Ratings for the physical buildout of AI
The Register
Tracked · unrated

Abilene AI Factory Campus (New)

This build is tracked, not rated. We hold a source for it and we are showing you exactly what that source says — but we have not verified these figures, and no Project Risk Score has been issued. Nothing on this page is a Compute Institute judgment.

What the source reports

Capacity
900 MW
Capital cost
not reported
Jurisdiction
US — Texas (ERCOT)
Lifecycle status
construction

Reported by Crusoe on 1 March 2026. We have not verified these figures.

What is missing before we would rate it

  • A second independent source. One document is a report; two is corroboration.

A rating requires an E1–E2 primary spine and passes our verification step; the methodology sets out the full ladder.

Claims on file

  • project.announced_date 2026-03-27
    E2
  • project.capacity_mw 900 MW
    E2
  • project.capacity_mw 2.1 GW
    E2
  • project.capacity_mw 900 MW
    E4
  • project.status construction
    E2