia (Southern/Georgia Power) 74/100 +0.0 Meta Stanton Springs / Newton Data Center's overall health score holds at 74/100.
Khazna AUH8 Masdar City AI Data Center United Arab Emirates 75.3/100 +0.0 Khazna AUH8 Masdar City AI Data Center's overall health score holds at 75.3/100.
Stargate Abilene (Crusoe campus) US — Texas (ERCOT) 75.8/100 +0.0 Stargate Abilene (Crusoe campus)'s overall health score holds at 75.8/100.
AWS Georgia Data Center Campuses (Butts & Douglas Counties) US — Georgia (Southern/Georgia Power) 76/100 +0.0 AWS Georgia Data Center Campuses (Butts & Douglas Counties)'s overall health score holds at 76/100.
AWS Project Rainier (New Carlisle) US — Rest of US (composite) 77/100 +0.0 AWS Project Rainier (New Carlisle)'s overall health score holds at 77/100.
Google Haskell County Data Centers US — Texas (ERCOT) 77/100 +0.0 Google Haskell County Data Centers's overall health score holds at 77/100.
Sweetwater 1 and 2 (IREN) US — Texas (ERCOT) 78.6/100 +0.0 Sweetwater 1 and 2 (IREN)'s overall health score holds at 78.6/100.
Fermi America Project Matador HyperGrid US — Texas (ERCOT) 80/100 +0.0 Fermi America Project Matador HyperGrid's overall health score holds at 80/100.
AWS Louisa County Campuses (Lake Anna Tech Campus) US — Virginia (PJM/Dominion) 80.3/100 +0.0 AWS Louisa County Campuses (Lake Anna Tech Campus)'s overall health score holds at 80.3/100.
Meta Hyperion (Richland Parish) US — Rest of US (composite) 80.3/100 +0.0 Meta Hyperion (Richland Parish)'s overall health score holds at 80.3/100.
Stargate Wisconsin - Vantage Lighthouse (Port Washington) US — Rest of US (composite) 82/100 +0.0 Stargate Wisconsin - Vantage Lighthouse (Port Washington)'s overall health score holds at 82/100.
xAI Colossus 2 (Memphis) US — Rest of US (composite) 82/100 +0.0 xAI Colossus 2 (Memphis)'s overall health score holds at 82/100.

New Projects Tracked

No new projects were added to the tracker in this window.

Notable Signals

Triaged source documents with relevance ≥ 0.7, dated in the window.

  • Diamond Power Infrastructure shares jump 10% after Rs 435 crore order for Hyderabad data centre projects (ET Home, Jul 6; relevance 0.75, E4 evidence).

    E4
    Relevance 0.75
    power
    project_news
    capital
    Source: ET Home

  • Tokyo puts billions behind Micron's chip plan (The Street, Jul 6; relevance 0.70, E4 evidence).

    E4
    Relevance 0.70
    hardware
    capital
    Source: The Street

Milestone Events

No milestone events were recorded in this window.

Every figure in this brief is composed deterministically from append-only stored records (jurisdiction scores, project risk scores, milestones, triaged source documents) and carries its citation. Sources synced from the common.vision archive are named but not hyperlinked when no public URL is stored.