What the source reports
- Capacity
-
60 MW
- Capital cost
-
$2,650,000,000 USD
- Jurisdiction
-
US — Texas (ERCOT)
- Lifecycle status
-
not reported
Reported by DataBank on 15 June 2026. We have not verified these figures.
What is missing before we would rate it
-
—
A primary source (E1 regulatory record or E2 company disclosure). What we hold is reporting, not a filing.
-
—
A verified lifecycle status — planned, permitting, permitted, under construction.
-
—
A second independent source. One document is a report; two is corroboration.
A rating requires an E1–E2 primary spine and passes our verification step; the
methodology sets out the full ladder.
Claims on file
-
project.capacity_mw
60 megawatts
E4
-
project.capacity_mw
60 megawatts incremental IT capacity for fourth building
E4
-
project.capacity_mw
60
E4
-
project.capex_usd
$2.65 billion total financing
E4
-
project.capex_usd
$2.65 billion total financing
E4
-
project.capex_usd
2000000000