Dominion Virginia Power (Dominion Energy) is a tracked utility in the Compute Institute project database holding 2 roles across 2 projects in 1 jurisdiction (US — Virginia (PJM/Dominion)), a combined 0 MW of tracked capacity exposure. Every role below is backed by cited source documents.
Every tracked role this entity holds on a project. Each row derives from cited claims; sources are listed below.
|
Project
|
Role
|
Status
|
Capacity
|
Committed capital
|
Jurisdiction
|
|---|---|---|---|---|---|
| Google Chesterfield Data Center Campus (Project Peanut) | — | — | US — Virginia (PJM/Dominion) | ||
| Microsoft Boydton Campus | — | — | US — Virginia (PJM/Dominion) |
Canonical claims backing this entity record and its project roles, from cited source documents graded on the E1 (strongest) – E5 (weakest) evidence ladder.
Virginia Economic Development Partnership · Aug 27, 2010 · backs: role
https://www.vedp.org/press-release/2010-08/mecklenburg-county-microsoft-locate-major-data-center
DCD · backs: role
https://www.datacenterdynamics.com/en/news/dominion-to-build-new-high-voltage-lines-to-supply-proposed-900mw-data-center-in-chesterfield-county-virginia/