Compute Institute
Ratings for the physical buildout of AI
The Register
Tracked · unrated

Champlain Hudson Power Express (CHPE)

This build is tracked, not rated. We hold a source for it and we are showing you exactly what that source says — but we have not verified these figures, and no Project Risk Score has been issued. Nothing on this page is a Compute Institute judgment.

What the source reports

Capacity
1,250 MW
Capital cost
not reported
Jurisdiction
Canada
Lifecycle status
commissioned

Reported by Renewable Energy World on 22 June 2026. We have not verified these figures.

What is missing before we would rate it

  • A primary source (E1 regulatory record or E2 company disclosure). What we hold is reporting, not a filing.
  • A second independent source. One document is a report; two is corroboration.

A rating requires an E1–E2 primary spine and passes our verification step; the methodology sets out the full ladder.

Claims on file

  • project.announced_date 2021-09-01
    E4
  • project.announced_date 2021-01-01
    E4
  • project.capacity_mw 1,250 megawatts
    E4
  • project.capacity_mw 1,250 MW
    E4
  • project.status commissioned
    E4
  • project.status operating
    E4