Oncor

Oncor

Utility

Oncor is a tracked utility in the Compute Institute project database holding 3 roles across 3 projects in 1 jurisdiction (US — Texas (ERCOT)), a combined 840 MW of tracked capacity exposure. Every role below is backed by cited source documents.

Exposure

Tracked capacity
840 MW
Evidenced capital
Projects
3
Jurisdictions touched
US — Texas (ERCOT)

Tracked MW by project status

Construction
480 MW
Permitted
360 MW

Portfolio

Every tracked role this entity holds on a project. Each row derives from cited claims; sources are listed below.

Project
Role
Status
Capacity
Committed capital
Jurisdiction
DataBank Red Oak Campus (South Dallas)
Utility Provider
Construction
480 MW US — Texas (ERCOT)
Project Comal
Utility Provider
Permitted
360 MW US — Texas (ERCOT)
Rowan Project Temple (Bell County)
Utility Provider
Construction
US — Texas (ERCOT)

Sources & citations

Canonical claims backing this entity record and its project roles, from cited source documents graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. DataBank · backs: role

    https://www.databank.com/resources/blogs/building-the-future-inside-databanks-red-oak-campus-construction/

  2. Data Center Dynamics · Apr 1, 2026 · backs: role

    https://www.datacenterdynamics.com/en/news/360mw-data-center-to-be-built-outside-austin-texas/

  3. Data Center Dynamics · Jan 6, 2026 · backs: role

    https://www.datacenterdynamics.com/en/news/rowan-starts-work-on-300mw-data-center-in-temple-texas/