Every build we can see — whether or not we rate it. A record here asserts two things and no more: that the build exists, and where we read about it. Capacity, status and location are reported figures, attributed to their source and never treated as canonical.
When a build earns a primary-source spine we verify it, score it, and it moves to the rated tier — where the number is ours and we stand behind it. How a build gets rated.
builds tracked
rated
markets scored
| Build | Jurisdiction (reported) | Capacity (reported) | State | Source |
|---|---|---|---|---|
| Pregnana Innovation Campus | — | 150 MW | Data Center Dynamics | |
| RiverHook Village 18 | — | 150 MW | Data Center Dynamics | |
| Rock County solar and battery storage | US — Rest of US (composite) | 150 MW | Data Center Dynamics | |
| Smedjebacken Campus | — | 150 MW | Data Center Dynamics | |
| Union County Campus | — | 150 MW | Data Center Dynamics | |
| Manor Farm data center | — | 147 MW | Data Center Dynamics | |
| Kemps Creek | — | 144 MW | Data Center Dynamics | |
| NDP1 | — | 144 MW | Data Center Dynamics | |
| FRONTia Project | — | 140 MW | thenextweb.com | |
| Iver data centre campus | — | 140 MW | Data Centre Review | |
| Lumen Farm | US — Texas (ERCOT) | 140 MW | Interesting Engineering | |
| Hillwood Warsaw Facility | — | 130 MW | Data Center Dynamics | |
| IXcellerate third Moscow campus | — | 130 MW | Data Center Dynamics | |
| PowerHouse Louisville | — | 130 MW | Data Center Dynamics | |
| Data Center Valley | — | 125 MW | thenextweb.com | |
| DeSoto I Solar Farm | — | 125 MW | Walton EMC | |
| Tritax Big Box Chelmsford | — | 125 MW | Data Center Dynamics | |
| Elbow Creek wind farm data center | US — Texas (ERCOT) | 122 MW | Data Center Dynamics | |
| Tydal campus | — | 121 MW | thenextweb.com | |
| 120MW data center in Lombardy, Italy | — | 120 MW | Data Center Dynamics | |
| Atlanta campus (95 acres near Lithia Springs) | US — Georgia (Southern/Georgia Power) | 120 MW | DataBank | |
| FlexDomes | — | 120 MW | thenextweb.com | |
| Hämeenlinna data center | — | 120 MW | Data Center Dynamics | |
| Maysville, Georgia data center | US — Georgia (Southern/Georgia Power) | 120 MW | Data Center Dynamics | |
| NorthVault AI Ontario Campus | — | 120 MW | Data Center Dynamics | |
| Pepper Solar | US — Texas (ERCOT) | 120 MW | Data Center Dynamics | |
| Sabey Oregon data center campus | US — Rest of US (composite) | 120 MW | Data Center Dynamics | |
| SDC Umatilla | US — Rest of US (composite) | 120 MW | Data Center Dynamics | |
| SM1A | — | 120 MW | Data Center Dynamics | |
| Teraco solar facility | — | 120 MW | Renewable Energy World | |
| Sien Real Warsaw Data Center | — | 118 MW | Data Center Dynamics | |
| Google Nevada geothermal project | US — Rest of US (composite) | 115 MW | Power Engineering | |
| Martin County Solar Project | US — Rest of US (composite) | 111 MW | Canary Media | |
| Iowa and Grant counties wind farm | US — Rest of US (composite) | 110 MW | Data Center Dynamics | |
| Flexential Talty Data Center Campus | — | 108 MW | Data Center Dynamics | |
| Snipesville II Solar Farm | — | 107 MW | Walton EMC | |
| Dresden Facility - Generation Capacity | — | 106 MW | Data Center Dynamics | |
| Menlo Digital MD-VA3 | — | 104 MW | Data Center Dynamics | |
| St Leonards | — | 104 MW | Data Center Dynamics | |
| Vulcan Infrastructure and Power - Development Pipeline | — | 104 MW | Data Center Dynamics | |
| Sify Navi Mumbai and Chennai data centers | — | 103 MW | Data Center Dynamics | |
| 411 Pegasus Parkway | — | 100 MW | Data Center Dynamics | |
| Allentown, Pennsylvania data center | US — Rest of US (composite) | 100 MW | Data Center Dynamics | |
| APR Energy mobile gas turbines deployment | — | 100 MW | Data Center Dynamics | |
| Bangkok 4 | — | 100 MW | Data Center Dynamics | |
| Bitdeer Fox Creek | Singapore | 100 MW | Data Center Dynamics | |
| Bloom Energy Equinix deployment | — | 100 MW | Data Center Dynamics | |
| Bloom Energy solid oxide fuel cells | — | 100 MW | Latitude Media | |
| Blue Economy VITAL 100 MW Kraaken | — | 100 MW | New Atlas | |
| Cape Station Phase 1 | — | 100 MW | Canary Media |