Compute Institute
Ratings for the physical buildout of AI
Entergy Louisiana

Entergy Louisiana

Utility

Entergy Louisiana is a tracked utility in the Compute Institute project database holding 3 roles across 2 projects in 2 jurisdictions (US — Louisiana (Entergy Louisiana / SWEPCO / Cleco — MISO South, LRZ 9; regulator: Louisiana Public Service Commission) and US — Rest of US (composite)), a combined 2,245 MW of tracked capacity exposure. Every role below is backed by cited source documents.

Exposure

Tracked capacity
2,245 MW
Evidenced capital
Projects
2
Jurisdictions touched
US — Louisiana (Entergy Louisiana / SWEPCO / Cleco — MISO South, LRZ 9; regulator: Louisiana Public Service Commission), US — Rest of US (composite)

Tracked MW by project status

Construction
2,245 MW

Portfolio

Every tracked role this entity holds on a project. Each row derives from cited claims; sources are listed below.

Project
Role
Status
Capacity
Committed capital
Jurisdiction
Meta Hyperion (Richland Parish)
Power Supplier
Construction
2,000 MW US — Rest of US (composite)
Meta Hyperion (Richland Parish)
Utility Provider
Construction
2,000 MW US — Rest of US (composite)
Hut 8 River Bend Data Center Campus
Utility Provider
Construction
245 MW US — Louisiana (Entergy Louisiana / SWEPCO / Cleco — MISO South, LRZ 9; regulator: Louisiana Public Service Commission)

Sources & citations

Canonical claims backing this entity record and its project roles, from cited source documents graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. Louisiana Economic Development · Dec 17, 2025 · backs: role

    https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center

  2. Entergy · Dec 6, 2024 · backs: role

    https://www.entergy.com/news/entergy-louisiana-power-meta-s-data-center-in-richland-parish

  3. Meta Data Centers · backs: role