Compute Institute
Ratings for the physical buildout of AI
The Register
Tracked · unrated

AEP Indiana nuclear project

This build is tracked, not rated. We hold a source for it and we are showing you exactly what that source says — but we have not verified these figures, and no Project Risk Score has been issued. Nothing on this page is a Compute Institute judgment.

What the source reports

Capacity
960 MW
Capital cost
not reported
Jurisdiction
India
Lifecycle status
announced

Reported by Utility Dive on 19 October 2026. We have not verified these figures.

What is missing before we would rate it

  • A primary source (E1 regulatory record or E2 company disclosure). What we hold is reporting, not a filing.
  • A second independent source. One document is a report; two is corroboration.

A rating requires an E1–E2 primary spine and passes our verification step; the methodology sets out the full ladder.

Claims on file

  • project.capacity_mw 960 MW
    E4
  • project.status announced
    E4