Every build we can see — whether or not we rate it. A record here asserts two things and no more: that the build exists, and where we read about it. Capacity, status and location are reported figures, attributed to their source and never treated as canonical.
When a build earns a primary-source spine we verify it, score it, and it moves to the rated tier — where the number is ours and we stand behind it. How a build gets rated.
builds tracked
rated
markets scored
| Build | Jurisdiction (reported) | Capacity (reported) | State | Source |
|---|---|---|---|---|
| Paris data center project | — | 48 MW | Data Center Dynamics | |
| Pure DC UAE expansion | United Arab Emirates | 48 MW | Data Center Dynamics | |
| South Elgin Data Center | US — Rest of US (composite) | 48 MW | Data Center Dynamics | |
| Talen Nuclear-Powered Data Center Campus | — | 48 MW | Data Center Dynamics | |
| Chennai AI-ready campus | — | 45 MW | thenextweb.com | |
| CyrusOne Carrollton Data Center | US — Texas (ERCOT) | 45 MW | Bisnow | |
| Meeza 44MW build-out | — | 44 MW | Data Center Dynamics | |
| Aligned, Salt Lake City Data Center SLC-02 | — | 42 MW | Turner Construction | |
| AS02 | US — Virginia (PJM/Dominion) | 42 MW | Data Center Dynamics | |
| ATL01-3 | — | 42 MW | Data Center Dynamics | |
| FR-SXB1 | — | 42 MW | Data Center Dynamics | |
| FR-SXB2 | — | 42 MW | Data Center Dynamics | |
| CC3 | — | 40 MW | Data Center Dynamics | |
| CleanCore Minnesota data center campus | US — Texas (ERCOT) | 40 MW | Data Center Dynamics | |
| Digi Power X Columbiana Alabama AI campus | US — Rest of US (composite) | 40 MW | Data Center Frontier | |
| DRA02 | — | 40 MW | Data Center Dynamics | |
| FRA04 | — | 40 MW | Data Center Dynamics | |
| Heinola | — | 40 MW | Data Center Dynamics | |
| HER01 | — | 40 MW | Data Center Dynamics | |
| Kaohsiung-1 | — | 40 MW | Data Center Dynamics | |
| Kauri CAB Digital Infrastructure Frankfurt | — | 40 MW | Data Center Dynamics | |
| NFD Korea Ansan Data Center | — | 40 MW | Data Center Dynamics | |
| SIN01 | — | 38 MW | Capacity Media | |
| TECfusions Virginia (Clarksville) | US — Virginia (PJM/Dominion) | 37 MW | Data Center Dynamics | |
| Edged US Mesa, Arizona facility | US — Rest of US (composite) | 36 MW | Capacity Media | |
| SAT2-SAT3 | — | 36 MW | Data Center Dynamics | |
| ECL data center in California | US — Rest of US (composite) | 35 MW | Data Center Dynamics | |
| European sovereign AI cloud | — | 35 MW | Data Center Dynamics | |
| Chicago stock exchange building redevelopment | US — Rest of US (composite) | 33 MW | Data Center Dynamics | |
| Elk River Capital/Swervo data center | — | 33 MW | Data Center Dynamics | |
| London19 | — | 33 MW | Data Center Dynamics | |
| Hive Boden facility | — | 32 MW | Data Center Dynamics | |
| Stockholm 4 South | — | 32 MW | Data Center Dynamics | |
| AUH6 | United Arab Emirates | 32 MW | DCD | |
| Fagelas wind farm | — | 32 MW | Data Center Dynamics | |
| TKW1 | — | 31 MW | Data Center Dynamics | |
| 30-megawatt computing facility | — | 30 MW | Interesting Engineering | |
| AMD and Rackspace AI Infrastructure Deployment | — | 30 MW | HPCwire | |
| Ampera Integrated Energy Architecture | — | 30 MW | Tom’s Hardware | |
| AUH4 | — | 30 MW | MEED | |
| Juhansuo | — | 30 MW | Data Center Dynamics | |
| Krambu Spokane Washington site | US — Rest of US (composite) | 30 MW | Data Center Dynamics | |
| Legacy Investing downtown Minneapolis data center | — | 30 MW | Network World | |
| Oakland University data center | — | 30 MW | Data Center Dynamics | |
| Seatrium 30MW offshore data center pilot | — | 30 MW | Data Center Dynamics | |
| STT Seoul 1 | — | 30 MW | Data Center Dynamics | |
| Valar Atomics AI factory | — | 30 MW | Techcrunch | |
| Vanda 3 | — | 30 MW | Data Center Dynamics | |
| Bonner Mill Industrial Park data center | US — Rest of US (composite) | 29 MW | Data Center Dynamics | |
| Guadalajara | — | 29 MW | Data Center Dynamics |