Every build we can see — whether or not we rate it. A record here asserts two things and no more: that the build exists, and where we read about it. Capacity, status and location are reported figures, attributed to their source and never treated as canonical.
When a build earns a primary-source spine we verify it, score it, and it moves to the rated tier — where the number is ours and we stand behind it. How a build gets rated.
builds tracked
rated
markets scored
| Build | Jurisdiction (reported) | Capacity (reported) | State | Source |
|---|---|---|---|---|
| Maincubes Schiphol Rijk | — | 5 MW | Data Center Dynamics | |
| Malaga data center | — | 5 MW | Data Center Dynamics | |
| MSP2 | — | 5 MW | Data Center Dynamics | |
| North Augusta site | — | 5 MW | DC BLOX | |
| Ohio flared-gas-powered cryptomine sites | US — Rest of US (composite) | 5 MW | Data Center Dynamics | |
| Parks Data Centers Cachoeirinha | — | 5 MW | Data Center Dynamics | |
| PG&E flexible data center site (Bay Area distribution) | — | 5 MW | Latitude Media | |
| Plato5X 100-megawatt deployment | — | 5 MW | Interesting Engineering | |
| PWR-5 | US — Texas (ERCOT) | 5 MW | Interesting Engineering | |
| Sentul Data Center | — | 5 MW | YTL Power | |
| Valar Atomics reactor | — | 5 MW | Heatmap News | |
| Visionbay.ai 5MW AI cluster | — | 5 MW | Data Center Dynamics | |
| Waita No. 2 Geothermal Power Plant | — | 5 MW | Data Center Dynamics | |
| Ward 250 | — | 5 MW | POWER Magazine | |
| Wave Infra AI research lab and data centre | — | 5 MW | BetaKit | |
| Wellhead Electric pilot project | US — Rest of US (composite) | 5 MW | Canary Media | |
| Axe Compute largest contract to date | — | 5 MW | Data Center Dynamics | |
| NorthC Oude Meer | — | 5 MW | Data Center Dynamics | |
| Atlanta-Norcross, Georgia | US — Georgia (Southern/Georgia Power) | 5 MW | Data Center Dynamics | |
| Frankfurt 2 | — | 5 MW | Data Center Dynamics | |
| GE1 | — | 4 MW | Data Center Dynamics | |
| 4MW data center expansion project | — | 4 MW | Data Center Dynamics | |
| AI data center in Ukraine | — | 4 MW | Data Center Dynamics | |
| American Tower Oklahoma City Edge Data Center | US — Rest of US (composite) | 4 MW | Data Center Dynamics | |
| American Tower Tampa Bay Edge Data Center | US — Rest of US (composite) | 4 MW | Data Center Dynamics | |
| Carrier Connect Alpharetta data center | US — Georgia (Southern/Georgia Power) | 4 MW | Data Center Dynamics | |
| Carrier Connect data center outside Atlanta, Georgia | US — Georgia (Southern/Georgia Power) | 4 MW | Data Center Dynamics | |
| GD Power's Jinjie Company CCS project | — | 4 MW | Heatmap News | |
| Izmir data center | — | 4 MW | Data Center Dynamics | |
| Epic Systems Campus Geothermal Heat Storage | — | 4 MW | The Conversation | |
| Fervo Energy Nevada demonstration plant | US — Rest of US (composite) | 4 MW | Heatmap News | |
| WCDU | — | 4 MW | Data Center Dynamics | |
| HOU3 Solar Installation | US — Texas (ERCOT) | 3 MW | DataBank | |
| De Novo data center | — | 3 MW | Data Center Dynamics | |
| Antares R1 Fort Bragg | — | 3 MW | POWER Magazine | |
| DataVault Auckland data center | — | 3 MW | Data Center Dynamics | |
| IceFox Data Center | — | 3 MW | Data Center Dynamics | |
| KAYTUS Containerized Liquid-Cooled Data Center Solution | — | 3 MW | Interesting Engineering | |
| Sage Geosystems Texas pilot plant | US — Texas (ERCOT) | 3 MW | Heatmap News | |
| Soya Green Data Center 1 | — | 3 MW | Data Center Dynamics | |
| 744 Roble Road | US — Rest of US (composite) | 3 MW | Data Center Dynamics | |
| Apex 2500 | — | 3 MW | Data Center Dynamics | |
| CDU 2.X | — | 3 MW | Data Center Dynamics | |
| 175D GenSet | — | 2 MW | Data Center Dynamics | |
| Hywind Demo | — | 2 MW | Data Center Dynamics | |
| Shanghai offshore wind-powered underwater data center | — | 2 MW | Interesting Engineering | |
| Intelishift data center in Louisville, Kentucky | US — Rest of US (composite) | 2 MW | Data Center Dynamics | |
| Nexspace Graz (existing) | — | 2 MW | Data Center Dynamics | |
| AI data center at Karlsruhe Institute of Technology | — | 2 MW | Data Center Dynamics | |
| Duos Edge AI Columbus Georgia campus | US — Georgia (Southern/Georgia Power) | 2 MW | Data Center Dynamics |