Rowan Digital Infrastructure Maryland Campus Phase Two

This build is tracked, not rated. We hold a source for it and we are showing you exactly what that source says — but we have not verified these figures, and no Project Risk Score has been issued. Nothing on this page is a Compute Institute judgment.

What the source reports

Capacity
2,500 MW
Capital cost
$1,240,000,000 USD
Jurisdiction
US — Rest of US (composite)
Lifecycle status
not reported

Reported by Rowan Digital Infrastructure on 25 February 2025. We have not verified these figures.

What is missing before we would rate it

  • A verified lifecycle status — planned, permitting, permitted, under construction.
  • A second independent source. One document is a report; two is corroboration.

A rating requires an E1–E2 primary spine and passes our verification step; the methodology sets out the full ladder.

Claims on file

  • project.capacity_mw 2,500 MW
    E2
  • project.capex_usd $2.2 billion
    E2
  • project.capex_usd $1.24 billion
    E2
  • project.capex_usd $975 million
    E2