Compute Institute
Ratings for the physical buildout of AI
Holder Construction

Holder Construction

Other

Holder Construction is a tracked other in the Compute Institute project database holding 3 roles across 3 projects in 3 jurisdictions (US — Arizona (APS/SRP), US — North Carolina (Duke Energy) and US — Ohio (AEP Ohio / PJM)), a combined 496 MW of tracked capacity exposure. Every role below is backed by cited source documents.

Exposure

Tracked capacity
496 MW
Evidenced capital
Projects
3
Jurisdictions touched
US — Arizona (APS/SRP), US — North Carolina (Duke Energy), US — Ohio (AEP Ohio / PJM)

Tracked MW by project status

Construction
496 MW
Operating
0 MW
Announced
0 MW

Portfolio

Every tracked role this entity holds on a project. Each row derives from cited claims; sources are listed below.

Project
Role
Status
Capacity
Committed capital
Jurisdiction
EdgeCore Mesa (Greater Phoenix)
General Contractor
Construction
496 MW US — Arizona (APS/SRP)
Apple Maiden Data Center
General Contractor
Operating
US — North Carolina (Duke Energy)
Google New Albany Campus (Montauk Innovations)
General Contractor
Announced
US — Ohio (AEP Ohio / PJM)

Sources & citations

Canonical claims backing this entity record and its project roles, from cited source documents graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Construction Dive · Nov 7, 2019 · backs: role

    https://www.constructiondive.com/news/google-starts-construction-on-600m-data-center-in-unlikely-burgeoning-tech/566813/

  2. Construction Dive · backs: role

    https://www.constructiondive.com/news/holder-construction-arizona-data-center/704098/

  3. 9to5Mac · Mar 16, 2012 · backs: role

    https://9to5mac.com/2012/03/16/construction-begins-on-apples-maiden-north-carolina-data-center-expansion/