Georgia Power is a tracked utility in the Compute Institute project database holding 5 roles across 5 projects in 1 jurisdiction (US — Georgia (Southern/Georgia Power)), a combined 288 MW of tracked capacity exposure. Every role below is backed by cited source documents.
Every tracked role this entity holds on a project. Each row derives from cited claims; sources are listed below.
|
Project
|
Role
|
Status
|
Capacity
|
Committed capital
|
Jurisdiction
|
|---|---|---|---|---|---|
| Edged Atlanta ATL01 Campus (Tilford Yard) | 168 MW | — | US — Georgia (Southern/Georgia Power) | ||
| DataBank Lithia Springs Campus (ATL5/ATL6) | 120 MW | — | US — Georgia (Southern/Georgia Power) | ||
| CyrusOne Project Peach (Coweta County) | — | — | US — Georgia (Southern/Georgia Power) | ||
| DC BLOX Atlanta East (Rockdale County) | — | — | US — Georgia (Southern/Georgia Power) | ||
| QTS Atlanta Metro DC1 | — | — | US — Georgia (Southern/Georgia Power) |
Canonical claims backing this entity record and its project roles, from cited source documents graded on the E1 (strongest) – E5 (weakest) evidence ladder.
QTS (q.com) · backs: role
https://q.com/data-centers/atlanta
DC BLOX · backs: role
https://www.dcblox.com/data-centers/rockdale-county-ga-hyperscale-data-center-campus/
PRNewswire · Aug 22, 2024 · backs: role
https://www.prnewswire.com/news-releases/edged-data-centers-celebrates-grand-opening-of-new-ultra-efficient-sustainable-data-center-in-atlanta-302228778.html
DataBank · backs: role
https://www.databank.com/data-centers/atlanta/lithia-springs/
Newnan Times-Herald · backs: role
https://www.times-herald.com/data_center/where-cowetas-five-proposed-data-centers-stand/