Compute Institute
Ratings for the physical buildout of AI
The Register
Tracked · unrated

Google Jackson County Data Center Campus

This build is tracked, not rated. We hold a source for it and we are showing you exactly what that source says — but we have not verified these figures, and no Project Risk Score has been issued. Nothing on this page is a Compute Institute judgment.

What the source reports

Capacity
300 MW
Capital cost
$1,500,000,000 USD
Jurisdiction
US — Rest of US (composite)
Lifecycle status
operating

Reported by Data Center Dynamics on 16 June 2026. We have not verified these figures.

What is missing before we would rate it

  • A primary source (E1 regulatory record or E2 company disclosure). What we hold is reporting, not a filing.
  • A second independent source. One document is a report; two is corroboration.

A rating requires an E1–E2 primary spine and passes our verification step; the methodology sets out the full ladder.

Claims on file

  • project.announced_date 2015-12-31
    E4
  • project.capacity_mw 300MW
    E4
  • project.capex_usd $1.5 billion
    E4
  • project.capex_usd $1.5 billion
    E4
  • project.status operating
    E4
  • project.status construction
    E3