Every build we can see — whether or not we rate it. A record here asserts two things and no more: that the build exists, and where we read about it. Capacity, status and location are reported figures, attributed to their source and never treated as canonical.
When a build earns a primary-source spine we verify it, score it, and it moves to the rated tier — where the number is ours and we stand behind it. How a build gets rated.
builds tracked
rated
markets scored
| Build | Jurisdiction (reported) | Capacity (reported) | State | Source |
|---|---|---|---|---|
| TECfusions Virginia (Clarksville) | US — Virginia (PJM/Dominion) | 37 MW | Data Center Dynamics | |
| Edged US Mesa, Arizona facility | US — Rest of US (composite) | 36 MW | Capacity Media | |
| Mossy Hill wind farm | — | 36 MW | Data Center Dynamics | |
| NOVVA Bayview | — | 36 MW | thenextweb.com | |
| SAT2-SAT3 | — | 36 MW | Data Center Dynamics | |
| ECL data center in California | US — Rest of US (composite) | 35 MW | Data Center Dynamics | |
| European sovereign AI cloud | — | 35 MW | Data Center Dynamics | |
| Chicago stock exchange building redevelopment | US — Rest of US (composite) | 33 MW | Data Center Dynamics | |
| Elk River Capital/Swervo data center | — | 33 MW | Data Center Dynamics | |
| London19 | — | 33 MW | Data Center Dynamics | |
| DFW02 | — | 32 MW | Data Center Dynamics | |
| Hive Boden facility | — | 32 MW | Data Center Dynamics | |
| Stockholm 4 South | — | 32 MW | Data Center Dynamics | |
| AUH6 | United Arab Emirates | 32 MW | DCD | |
| Fagelas wind farm | — | 32 MW | Data Center Dynamics | |
| TKW1 | — | 31 MW | Data Center Dynamics | |
| 30-megawatt computing facility | — | 30 MW | Interesting Engineering | |
| Ambrosia Energy first commercial power plant | US — Texas (ERCOT) | 30 MW | Techcrunch | |
| AMD and Rackspace AI Infrastructure Deployment | — | 30 MW | HPCwire | |
| Ampera Integrated Energy Architecture | — | 30 MW | Tom’s Hardware | |
| AtlasEdge Lisbon campus | — | 30 MW | Capacity Media | |
| AUH4 | — | 30 MW | MEED | |
| Constellation Energy - Walmart (Dresden) | — | 30 MW | POWER Magazine | |
| Constellation-Meta nuclear uprate | — | 30 MW | Canary Media | |
| Juhansuo | — | 30 MW | Data Center Dynamics | |
| Krambu Spokane Washington site | US — Rest of US (composite) | 30 MW | Data Center Dynamics | |
| Legacy Investing downtown Minneapolis data center | — | 30 MW | Network World | |
| Oakland University data center | — | 30 MW | Data Center Dynamics | |
| Savonlinna Data Center | — | 30 MW | Data Center Dynamics | |
| Seatrium 30MW offshore data center pilot | — | 30 MW | Data Center Dynamics | |
| STT Seoul 1 | — | 30 MW | Data Center Dynamics | |
| SWI Compute UK factory | — | 30 MW | thenextweb.com | |
| Valar Atomics AI factory | — | 30 MW | Techcrunch | |
| Vanda 3 | — | 30 MW | Data Center Dynamics | |
| Bonner Mill Industrial Park data center | US — Rest of US (composite) | 29 MW | Data Center Dynamics | |
| Guadalajara | — | 29 MW | Data Center Dynamics | |
| neocloud data center solar installation | — | 28 MW | Power Engineering | |
| Inman Solar Effingham County | US — Georgia (Southern/Georgia Power) | 27 MW | Bisnow | |
| Prague Gateway DC | — | 26 MW | Data Center Dynamics | |
| Anthropic 20-30MW data center deployment | — | 25 MW | Data Center Dynamics | |
| Energy Vault Snyder modular data center deployment | US — Texas (ERCOT) | 25 MW | Data Center Dynamics | |
| Fujitsu Australian data center portfolio | — | 25 MW | Data Center Dynamics | |
| Globalinx Virginia Beach CLS campus Phase 3 | US — Virginia (PJM/Dominion) | 25 MW | Data Center Dynamics | |
| IBM Almaden Research Center | — | 25 MW | Data Center Dynamics | |
| Keppel floating facility Singapore | Singapore | 25 MW | Data Center Dynamics | |
| Microsoft Sandnes | — | 25 MW | Data Center Dynamics | |
| Tokyo facility | — | 25 MW | Data Center Dynamics | |
| 24MW wind farm in South Wales | — | 24 MW | Data Center Dynamics | |
| China subsea facility off Shanghai | — | 24 MW | Tom’s Hardware | |
| FRA7 | — | 24 MW | Data Center Dynamics |