YTL Power International

YTL Power International

Other

YTL Power International is a tracked other in the Compute Institute project database holding 1 role across 1 project in 1 jurisdiction (Malaysia — Johor (Johor-Singapore SEZ)), a combined 500 MW of tracked capacity exposure. Every role below is backed by cited source documents.

Exposure

Tracked capacity
500 MW
Evidenced capital
Projects
1
Jurisdictions touched
Malaysia — Johor (Johor-Singapore SEZ)

Tracked MW by project status

Operating
500 MW

Portfolio

Every tracked role this entity holds on a project. Each row derives from cited claims; sources are listed below.

Project
Role
Status
Capacity
Committed capital
Jurisdiction
YTL Green Data Center Park (Kulai)
Developer
Operating
500 MW Malaysia — Johor (Johor-Singapore SEZ)

Sources & citations

Canonical claims backing this entity record and its project roles, from cited source documents graded on the E1 (strongest) – E5 (weakest) evidence ladder.

  1. YTL Power · Apr 21, 2022 · backs: role

    https://www.ytl.com/press-releases/ytl-green-data-center-park-launches-in-johor-the-first-integrated-data-center-park-powered-by-renewable-solar-energy-in-malaysia-2/