Every build we can see — whether or not we rate it. A record here asserts two things and no more: that the build exists, and where we read about it. Capacity, status and location are reported figures, attributed to their source and never treated as canonical.
When a build earns a primary-source spine we verify it, score it, and it moves to the rated tier — where the number is ours and we stand behind it. How a build gets rated.
builds tracked
rated
markets scored
| Build | Jurisdiction (reported) | Capacity (reported) | State | Source |
|---|---|---|---|---|
| DeepSeek Ulanqab data center campus | — | 1,000 MW | Data Center Dynamics | |
| Elsham Wolds | — | 1,000 MW | The National | |
| Energy Dome Odessa Texas data center project | US — Texas (ERCOT) | 1,000 MW | pv magazine USA | |
| Flint Hills Digital Campus | US — Rest of US (composite) | 1,000 MW | Data Center Dynamics | |
| Google data center - near Detroit | — | 1,000 MW | Data Center Dynamics | |
| ITC Yangkou Port Data Center | — | 1,000 MW | Data Center Dynamics | |
| Kodiak Gas Services behind-the-meter power initiative | — | 1,000 MW | Power Engineering | |
| London data center capacity | — | 1,000 MW | Data Center Dynamics | |
| Meitner Energy Center | US — Texas (ERCOT) | 1,000 MW | DCD | |
| Microsoft FY2026 Data Center Buildout | — | 1,000 MW | Data Center Dynamics | |
| Naver Data Center Phase 1 | — | 1,000 MW | Data Center Dynamics | |
| Naver Sejong Data Center | — | 1,000 MW | Data Center Dynamics | |
| Nixxy and Tachyon 9 North Dakota data center campus | US — Rest of US (composite) | 1,000 MW | Data Center Dynamics | |
| Pantheon Atlas Topusko | — | 1,000 MW | Data Center Dynamics | |
| Project Amberjack | — | 1,000 MW | Interesting Engineering | |
| Project Sopaipilla | US — Texas (ERCOT) | 1,000 MW | Capacity Media | |
| Rio AI City | — | 1,000 MW | Data Center Dynamics | |
| Savannah River Site AI Data Center | — | 1,000 MW | Data Center Dynamics | |
| SK Ulsan Data Center | — | 1,000 MW | Data Center Dynamics | |
| SpaceXAI Memphis data center | — | 1,000 MW | Tom’s Hardware | |
| TCS One-Gigawatt Capacity Data Center in Southern India | India | 1,000 MW | Bloomberg Technology | |
| Tsukuba Tech Central TKO05 | — | 1,000 MW | Data Center Dynamics | |
| Vantage Wales AI capacity expansion | — | 1,000 MW | Data Center Dynamics | |
| Z.AI 1-gigawatt data centre | — | 1,000 MW | thenextweb.com | |
| Zankore by Indosat | — | 1,000 MW | Data Center Dynamics | |
| Cape Station GeoCluster | — | 996 MW | Power Engineering | |
| Gennaker offshore wind farm | — | 977 MW | Data Center Dynamics | |
| Cascade Advanced Energy Facility | — | 960 MW | Data Center Dynamics | |
| Cumulus data center campus | — | 960 MW | Power Engineering | |
| X-energy Energy Northwest deployment | — | 960 MW | Data Center Frontier | |
| IEP behind-the-meter gas plant in Pennsylvania | US — Rest of US (composite) | 944 MW | Utility Dive | |
| Crusoe West Texas power plant | US — Texas (ERCOT) | 933 MW | Techcrunch | |
| Goodnight Wind | — | 933 MW | Latitude Media | |
| Greenlight Electricity Centre | — | 932 MW | POWER Magazine | |
| Abilene AI Factory Campus (New) | US — Texas (ERCOT) | 900 MW | Crusoe | |
| Apollo | — | 900 MW | Data Center Dynamics | |
| Firmus AI data centers across all locations | — | 900 MW | Data Center Dynamics | |
| Mount Pleasant Phase 2 | — | 900 MW | FOX6 Milwaukee | |
| Mountain Road Technology Park | — | 900 MW | Data Center Dynamics | |
| Stateline Power data center | — | 900 MW | DCD | |
| Tuckahoe Technology Park | — | 900 MW | Data Center Dynamics | |
| Vantage and VoltaGrid San Antonio natural gas data centers | — | 877 MW | Data Center Dynamics | |
| Waterford Energy Center acquisition | — | 869 MW | Power Engineering | |
| Fitzpatrick Clean Energy Center | — | 842 MW | Power Engineering | |
| CleanMax solar and wind projects | — | 837 MW | Meta Newsroom | |
| Three Mile Island | US — Rest of US (composite) | 837 MW | DCD | |
| Peru Shelf | — | 810 MW | Data Center Dynamics | |
| atNorth | — | 800 MW | Data Center Dynamics | |
| Bundey | — | 800 MW | Data Center Dynamics | |
| Central Ohio AI-Ready Data Center Campus | US — Rest of US (composite) | 800 MW | Cologix |